专利摘要:
An apparatus for manufacturing insulating construction profiles having two metal profiles spaced from each other to define a channel filled with an insulating compound includes a supporting table to support a plurality of metal strands successively positioned in advanced movement along the table by transport rollers. Each strand includes a pair of metal profiles spaced from each other and connected with a temporary bridging strip in their advancing path. A first pouring device is positioned in the path of the advancing profiles to fill an insulating material into the channel between two metal profiles in each strand to form a first insulating core and a second pouring device is provided to introduce insulating material into the same channel to form a second insulating core. Between the two pouring devices a strip supply roll, a guide arrangement and a pressure roller are arranged to apply a separating strip between the two insulating cores which is vertically spaced from the temporary bridging strip. A cutting arrangement is provided to remove the temporary bridging strip.
公开号:SU1011038A3
申请号:SU802901405
申请日:1980-04-01
公开日:1983-04-07
发明作者:Бишлипп Клаус;Пфайффер Юрген;Каннерт Пауль
申请人:Эдуард Хюк (Фирма);
IPC主号:
专利说明:

00
oo
3. v4: -raHon (a by nr: 1-7; about tl I,.:, K; and with the fact that it supplies: dream; set 1, an aid for separation from; () one hundred JiHO- o United} .rofile,.,; -: rjf; billets, rameyennlm for 1o:; Cho; i-: im zalilochnym device for .lrchkn and oli, materialiada.
9. Ustgppovka on PP. 1-8, characterized in that the cut-off., VCT: JOHCTHO}; volatile in the form of volatile,
1C. Installation on PP 1-9, on t.:; n-1 aa about the fact that the detachment vcTociHOTBO is made in the saw blade n; iH cutters associated with the drive drive,.
11, stano} eka: io paragraphs 1-10 about tl and ch and y and so that it is supplied ustrodnsnnlm before otree:;; ,; M DEVICE DOPOD NITED B LYM OGDs iibiw, -c: solution for success:; and persg / nikki; / 1zhzhdu metal pro; ) il ;; r - and elements
; /. VcTciHODKa on MP. 1-1, about t l:. a c: d ci c so that the support is poo 11og, r: t; e; About potting voyroystna;.:, u, i, i: iol cIonewID matter, pa: :) 1 iodnan iida - horizontal mustache:; a1; о1Д1кн; оО с: tola with inclined part13, Ustagg; 11, tl and t,. - - g; topics h1s detachable J I I „under the tedley1
. .V | .. month cop with -la. hi; such products .n /; ... п.ггссч and 1OUchnual urgency - and not ... V; .--. : iG m;:; sl-fh; ong; : With s.: Aystza.
; i ,; :: .l: gaining a vine; :WITH. -cc., -; one of the products with ioacTH products:, - c l: n ::, icj: .o; xii ra g;, dividing: L;:, -. n: -;. d rp: j: : i;,:.; i ъ; by followings:; cn: t.jJ. о5ра:; СБанн1Х cavities; 3 L-.n: j,;: o; -; ch: to l- and i er to al om.
