专利摘要:
1523944 Replacing railway track FRANZ PLASSER BAHNBAUMASCHINEN INDUSTRIE GmbH 12 July 1976 [11 July 1975] 28970/76 Heading E1G Apparatus for replacing railway track sections by new sleepers and rails comprises a bridge-like track-laying wagon 1 having ontrack carriage units 2, 3 and an off-track crawler unit 4 provided with a vibration drive 18 and ballast plough 17 for levelling the ballast after the track panel 7 has been removed by winch 8 and transported in the working direction A onto the adjoining wagon by means of hooks 9 running in the guide track 12 arranged below an endless conveyor 10. New sleepers 11 are conveyed against the working direction from an adjoining wagon, by conveyor 10 to a lowering unit 15 which deposits the sleeper on the levelled ballast at the desired spacing. New rails 23' or 23 may either also be delivered from a stock wagon against the working direction or from a stock situated alongside the new sleepers.
公开号:SU884578A3
申请号:SU762381852
申请日:1976-07-09
公开日:1981-11-23
发明作者:Тойрер Иозеф;Бруннингер Манфред
申请人:Франц Плассер Банбаумашинен-Индустигезельшафт Мбх;
IPC主号:
专利说明:

on the platforms are not links path, and sleepers.
The rail replacement device and the rail gauge contains a bridge-like truss 1 supported by rail trolleys 2 li 3 and a crawler trolley 4. 8. On farm 1, a conveyor 9 is mounted. . Farm 1 also has a CMOHTnpojjaH conveyor for old railroad track elements, including grippers 14 mounted to move along form 1 along the rails 15. Before farm 1, during operation of the device during operation, {along arrow A) platforms 16 are installed elements of the railway track. A conveyor 9 for new sleepers and a conveyor for old railway elements are located between the platforms 16 and a device 11 for laying new sleepers, and a conveyor 9 is located above the conveyor for old railway elements.
A plow 17 is fixed on the tracked carriage 4 for leveling the ballast and its vibrating compactor 18.
Platform 16 is equipped with a conveyor belt L9 for transporting links 5, cranes 20 mounted for movement along platforms, and a mechanism 21 for turning new sleepers 10. Platform 22 next to platform 16 with cranes 20 is loaded with links 5, and FIG. 3 sleepers 10; therefore, in FIG. 2 shows the transportation of the links 5 to the platform 22, and FIG. 3 - transportation of new sleepers 10 to the mechanism 21 of their rotation.
The device works as follows.
Farm 1 moves in arrow A and the carriage 2 moves in the old way, and carriage 4 moves along the ballast leveled by the plow 17 and compacted by the vibrating compactor 18. Link 5 is gripped and lifted by the device 8, and by hooks 14, conveyor 19 and cranes 20 are transported to the platform 22. Figs. 2 and 3 show one platform 22 each, however, the rail replacement device, and the sleepers includes several platforms 22, which, for example, are loaded with new sleepers at the beginning of the track to be repaired, and then used for links 5. Transport ION new ties to their place of
laying is performed simultaneously with the removal of links 5. The sleepers 10 are transported by cranes 20 individually or in batches, turned by mechanism 21 and conveyor 9 are moved to the place of laying, where fixture 11 is placed at the required interval on the ballast compacted by vibrator 18. On the sleepers 10, lying on the ballast, new rails 13 are laid, which are then attached to the sleepers.
Cranes 20, transporting links 5 to platforms 22, during the return stroke transport new sleepers 10, i.e. taps 20 are used efficiently without idle runs. If the process of feeding the sleepers 10 cannot be carried out simultaneously with the removal of links 5, then the belt conveyor 9 is loaded with sleepers in an amount sufficient at least to be laid after removing three or four links 5. To capture and then transport the links 5 to the platforms 22 taps 20 equipped with bodies 23, also used to grip sleepers
The proposed device for the replacement of rails and railway sleepers increases the performance during its repair.
权利要求:
Claims (3)
[1]
1. A device for replacing rails and railway sleepers, comprising a farm supported on trolleys, platforms on one side of it for railway track components, conveyors mounted on the farm for new sleepers and old rail track components and tools for laying new sleepers and rails , with conveyors for new sleepers and old railway track elements placed between the said platforms and a device for laying new sleepers, and a conveyor for new sleepers located above the end A driver for old railway elements, characterized in that, in order to increase productivity by providing the possibility of removing old railway elements from parts, it is equipped with lifting devices for old railway elements, cranes installed on platforms with the ability to move along them, and the conveyor for the old elements of the railway track is provided with sleeper grips.
