Method of building band foundation
专利摘要:
A process for forming a continuous footing for building a house comprising digging trenches in accordance with the layout of a house to be built, forming a rubble and gravel bed in the trenches, placing a plurality of leveling pieces on the bed and leveling only the leveling pieces by laying sand thereunder, placing footing blocks on the leveling pieces so as to bridge them, pouring gravel in the trenches, compacting the gravel and rubble so that they are tightly compacted under the footing blocks up to the bottom of the footing blocks, thereafter removing the leveling pieces, and finally placing gravel in the spaces which have been occupied by the leveling pieces and compacting the gravel under the joints of the blocks, is disclosed. 公开号:SU738521A3 申请号:SU782576651 申请日:1978-02-07 公开日:1980-05-30 发明作者:Хигучи Тадаясу 申请人:за витель Иностранец Тада су Хичуги (Япони ); IPC主号:
专利说明:
(54) METHOD FOR CONSTRUCTING THE BELT FOUNDATION one The invention relates to the field of construction, in particular to methods for the construction of strip foundations. There is a method of erection of a strip foundation, including a trench passage, the formation of a substrate layer at the bottom of the trench and installation of foundation blocks I on the layer indicated. The disadvantage of this method is the low productivity of the pipe ® and because of the complexity of the device of the underlying layer with high precision work. The aim of the invention is to increase labor productivity in setting up the foundation. The goal is achieved due to the fact that in the proposed method of construction of strip foundations, including a trench passage, the formation of an underlying layer at the bottom of the trench and installation of the foundation blocks on the specified layer, the underlayings are placed on it in a part of its height. at the locations of the end portions of the base blocks, the leveling elements and align them, install the foundation blocks with the lowering of their end portions 2 elements, and then stack and compact the remaining part of the underlying layer, after which the leveling elements are removed and the cavities formed in the underlying layer, when they are removed, are filled with the material of the underlying layer. FIG. I depicts a foundation block, installed on leveling elements, general view; in fig. 2, section A-A in FIG. one. The method of erection of the strip foundation includes a fragment of trench 1, laying the bottom of the undercutting layer 2 on the bottom of the trench 2 on part of its height, laying it on the end sections of the foundation blocks 3 of the alignment of the four elements 4, aligning these elements, installing the foundation blocks 3 and lowering their end the leveling elements 4, laying and sealing the rest of the underlying layer 2, removing the alignment elements 4 and filling the cavity formed in the flooring layer 2 during their removal, the mother scrap backsheet 2. In this case the underlying sealing layer 2 may be carried out with a vibrating compactor 5 corresponds
权利要求:
Claims (1) [1] Claim A method of erecting a strip foundation, including a fragment of the trench, the formation of a base layer at the bottom of the trench and installation of foundation blocks on the specified layer, about t l. they take the rest of the underlying layer, after which the leveling elements are removed and the cavities formed in the underlying layer when they are removed are filled with the material of the underlying layer. 15 Sources of information taken into account in the examination 1. Denisov O. G. Foundations and foundations of industrial and civil buildings, m., '' Higher School '', 1968, 20 sec 142, 149-151, p. 71.
