专利摘要:
A process for producing clad pipe comprises forming a hollow body (S10) of base material, bonding a cladding material metallurgically to the base material (S12) to form a composite body and subsequently extruding the composite body to form a pipe. This process allows the metallurgical bond to be validated using non-destructive methods prior to extrusion. Any areas that are unbonded will be detected, thereby reducing wastage. Moreover, because the metallurgical bond is achieved prior to extrusion, the cladding thickness is controlled during the extrusion process, avoiding migration of the clad material into the base material by disproportionate amounts.
公开号:US20010008156A1
申请号:US09/384,183
申请日:1999-08-27
公开日:2001-07-19
发明作者:David Neill
申请人:Forth Tool and Valve Ltd;
IPC主号:B23K9-048
专利说明:
[0001] The present invention relates to the manufacture of pipes and in particular, but not exclusively, to the manufacture of extruded pipes having an inner layer of a corrosion and/or erosion resistant material. [0001]
[0002] It is known to manufacture pipes by forming a tubular metal billet of volume equal to that of the eventual pipe and extruding the billet through an annular die of appropriate dimensions. This technique can also be used to manufacture pipes having a layer of cladding on their internal surface. Such pipes are widely used to provide a cost-effective solution for corrosion and/or erosion protection for internal surfaces of pipes. The base material of the pipe can be produced from relatively inexpensive material (typically carbon steel) and the liner or cladding can be chosen to take into account the service condition and may, for example, be corrosion or erosion resistant. The material forming the cladding layer is usually much more expensive that the base layer but by providing only a layer of cladding material the cost is significantly reduced. [0002]
[0003] Such clad pipes are currently produced by inserting a tube of corrosion resistant cladding material into a tubular billet (typically of carbon steel) and extruding the composite billet thus formed in the conventional manner. The resultant pipe is formed with an internal layer of cladding and the changes which the billet undergoes during extrusion cause the cladding material and the base material to be metallurgically bonded to one another. Although the known technique is very useful it is known to produce inconsistencies in bonding and because of this the eventual wastage from the completed product is high. Furthermore, it has been found that by using this method it is very difficult to control the clad thickness, since the cladding material migrates into the base material by a disproportionate amount, resulting in thinning of the base material and thus losing the design capabilities. [0003]
[0004] It is an object of the present invention to provide a process for producing clad pipe which overcomes or alleviates the problems with the prior art. [0004]
[0005] In accordance with the present invention a process for producing clad pipe comprises forming a hollow body of base material, bonding a cladding material metallurgically to the base material to form a composite body and subsequently extruding the composite body to form a pipe. [0005]
[0006] Preferably, the cladding layer is metallurgically bonded to the base material by depositing a weld overlay on the base material. A suitable method of depositing such a weld overlay would be to use the PROCLAD™ technique of Forth Tool & Valve Limited of Glenrothes, Fife, Scotland. [0006]
[0007] By metallurgically bonding a cladding layer to the base material it is possible to validate the integrity of the bond prior to extrusion. It has also been found that the extruded product thus formed has fewer bonding flaws compared with the pipes produced in the prior art method. Moreover the finished product exhibits low dilution characteristics in the clad layer, which provides optimum properties in the clad layer to combat against erosion, corrosion or the like. [0007]
[0008] Preferably, the cladding layer, e.g. the weld overlay, is machined prior to extrusion taking place. The integrity of the metallurgical bond between the cladding layer and the base material may also be validated (e.g. by x-ray or ultrasonic inspection) prior to extrusion. [0008]
[0009] By the way of example only, a specific embodiment of the present invention will now be described, with reference to the accompanying drawing which is a flow diagram illustrating an embodiment of process in accordance with the present invention. [0009]
[0010] The Figure illustrates a flow diagram illustrating an embodiment of process for producing a pipe in accordance with the present invention. At step [0010] 10 (“step” will hereafter be abbreviated to “S”) a tubular billet of suitable base material, of, for example carbon, low alloy or stainless steel, is formed e.g. by the Mannesmann Pilger process. The dimensions of a typical billet might be between 200 mm and 1500 mm in length, between 100 mm and 1500 mm in diameter externally and between 30 mm and 600 mm internally. At S12 a layer of cladding material is metallurgically bonded to the internal surface of the tubular billet. Preferably, the cladding material is deposited on the internal cylindrical face of the billet as a weld overlay. The depth of the cladding is typically from 6 mm to 100 mm.