[2]
2. The device according to claim 1, characterized in that it is provided with a mechanism for turning new sleepers
5 8845786
and an additional conveyor for a bogie bogie carrying a plow for old railroad leveling elements and its vibroput mounted on an adjoining compaction layer to the farm platform. Sources of information
[3]
3. The device according to PP. 1 and 2., about t-tnye in attention at examination
characterized by the fact that it is 1. Austria Patent No. 313955,
equipped with farm gu-cl. 19a 35, 11.03.74.
-C4J
.
类似技术:
公开号 | 公开日 | 专利标题
SU884578A3|1981-11-23|Device for changing rails and sleepers of railroad
US4479439A|1984-10-30|Mobile arrangement and method for improving a track bed
US4253398A|1981-03-03|Mobile apparatus for the continuous replacement of ties
KR101477316B1|2014-12-29|Machine for the pick-up and strorage of track fastenings of a track and method thereof
CA1290618C|1991-10-15|Mobile installation for loading, transporting and unloading as well as exchanging railroad ties
SU503542A3|1976-02-15|Moving device for continuous replacement of sleepers and / or rail tracks
CA1074620A|1980-04-01|Mobile apparatus for continuous track renewal
GB2024288A|1980-01-09|Machine for replacing the rails and sleepers of a railway track
US3330219A|1967-07-11|Method and apparatus for replacing an old track by a new track
RU2039856C1|1995-07-20|Method of and machine for reconstruction of rail track
US4211170A|1980-07-08|Mobile apparatus for the continuous replacement of an old track by a new track
US3633513A|1972-01-11|Method for replacing an old track by a new track
JP4713016B2|2011-06-29|Machine and method for removing old track and laying new track
HU177251B|1981-08-28|Movable apparatus for continuous laying sleepers
US4867068A|1989-09-19|Railway train set for the renewal of railway tracks
SU1547715A3|1990-02-28|Machine for replacing sleepers of railway track
US4000699A|1977-01-04|Apparatus for replacement of rail tracks
AU676914B2|1997-03-27|A work train for replacing old sleepers of a track with new sleepers
CN1329198A|2002-01-02|Machinery for renewing track
CN1065304A|1992-10-14|Make controlledly the sink line operation mechanical of usefulness of track
US4955302A|1990-09-11|Mobile tie gang apparatus
US5778794A|1998-07-14|Machine for laying a railroad track having multiple-part carrier frame connected by a disengageable joint
RU2119001C1|1998-09-20|Track-laying machine for removing ballast material
GB1433045A|1976-04-22|Train for replacing or renewing a railway track consisting of rails and sleepers
US4862806A|1989-09-05|Mobile tie gang apparatus and tie exchange method
同族专利:
公开号 | 公开日
DE2619131C2|1985-06-27|
BE843972A|1976-11-03|
DD125224A5|1977-04-06|
FR2317418B1|1980-02-22|
ZA763122B|1977-05-25|
FR2317418A1|1977-02-04|
JPS5235008A|1977-03-17|
CH608054A5|1978-12-15|
IT1067362B|1985-03-16|
HU171328B|1977-12-28|
CA1046846A|1979-01-23|
AT345878B|1978-10-10|
GB1523944A|1978-09-06|
SE435535B|1984-10-01|
DE2619131A1|1977-02-03|
ATA538975A|1978-02-15|
IN145425B|1978-10-07|
US4046077A|1977-09-06|
SE7607658L|1977-01-12|
JPS5922002B2|1984-05-23|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题

GB805075A|1955-09-15|1958-11-26|Robert Przibu|Improvements in or relating to methods of and means for railway track replacement|
DE1017638B|1955-09-15|1957-10-17|Wilhelm Waesche|Method and device for replacing a track or rails in sections|
FR1313150A|1961-11-06|1962-12-28|Self-propelled semi-automatic machine for laying and removing railway tracks|
US3330219A|1963-09-23|1967-07-11|Plasser Franz|Method and apparatus for replacing an old track by a new track|