The specified,: i, ocTH is indicated by ipc; Scaffoldings; c: -Г ::, з,;,; r; p1: l;) orr:;. bathroom products such as window vi doors of frames consisting of lz prgkp; -rij.-i; :) Oz of metallic zlsg / er-ggov, filled with synthetically: / zolklonlon material, room; .a ..; a; stationary on an ogtore trans: O:) gi :: with ycTpcCi3 3 -.- r., Hfcno.nnei - si B ai;. (e), tsa; oshik; -i i-paaa;. oii - aa. pussy device for; иь: к; -; iso liter of material, with 1aszhe: -ha, about one time ..ipi.iprwM: - /; According to the techno.pogical njiii.eci-a VODODIlIlIlIlLM with a viscous device for pouring insulation, a new material and a device for supplying a dividing bar installed between two consecutive filling devices. In addition, an additional casting device is provided behind the first casting device and in front of the device for feeding the dividing strip. . The device for feeding the separator bar is made in the form of a reel mounted on an axis. A reel with a spacer bar is located above the metal profile, with the reel axis located transverse to the direction of transporting the metal profile. In addition, after each reel b, a dividing bar in the direction of the scientific research institute for moving the bar provides for at least one clamping role. The pressure rollers are mounted on a swinging arm loaded with a spring or a load. At the same time, a guide device for the dividing plate, including guide rollers and a guide plate, is installed behind the reel with a dividing bar in the direction of the movement. The installation is equipped with a cutting device for dividing the composite joined profile into separate blanks placed behind the last filling device for pouring an insulating material. The cutting device is made in the form of a flying saw. In addition, the cutting device is in the form of a saw or cutter associated with a rotating drive. The installation is equipped with an additional cutting device for removing a jumper between the metal profile elements installed by the cutting device. In addition, the support after the last casting device for pouring insulating material is made in the form of a horizontally set table with an inclined section at the exit end. f The cutting device is located under the metal profile. FIG. 1 shows the proposed device, side view j in FIG. 2 is the same horizontal projection; in fig. 3 - finished composite profiled product, transverse cross-section in FIG. 4 shows section A-A in FIG. 2 (in the area in front of the first casting device, if you look in the transportation direction); in fig. 5 is a section BB in FIG. 2 (in the area of the reel with dividing bar J; in Fig. 6, section B-B in Fig. 2 (in the area in front of the guide for the dividing plate J; in Fig. 7, section G-D in Fig. 2 (in in front of the pressure roller for the dividing plate), Fig. 8 is a section L-D of Fig. 2 (in the area in front of the second casting device /; in Fig. 9 is a side view (in front of the cutting device for removing the jumper between the metal shaped elements; fig. 10 is a section E-E in Fig. 9, in Fig. 11 a cutting device, a horizontal projection, in Fig. 12 a device, side view ( additional filling device for filling the hollow space of the insulating; composite profiled product; Fig. 13 is the same, horizontal projection; Fig. 14 — composite composite product, cross section and (in perspective with a filled hollow space ...) ; in Fig. 15, a section of an X-F in Fig. 13 (in the area before it is additionally provided by a casting device, as seen in the direction of transport), the proposed installation serves to manufacture composite shaped articles (( 3), consisting of two metal profile elements placed at a distance from each other, a dividing strip superimposed on the profile elements, and an insulating material filling the cavities. In the example of FIG. 14, which represents a variation of the combined profile of FIG. 3, the intermediate space between the two insulating cores located one above the other is additionally filled with insulating material, which, in addition to an improved insulating effect, leads to an increased rigidity of the combined profile as a whole. Presented in FIG. 3 and 14, the composite profiled articles can be any in profile, for example, as can be seen from the image of the cross-sections in FIG. 4-9, in which the product is presented with shape deviations relative to the product shown in FIG. 1. An apparatus for manufacturing profile products comprises one or several horizontally arranged work tables 1 (Fig. 1 and 2, 12; And 13), which are supported by legs 1 2 on the floor. The work table, which can also consist of any other suitable support, has a work surface 3 for metal profile elements, which during their processing into composite products move along a predetermined trajectory in the direction of the arrow between rollers 4 and 5. Rollers 4 and 5 are installed on vertical axes or shafts 6 and 7 on working table 1. Rollers 5 on one side of the table are fixed on shafts 6 rigidly and are rotated from them, whereas rollers located on the other side are idle and serve only as counter-supports l captured