[0011] A suitable method of depositing the weld overlay would be by the use of the PROCLAD™ system of Forth Tool & Valve Limited, Fife, Scotland. The cladding material and the welding conditions will vary with the requirements of the end pipe user. Typically the cladding layer might comprise Inconel 624™ or Incoly 825™ deposited using a hot wire welding process. However, other cladding materials such as Hastalloy C22, 300 Series Stainless Steels, Monel, cobalt based alloys, aluminum bronze and the like can be deposited using hot and cold wire GTAW (Gas Tungsten Arc Welding), dual gas GTAW, plasma transferred are, powder or hot and cold wire welding processes. [0011]
[0012] At S[0012] 14 the welded layer is then machined in order to produce a layer of cladding material of accurate thickness. A typical thickness might be, for example, between 6 mm and 100 mm. At S16 the composite billet may then be inspected for flaws in the bond between the cladding layer and the base layer (e.g. by x-ray or ultrasonic inspection, dye penetrant of Elcometer) and assuming that the composite billet is acceptable at S18 it is extruded to form pipe. Alternatively, or in addition, the inspection may take place prior to machining.
[0013] Optionally, at S[0013] 19 the extruded shell may be further cold worked down into smaller sizes to obtain specific sizes and to control wall thickness tolerances.
[0014] At S[0014] 20, following extrusion (and, optionally, cold reduction), the pipe may then at heat treated in order to establish the mechanical properties of the base pipe, which might typically have a yield strength of between 205N/mm2 and 1030/Nmm2. At S22, following heat treatment, a final inspection of the pipe takes place which may include, for example, one or more of radiography, ultrasonic, eddy current and liquid penetration inspections.
[0015] Each of steps S[0015] 10 to S22 is, when considered individually, conventional and well known to those skilled in the art and thus will not be described in detail hereafter.
[0016] The resultant pipe comprises an outer base layer and an internal cladding layer which is metallurgically bonded to the base layer. By validating the metallurgical bond using nondestructive methods prior to extrusion, any areas that are unbonded will be detected, which will reduce wastage. Moreover, because the metallurgical bond is achieve prior to extrusion, the cladding thickness is controlled during the extrusion process, avoiding migration of the clad material into the carbon steel by disproportionate amounts and providing optimum properties in the cladding layer to combat against erosion or corrosion. [0016]
[0017] The invention is not restricted to the details of the foregoing embodiment. [0017]
权利要求:
Claims (9)
[1" id="US-20010008156-A1-CLM-00001] 1. The process for producing clad pipe, comprising forming a hollow body of base material, bonding a cladding material metallurgically to the base material to form a composite body and subsequently extruding the composite body to form a pipe.
[2" id="US-20010008156-A1-CLM-00002] 2. A process as claimed in
claim 1 , wherein the
claim 1 , wherein the cladding layer is metallurgically bonded to the base material by depositing a weld overlay on the base material.
[3" id="US-20010008156-A1-CLM-00003] 3. A process as claimed in
claim 1 , wherein the cladding layer is machined prior to extrusion taking place.
[4" id="US-20010008156-A1-CLM-00004] 4. A process as claimed in
claim 1 , wherein the integrity of the metallurgical bond between the cladding layer and the base material is inspected and/or validated prior to extrusion.
[5" id="US-20010008156-A1-CLM-00005] 5. A process as claimed in
claim 1 , wherein the hollow body comprises a tubular billet.
[6" id="US-20010008156-A1-CLM-00006] 6. A process as claimed in
claim 1 , wherein the cladding material is deposited on the internal surface of the hollow body.
[7" id="US-20010008156-A1-CLM-00007] 7. A process as claimed in
claim 1 , wherein after extrusion, the pipe is cold worked.
[8" id="US-20010008156-A1-CLM-00008] 8. A process as claimed in
claim 1 , wherein after extrusion, the pipe is subjected to heat treatment.
[9" id="US-20010008156-A1-CLM-00009] 9. A pipe produced by a process as claimed in
claim 1 .