US3388784A|1966-08-30|1968-06-18|Rayonier Inc|Lumber receiving apparatus|
AT304601B|1968-10-16|1973-01-10|Plasser Bahnbaumasch Franz|Mobile device for treating the railway superstructure|
AT313341B|1969-10-07|1974-02-11|Plasser Bahnbaumasch Franz|Mobile device for the continuous replacement or renewal of a track|
AT316614B|1969-10-07|1974-07-25|Plasser Bahnbaumasch Franz|Mobile devices for the continuous replacement or renewal of rails and sleepers of a track|
FR2086886A5|1970-04-13|1971-12-31|Drouard Freres Entrepr|AT340985B|1976-02-02|1978-01-10|Plasser Bahnbaumasch Franz|DEVICE FOR LAYING OR CHANGING SECTIONS OF A TRACK|
CH594105A5|1976-07-27|1977-12-30|Matisa Materiel Ind Sa|
AT347493B|1976-11-05|1978-12-27|Plasser Bahnbaumasch Franz|MOBILE THRESHOLD TRANSPORT DEVICE|
CH630680A5|1977-04-21|1982-06-30|Plasser Bahnbaumasch Franz|MOBILE DEVICE FOR RECEIVING AND / OR LAYING TRACK YACHTS, SWITCH YOCS OR WHOLE SWITCHES consisting of RAILS AND SLEEPERS.|
CH600046A5|1977-04-22|1978-06-15|Matisa Materiel Ind Sa|
AT351576B|1977-06-16|1979-08-10|Plasser Bahnbaumasch Franz|MOBILE DEVICE FOR LAYING TRACKS|
AT351069B|1977-09-02|1979-07-10|Plasser Bahnbaumasch Franz|MOBILE DEVICE FOR CONTINUOUS REPLACEMENT OR RENEWING A TRACK COMPOSED OF RAILS AND SLEEPERS|
AU534740B2|1978-03-15|1984-02-16|Canron Inc. Canada Succursale De Crissier|Machine for the renewel of railway tracks|
AT359538B|1978-06-06|1980-11-10|Plasser Bahnbaumasch Franz|MOBILE THRESHOLD TRANSPORT DEVICE WITH AT LEAST ONE PORTAL CRANE|
AT359541B|1978-06-28|1980-11-10|Plasser Bahnbaumasch Franz|DEVICE FOR REPLACING THE RAILS AND SLEEPERS OF A TRACK|
AT360572B|1978-09-14|1981-01-26|Plasser Bahnbaumasch Franz|DEVICE FOR THE OPERATION OF TRANSPORT VEHICLES ON A TRACK OF VEHICLES|
AT359537B|1978-09-14|1980-11-10|Plasser Bahnbaumasch Franz|TRACK CONSTRUCTION TRAIN WITH PORTAL VEHICLES FOR THRESHOLD TRANSPORT|
US4392433A|1980-08-07|1983-07-12|Railroad Service, Inc.|Railway maintenance machine|
US4794861A|1986-10-13|1989-01-03|Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H.|Tie exchange method|
US5289780A|1992-12-03|1994-03-01|Herzog Contracting Corp.|Material handling railroad freightcar-mounted gantry and crane with toppling prevention and supplemental support upon derailment|
DE9305927U1|1993-04-20|1994-05-26|Plasser Bahnbaumasch Franz|Machine for renewing or laying a railroad track|
US5664498A|1995-10-31|1997-09-09|Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H.|Track renewal machgine|
AT3878U3|2000-06-09|2001-02-26|Plasser Bahnbaumasch Franz|MACHINE AND METHOD FOR REMOVING AN OLD TRACK AND LAYING A NEW TRACK|
GB0203223D0|2002-02-12|2002-03-27|Jarvis Fastline Ltd|Train for the deployment of sleepers and/or railway track|
CA2577357C|2004-08-20|2011-10-18|Loram Maintenance Of Way, Inc.|Long rail pick-up and delivery system|
US7478596B2|2005-03-30|2009-01-20|Franz Plasser Bahnbaumaschinen - Industriegesellschaft Gmbh|Method and machine for replacing damaged rail sections of a track|
KR101222219B1|2005-08-11|2013-01-15|프란츠 플라세 바흔바우마쉬넨-인두스트리게젤샤프트 엠. 베. 하|Maschine for renewing a railway track|
US9121140B2|2011-02-09|2015-09-01|Robert B. Conner, Jr.|Low profile material handling system|
FR2999619B1|2012-12-18|2015-07-17|Geismar Ancien Ets L|METHOD OF REMOVING A PRECONDITIONALLY DISCONNECTED RAILWAY IN RAILWAY PANELS AND SYSTEM FOR IMPLEMENTING THE METHOD|
AT516628B1|2015-02-06|2016-07-15|Plasser & Theurer Export Von Bahnbaumaschinen Gmbh|Method of renewing a track|
法律状态:
优先权:
申请号 | 申请日 | 专利标题
AT538975A|AT345878B|1975-07-11|1975-07-11|METHOD AND DEVICE FOR CHANGING A TRACK IN SECTIONS|
[返回顶部]