RVBR stvom frictional drive rollers 5 m-metallic profiled elements. The leading gear for the rollers is a motor through which gears: a gear wheel 10 drives the shaft 1 to rotate. The latter bears, on its length of the rollers 5, conical gears 12, which are engaged with the respective bevel gears 13. Bevel gears. gears 13 sit on pins on protruding shaft ends 6 beneath the work table, which transmit movement from the engines to rollers 5. Above the work table is the first filling device 14 (Fig. 2. and 4 I f consisting of a casting head) 15 and the feed nozzle 16. L The pivot head 15 is connected by pipeline 17 with a reservoir 18 for the supply of a casting material and the casting device is mounted movably on the holder 19, which is fixed on the desktop table. The known potting materials are used as the casting material: -Als that come out of the nozzle 16, the filling device 14 and after a short time, the pouring out hardening hardens. The power to the potting material occurs by means of a pump (not shown in the direction of transporting the metal profile elements at a short distance About the filling device 5, the device 14 placed the following filling device 20 (FIGS. 1, 2, and 8), which is made similarly to the filling device / device 13 and includes a casting head 21, a nozzle 22 and the annular 21 is connected by a pipe capacity of 24 dl. stock wire potting mix. The filling device 20 is movably mounted on the holder 25. Between the cages and the filling devices 14 and 20, after the filling device 14, a reel 26 is placed with a margin of the dividing strip 27 ufig. 1, 2, and 5), which, during the movement of the metal, corrugated profile elements at the place provided for this purpose are continuously introduced into the channel between the metal profiles H1 or the elements. The bobbin 2C is mounted above the metal profile elements on the passageway, transverse to the direction of the rail of the axle 28, which with free rotation is placed in the supports 29 and 30, which are supported on the working table 1 by the holder 31. The reel 26 with the margin of the dividing bar 27 contains the dividing bar guide, the hopper using the guide rollers 32 and the convex-curved guide plate 33 (Fig. 6} continuously bends the dividing bar in the transverse direction to facilitate stacking on the ribs between the metal and profile elements. The introduction of the guide plate 32 is particularly useful when the width of the dividing bar is larger than the clearance of the upper entrance channel between the metal profile elements. Behind the reel 26 with a margin of the dividing bar 27 in the direction of transport and the rail by free rotation on the rocker arm 34, a pressure roller 35 (FIGS. 1, 2 and 1), which serves to press the dividing bar 27 against the support edges of the metal profiles to form a interstitial channel bottom, possibly to achieve uniform prile-, Ghani separation strips along the support ribs, which may be necessary in certain cases depending on the material properties of the separating sword. The swing arm 34 on €; the end facing the pinch roller 35 is mounted on an axis 36, both ends of which rest in inserts 37, which are fixed to the working table through the holder 38. In order to exert the necessary pressure on the separator bar 27, the swing arm is loaded with a spring or a load (not shown. In the installation according to Fig. 12 and 13 B of the transport direction after the first casting device 16, however, an additional casting is provided in front of the reel 26 with separator bar the device 39f which is mounted in a corresponding manner similarly to the filling device 14 and also has a injection head 40 and a filling nozzle 41, leads to the container 42 with suitable material pipe 43 and the holder 44. As a casting material for the casting device 39, a known reactive sponge mixture is used, which is delivered in a plastic state from the nozzle 41 and the reaction time of which can be preselected by any control device. The support for the product after the last casting device is made as a horizontal section
table with an inclined section 45 on the output end. The installation also contains a cutting device made in the form of a flying saw 46, which is mounted movably in the direction of transport and against the direction of transport, and also perpendicular to it. The installation is additionally equipped with a cutting device for separating the bridge partition (bottom) between the metal profile elements mounted at the end of the horizontal part of the table in front of the inclined section 45 and includes a saw or a milling cutter 47, which is fixed to the output shaft 48 of the engine 49, which is suspended on the lower side of the table. For counter support for metal
The core elements are served by a roller 50 mounted for rotation in a support 51, adjustable in the vertical direction. Support through the installation elements 52 and 53 mounted on the table (.fig. 9). For the direction of the Metal-shaped elements from above, 54 are mounted on a holder 55, supported by racks 56, mounted on a table. 2) 1
The installation works as follows.