类似技术:
公开号 | 公开日 | 专利标题
US6350327B2|2002-02-26|Process for manufacturing pipes
US4966748A|1990-10-30|Methods of producing clad metals
CA1211278A|1986-09-16|Method for producing a clad steel pipe
WO2004088191A2|2004-10-14|Method of manufacturing cold worked, high strength seamless cra pipe
CN106808078A|2017-06-09|A kind of diffusion welding method of dissimilar metal
US6691397B2|2004-02-17|Method of manufacturing same for production of clad piping and tubing
US4886203A|1989-12-12|Method of producing by brazing bimetallic cylindrical articles
US4949895A|1990-08-21|Process of fixing internally titanium-lined doubled-walled tubing structure to titanium tube sheet
US5261591A|1993-11-16|Method of explosively bonding composite metal structures
EP0695598B1|1997-11-12|Method of manufacturing dissimilar metal transition pipe joint
EP1324879B1|2008-05-28|Metallurgically bonded layered article having a curved surface
US20060186093A1|2006-08-24|Method and Device for Producing Metal Composite Block Material
RU2036063C1|1995-05-27|Method of making laminate metallic tubes
JP2707852B2|1998-02-04|Manufacturing method of double metal tube
US20190022801A1|2019-01-24|Method of making a corrosion resistant tube
JP3310756B2|2002-08-05|Manufacturing method of high strength corrosion resistant branch pipe
SU893280A1|1981-12-30|Tube production method
JP2635769B2|1997-07-30|Manufacturing method of seamless aluminum clad tube
JP2000271639A|2000-10-03|Plated steel tube and its manufacture
JPH0647179B2|1994-06-22|Method for manufacturing dissimilar metal pipe fittings
JP2504118B2|1996-06-05|Clad steel bar manufacturing method
JPH08243851A|1996-09-24|Manufacture of double layer steel pipe excellent in work site welding executability
CA1167210A|1984-05-15|Method of preparing clad steels
JPH064190B2|1994-01-19|Pipe end seal welding method for corrosion resistant double pipe
JPH0790329A|1995-04-04|Manufacture of surface coating metal
同族专利:
公开号 | 公开日
GB2341125A|2000-03-08|
DE69922214T2|2005-12-01|
ES2232163T5|2011-12-28|
GB9920416D0|1999-11-03|
JP2002523246A|2002-07-30|
US6350327B2|2002-02-26|
DK1107845T3|2005-03-21|
EP1107845B2|2011-08-03|
DK1107845T4|2011-11-14|
EP1107845A1|2001-06-20|
GB2341125B|2003-03-26|
PT1107845E|2005-03-31|
AT283138T|2004-12-15|
CA2299679C|2008-04-15|
ES2232163T3|2005-05-16|
CA2299679A1|2001-08-28|
DE69922214T3|2012-03-22|
DE69922214D1|2004-12-30|
GB9818757D0|1998-10-21|
EP1107845B1|2004-11-24|
WO2000012254A1|2000-03-09|
JP5489382B2|2014-05-14|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题
US20050079378A1|2003-08-28|2005-04-14|Sandvik Ab|Metal dusting resistant product|
CN111036705A|2019-12-19|2020-04-21|湖南金天钛业科技有限公司|Large-caliber titanium alloy seamless pipe and preparation method thereof|GB1207675A|1967-03-16|1970-10-07|Int Combustion Holdings Ltd|Improvements in or relating to methods and apparatus for the manufacture of composite metal tubing|
US3753704A|1967-04-14|1973-08-21|Int Nickel Co|Production of clad metal articles|
GB1188995A†|1967-05-09|1970-04-22|Int Combustion Holdings Ltd|Improvements in or relating to the Cladding of Metal Surfaces by Fusion Welding|
GB1478962A†|1973-06-06|1977-07-06|Yorkshire Imperial Metals Ltd|Composite metal elongate product|
US4016008A†|1975-07-31|1977-04-05|The International Nickel Company, Inc.|Clad metal tubes|
JPS531164A|1976-06-25|1978-01-07|Kobe Steel Ltd|Stainless steel clad steel pipe|
JPS5851772B2|1977-04-27|1983-11-18|Showa Aluminium Co Ltd||
DE3044589C2†|1980-11-24|1985-08-08|Mannesmann AG, 4000 Düsseldorf|Process for the production of seamless, externally clad pipes|
JPS58145381A|1982-02-23|1983-08-30|Mitsubishi Heavy Ind Ltd|Manufacture of clad steel tube|
JPS6123850B2†|1982-06-11|1986-06-07|Nippon Steel Corp||
JPS59107739A†|1982-12-13|1984-06-22|Nippon Light Metal Co Ltd|Production of composite member|
SE447804B|1983-04-20|1986-12-15|Kuroki Kogyosho Kk|PROCEDURE FOR MANUFACTURING COMPOSITE STALLS|
US4518111A†|1983-10-17|1985-05-21|Explosive Fabricators, Inc.|Method of fabricating a bi-metal tube|
JPH0532132B2|1983-11-15|1993-05-14|Sumitomo Metal Ind||
US4620660A|1985-01-24|1986-11-04|Turner William C|Method of manufacturing an internally clad tubular product|
DE8605584U1|1985-12-10|1986-05-07|NLW Fördertechnik GmbH i.K., 46509 Xanten|Piston tube or rod for hydraulic pit rams and thrust pistons|