类似技术:
公开号 | 公开日 | 专利标题 SU738521A3|1980-05-30|Method of building band foundation CN109235493A|2019-01-18|Basement beam slab is backbreak and short formwork construction method in a kind of contrary sequence method CN110106915A|2019-08-09|One kind exempts from that support is inverse to make underground engineering construction method and underground construction structure KR20040096911A|2004-11-17|the revetment block and the process method using block shaped plate which contained natural stones on the surface JPH05230845A|1993-09-07|L-shaped block retaining wall structure and construction method thereof RU2671019C1|2018-10-29|Method of establishing a standard foundation using ribbed slabs of ceilings | JP5843413B1|2016-01-13|Lowering method of existing tunnel JP2813807B2|1998-10-22|How to build an underground tunnel JPH0754354A|1995-02-28|Precast concrete slab for foundation and construction method of foundation using this precast concrete slab CN107905246A|2018-04-13|A kind of ground girder construction process that ground beam mould is printed based on 3D JPH09111776A|1997-04-28|Basement and construction method thereof SU1687724A1|1991-10-30|Method for construction of canal SU1629372A1|1991-02-23|Method for construction of concreate dam RU2647521C1|2018-03-16|Method of manufacture of continuous plate foundations of box section from ribbed plates of overlapping JPS59165737A|1984-09-19|Strip foundation and its construction CN211285674U|2020-08-18|General prefabricated template device of basement cushion cap and grade beam CN106436760B|2018-07-03|A kind of adverse construction method method SU1004537A1|1983-03-15|Method of constructing a structure in soil SU1763558A1|1992-09-23|Channel building method RU2036286C1|1995-05-27|Method for erecting a wall JP2001348886A|2001-12-21|Building foundation construction method in weak ground SU1559041A1|1990-04-23|Method of constructing canal JPH09151470A|1997-06-10|Work execution method for underground structure SU1694779A1|1991-11-30|Method for consolidating subsiding soil RU1837091C|1993-08-30|Method for reinforcement of foundation base
同族专利:
公开号 | 公开日 JPS5398109A|1978-08-28| US4124963A|1978-11-14| CA1074136A|1980-03-25|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题 US2129211A|1936-07-03|1938-09-06|Hickl John|Building block| US2282452A|1938-10-28|1942-05-12|Brown Horatio Whittemore|Method of constructing the foundations of cellarless houses| US2228763A|1939-04-04|1941-01-14|William P Witherow|Sidewalk construction| US2722040A|1951-07-25|1955-11-01|Ludowici Johann Wilhelm|Erection of buildings| US2780935A|1951-12-11|1957-02-12|Roy W Rumble|Method of making a floor slab| JPS5147961B2|1973-02-09|1976-12-17|US4275538A|1980-01-22|1981-06-30|Bounds Edward G|Building foundation method and system, with energy conservation and solar energy utilization features| FR2531470B1|1982-08-06|1985-07-05|Verluise Francois|PROCESS FOR MAKING FOUNDATIONS OF BUILDINGS IN INDUSTRIALIZED ELEMENTS AND MEANS FOR IMPLEMENTING SAME| US5067289A|1990-06-28|1991-11-26|Ouderkirk Dale L|Foundation system for manufactured housing| JP2834980B2|1993-08-04|1998-12-14|良三 米田|Seismic support structure for structures| US6098357A|1994-11-07|2000-08-08|Megawall Corporation|Modular precast construction block system| US5678373A|1994-11-07|1997-10-21|Megawall Corporation|Modular precast wall system with mortar joints| US20030167727A1|2002-03-07|2003-09-11|Ta-Hsiung Peng|Building construction method| US7866097B1|2003-09-27|2011-01-11|Charles S Moyher|Radon venting concrete forms| WO2010067382A1|2008-12-12|2010-06-17|Halldor Geir Thorgeirsson|Prefabricated housing basement structures and construction method thereof| PL2452020T3|2009-07-07|2015-09-30|Alessandro Milani|A procedure for making natural pools| US8302357B1|2010-10-26|2012-11-06|Kontek Industries, Inc.|Blast-resistant foundations| US11008750B2|2014-01-13|2021-05-18|Drff, Llc|Foundation form, drainage and ventilation system|
法律状态:
优先权:
[返回顶部]
申请号 | 申请日 | 专利标题 JP1216877A|JPS5398109A|1977-02-08|1977-02-08|Method of building founcation of prefabricated members| 相关专利
Sulfonates, polymers, resist compositions and patterning process
Washing machine
Washing machine
Device for fixture finishing and tension adjusting of membrane
Structure for Equipping Band in a Plane Cathode Ray Tube
Process for preparation of 7 alpha-carboxyl 9, 11-epoxy steroids and intermediates useful therein an
国家/地区
|