Metal profile elements 57 connected by the bottom dua, which are without success passing individual profile rods one after another through the processing line, as shown in FIG. 1. And 2, 12 and 13, are sent as corresponding whole blocks between rollers 4 and 5, which, in their horizontal distance from each other, can be adjusted to make it possible to match the different metal profile elements 57. Since the rollers 5 are leading , the profile blocks in the direction of the arrow first pass the casting device 14. When the block passes the injection head 15, the casting material continuously flows evenly from above into the open channel between the metal profile elements that are from the bottom closed channel bottom (Fig. 4). The speed of transportation of metal profile elements exactly corresponds to the speed and volume of filling of the casting material so that the casting material reaches the entire length of the metal profile elements of the same level.
When, respectively, the front face end of the individual metal, profile elements 57 reaches the filling head 41 (FIGS. 12 and 13), the filling material flows out, as in the filling device 14,
continuously and evenly into the intermediate space between the metal profile elements (Fig. 15}. The intermediate space is filled, however, to a certain height at a distance under the supporting ribs for the dividing bar 27, so as not to hinder the subsequent laying of the dividing bar 27. Once the front the end end of the continuously moving metal profile elements 57, which are moving during the general working process, reached the reel 26 with a supply of a dividing bar behind the filling device 39, free onets separating strips
5 to 27 is laid by means of a guide (Figs. 5 and 6 on the supporting ribs between the metal profile elements. During further transportation, the metal blocks
0 of the profile elements passes the pressure roller 35 (Fig. 7), which, in this case, when reinforced with an additional weight of its own weight, is attached to the winding machine
5 during transport at the transport speed of the dividing plate. As soon as the front end of the metal profile elements, the lower part of the channel cross section
0, and their intermediate-space (Fig. 15) in their front part | At a length corresponding to the distance traveled before this distance, already filled with casting casting material, will reach the casting device 20, which is filled in the same way as and casting device 14, the upper part of the flow of the river section of the channel to a predetermined height by the potting material (Fig. 8)
0 During the work process, the material filling the intermediate space expands to such an extent that at the end of the reaction time the intermediate
5 space. The reaction time and the steg .. the expansion stump of the insulating material is adjusted so that the subsequent work process is in no way disturbed. If it does not require filling the middle hollow space between the metal profile elements with insulating material, the filling device 39 is turned off.
five
The exit of the casting material on the end sides of the metal profile elements 57 during the manufacturing process is prevented, for example, by shutting off
0 sticky tapes or the like In continuous operation, no special overlap of the end ends of individual metal profiles is required, since the front and rear
The 5 ends of the one in front or following the iPro profile fit tightly, so the T-.o channels following one after the other profiles pass without breaks. It is necessary only that the first and the last profiles of the chain of metal profile elements are covered with adhesive tape. This working operation is performed once at the beginning of the shift, when the transverse; 5 n front side of the first metal profile element to be filled with casting resin, and once at the end of the shift, when the last open end of the last metal profile element overlaps. The channel of all successive profiles passing through without interruption makes it possible for the profile bar to be filled with an insulating mass continuously so that air spaces formed in the insulation material cannot form in the ends of the strip due to material shrinkage. the metal profile elements filled with two passages 11, one above the other with a casting mass, are transported at a constant speed of movement after the passage of the last casting device to the working station l and get into the device for removing the bridge partition, which is installed in front of the inclined section 45 or in front of the flying saw and made in the form of a saw 47, through which the heat-conducting metal bridges are removed, and the saw has $ 47 to be placed on such a pitch as the last filling device 20, so that the insulating material, after pouring, into the last canal filled in; -: its way to the saw would have such, -.