JPS62187509A|1986-02-13|1987-08-15|Nippon Steel Corp|Production of seamless composite steel pipe|
JPS62220212A|1986-03-19|1987-09-28|Kobe Steel Ltd|Manufacture of zirconium liner tube stock|
GB2258384B|1988-09-14|1993-05-26|Flodor Finance Sa|Bagged snacks|
CA2003295C|1988-12-09|1995-07-04|Yoshihisa Ohashi|Process for manufacturing clad metal tubing|
US4995548A†|1989-04-10|1991-02-26|Teledyne Industries, Inc.|Preparation process for coextrusion billets with multiple metallic cylindrical layers|
JPH035014A|1989-05-31|1991-01-10|Nkk Corp|Manufacture of clad shape steel by hot extrusion|
US4977034A|1989-11-07|1990-12-11|Teledyne Industries, Inc.|Process for coextrusion billets with multiple metallic cylindrical layers by hot isostatic pressing and product|
GB9008273D0†|1990-04-11|1990-06-13|Ici Plc|Manufacture of bi-metallic tube by explosive bonding,hot extrusion and co-extrusion|
EP0454911B1†|1990-04-25|1993-10-20|Teledyne Industries Inc|A preparation process for coextrusion billets with multiple metallic cylindrical layers|
GB2257384B|1991-07-12|1995-03-01|Ici Plc|Method of manufacturing laminer-metallic tubing|
JP3485980B2†|1994-10-03|2004-01-13|Jfeスチール株式会社|Method for producing welded clad steel pipe for boiler|
US5711826A|1996-04-12|1998-01-27|Crs Holdings, Inc.|Functionally gradient cladding for nuclear fuel rods|
DE19644999C1|1996-10-30|1998-08-13|Schulz Gmbh Wilhelm|Process for manufacturing internally clad metal pipes|
JPH1144497A|1997-07-23|1999-02-16|Furukawa Electric Co Ltd:The|Composite tube for refrigerant passage of aluminum alloy and its manufacture|US6691397B2|2001-10-16|2004-02-17|Chakravarti Management, Llc|Method of manufacturing same for production of clad piping and tubing|
US7922065B2|2004-08-02|2011-04-12|Ati Properties, Inc.|Corrosion resistant fluid conducting parts, methods of making corrosion resistant fluid conducting parts and equipment and parts replacement methods utilizing corrosion resistant fluid conducting parts|
AU2011202839B2|2004-08-02|2012-11-01|Ati Properties, Inc.|Corrosion resistant fluid conducting parts, and equipment and parts replacement methods utilizing corrosion resistant fluid conducting parts|
US20060037660A1|2004-08-20|2006-02-23|Kinnally Kevin J|Hydrogen conduit and process for producing same|
DK1827727T3|2004-12-21|2008-09-15|Bergrohr Gmbh Siegen|Process for producing a multilayer tube|
US20070128463A1|2005-11-09|2007-06-07|Gwendolyn Dixon| multi-alloy monolithic extruded structural member and method of producing thereof|
US20070251288A1|2006-04-26|2007-11-01|Cole David J|Method of manufacturing elongate members and workpiece therefor|
US20110017339A1|2009-07-23|2011-01-27|Chakravarti Management, Llc|Method for rolled seamless clad pipes|
AU2012225214B2|2011-03-10|2016-02-25|Mesocoat, Inc.|Method and apparatus for forming clad metal products|
US10118259B1|2012-12-11|2018-11-06|Ati Properties Llc|Corrosion resistant bimetallic tube manufactured by a two-step process|
KR20150127719A|2013-03-15|2015-11-17|메소코트, 인코포레이티드|Ternary ceramic thermal spraying powder and coating method|
US10112254B2|2014-08-21|2018-10-30|Huntington Alloys Corporation|Method for making clad metal pipe|
法律状态:
1999-09-30| AS| Assignment|Owner name: FORTH TOOL & VALVE LIMITED, SCOTLAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:NEILL, DAVID;REEL/FRAME:010274/0756 Effective date: 19990920 |
2002-02-12| STCF| Information on status: patent grant|Free format text: PATENTED CASE |
2004-06-14| AS| Assignment|Owner name: HAVENUP (2) LIMITED, SCOTLAND Free format text: CHANGE OF NAME;ASSIGNOR:FORTH TOOL & VALVE LIMITED;REEL/FRAME:015452/0135 Effective date: 20020108 Owner name: PROCLAD INTERNATIONAL LIMITED, SCOTLAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HAVENUP (2) LIMITED;REEL/FRAME:015452/0928 Effective date: 20031013 |
2005-08-03| FPAY| Fee payment|Year of fee payment: 4 |
2009-07-29| FPAY| Fee payment|Year of fee payment: 8 |
2013-07-31| FPAY| Fee payment|Year of fee payment: 12 |
优先权:
申请号 | 申请日 | 专利标题
GB9818757.8||1998-08-27||
GBGB9818757.8A|GB9818757D0|1998-08-27|1998-08-27|Process for manufacturing pipes|
GB9818757||1998-08-27||
CA002299679A|CA2299679C|1998-08-27|2000-02-28|Process for manufacturing pipes|
[返回顶部]