-; time to reach its shape stability before entering the saw, t ,, e, as the f ii-iHHMyiv, the change in the position of both metallic profiles was prevented: these elements are relative to each other after removing the bridge helix due to insufficient hardening of the insulation material the required shape stability is achieved much earlier than the final hardening of the rubber material. Z. then metal profile elements 57 reach the inclined section 45 at the exit end of table 1. Thanks to STONry, it turns out that the front element 57 is due to its own weight in c: due to lack of support in this place, it is bent down and B is the weakest point which is located at the point of joining the front side of the front profile and the front front side directly behind it of the adjacent profile, breaks off and separates from the next profile bar. Since a separate connection between the two core rods is formed by means of two solidified partial insulating cores and a through dividing bar 27, the place of bend or break is located in the partial insulating core and the dividing bar. It is also possible, instead of the inclined section 45, jointly hanging profile rods at their joining points to be separated by means of a flying saw 45, which is mounted movably both in the direction and against the direction of transport, and also perpendicular to it, in order to provide a piece without interruption of transportation (Fig. 1 and 12). It can also be separated from the hand or mechanically using scissors, a knife, etc. In this way, the manufacture of combined profiles from the entrance of the installation before the first casting device to the end of it after the cutting device, made in the form of a flying saw 46 or section 45, can occur continuously without interrupting the manufacturing process. It is also possible to separate the overlapping partition or the duct between the metal profile elements only after the separation device 45 or 46 (Fig. 1) instead of before (Fig. 10 However, this would worsen the unhindered production process. If combi profiles, the insulation core of which is to be separated by no more than two partial insulating cores, as described in the selected example, it is only necessary to add a filling device 20 for each additional insulating material a partial core, an additional, minimum consisting of a reel of a dividing bar and the next potting device, a unit that can be combined, respectively, is fitted with an additional potting device 39 and, if necessary, can be supplemented by a pressure roller and / or a guide bar also, it is a miniaturized-ionic, i.e., at the same time, to produce several metal profiles that are interconnected by an insulating bar, Individual workstations should be expanded accordingly by directly parallelly placing several injection heads, separating bar feed devices, etc. in parallel.
The grip of the dividing bar 27 takes place depending on the movement of transportation of the metal profile elements 57. For this, it is only necessary to glue the free end of the dividing bar, for example, by means of adhesive tape to the front end of the first profile from the continuity of the network, i.e. once to the beginning of the work shift or after inserting a new reel with a dividing strip. Due to the hardening of the material in the preceding profile bar (Fig. 1 and 2, 12 and 13), it is sufficient for the bonding force to be wound onto the dividing bar by winding the reel 26 with the dividing bar 27 without the additional drive in the unwinding direction. . Instead of adhesive tape, of course, other suitable fastening means can be chosen, for example, grippers not shown in the drawings, which engage with the front link of the first profile of the entire sequence of profiles.
Otherwise, it is possible to start or end the casting process of the casting devices 14, 20 and 39 by means of a light gate or other similar suitable means to turn on automatically. The insulation material may be extruded into the channels,
The present invention is described on the basis of a whole metal source profile 57 connected by a partition, it is likewise possible to use separate metal source profiles from each other and instead of a connecting partition to apply the channel floor overlaps separated from them. In this case, a partitioning device with a saw 47 could be used.
PI
W 2d
P
thirty
. $
".U /, ff
fug.
4S
13
-G
//
g
-24
4 d 9
01/1 fff
g -
fae /
权利要求:
Claims (1)
[1]
1. INSTALLATION FOR MANUFACTURE. COMPONENT PROFILED PRODUCTS such as window and door frames, consisting of profiled metal elements filled with synthetic insulating material, containing transport devices mounted on a support made in the form of feed and guide rollers, and a filling device for pouring insulating material, characterized in that, for the purpose of increase the strength and insulating properties of products by imposing a dividing strip on profiled elements and filling the formed cavities with insulation material, it is equipped with at least one additional filling device placed during the technological process for pouring insulating material and a device for feeding the separation strip installed between two successive filling devices.
SU. „L 011038
FIG. f o, Ustsnika on! oo 1-7 = o lich a ya u with that. that it is equipped with an etrez device for dividing the guest from the connected 1. profile into the billet compartment, placed behind π: ί :: about the days when the water device for filling the insulating material was filled.
9, Installation according to paragraphs. 1 “8, on the condition of the fact that the cutting .. device is made in the form of a“ flying hull,
10, Installation according to paragraphs 1-9, distinguished by the fact that the cutting device is made in the form of a saw or milling cutter connected with a rotation drive
11, Installation no. 1-10, characterized in that it is provided with an additional reflective device installed in front of the cutting device for removing feathers between metal profiled elements.
12, Uktganov to a 1-7, according to the fact that the support after the last casting device for insulating material licking is made in the form of a horizontally flattened table with an inclined portion / ok at the G'ykhoz end,
13, Installation 11, due to the fact that the cutting device is located under the metal of the coofite, fed by a servant. Hs; such products are angry gray-haired, which is the gray gray chaot dot · and ne'l dododo isdotdoododo sooystza, ns ..; :, inventions - improving the performance of the product properties of products
ST'DO Γ-Ϊ GT Pr a full ns pi and ozeldodo g; nym
At the hour; ap share
With HS pa from n about with about; to the dividing plate. Ede nents of the formed cavities with the material, • to be cut by
类似技术:
公开号 | 公开日 | 专利标题
US4581186A|1986-04-08|Method of making foam core building panels in a continuous operation
SU1011038A3|1983-04-07|Machine for making composite profiled products
FI77813C|1989-05-10|Method and apparatus for making reclosable bags.
US4602466A|1986-07-29|Foam building panels
JP6993700B2|2022-01-13|Packaging method and packaging machine with stretchable film for continuously supplied products
US4606715A|1986-08-19|Apparatus for making building panels in a continuous operation
DE2451149A1|1975-05-07|METHOD OF PACKAGING A LONGITUDINAL STRIP, DEVICE FOR CARRYING OUT THE PROCESS AND PACKAGING MADE FROM THE STRIP
US5168690A|1992-12-08|Cigarette-packing machine, specifically for packing cigarettes into hard boxes with an integral hinged lid
MXPA03008000A|2004-10-15|Continuous method of making four-tapered edge gypsum board and the gypsum board made therefrom.
US20150298331A1|2015-10-22|Method and apparatus for supporting product during cutting
EP3444212B1|2021-05-19|Provision of web-shaped sheet material to a cutting area
US3833695A|1974-09-03|Method and apparatus for producing elements by moulding
US3345795A|1967-10-10|Method and apparatus for packaging bars of plastic material
SE447220B|1986-11-03|PROCEDURE AND DEVICE FOR MANUFACTURING A COMPOSITION PROFILE FOR WINDOW FRAMES AND SIMILAR
EP0427126B1|1994-03-16|Device for changing a band
CA1055295A|1979-05-29|High speed partition assembling method and apparatus
JP2007527321A|2007-09-27|Management method of continuous in-line processing equipment for metal strip and equipment for carrying out this method
US2486091A|1949-10-25|Continuously forming fibrous material
DE2628086A1|1977-01-20|METHOD AND DEVICE FOR EVEN AND SMOOTH SPRAYING OF SURFACES IN A MANUFACTURING SYSTEM WITH PERIODIC DRIVE
JPH09225529A|1997-09-02|Method and device for operation of strip plate coiling machine
US6915572B1|2005-07-12|Method and plant for continuously producing construction
DE2941354A1|1981-04-23|Mfg. composite profiles of metal rails with cast foam insulation - for construction of frames for windows, doors etc.
RU2721801C2|2020-05-22|Paper rolls installation and production method
DE2913254C2|1981-03-26|Device for the production of insulating composite profiles, in particular for window and door frames, facades or the like.
SK29597A3|1997-09-10|Apparatus for producing rolls of dough sheets with separator sheets
同族专利:
公开号 | 公开日
NL8001925A|1980-10-07|
AT378569B|1985-08-26|
DD150023A5|1981-08-12|
SE8002451L|1980-10-04|
DK154753B|1988-12-19|
ATA180580A|1985-01-15|
CA1143140A|1983-03-22|
DK137880A|1980-10-04|
FR2453009A1|1980-10-31|
NL186747C|1991-02-18|
NO152760C|1985-11-13|
NO800703L|1980-10-06|
IT1131078B|1986-06-18|
IT8020943D0|1980-03-27|
SE432380B|1984-04-02|
DK154753C|1989-05-16|
GB2047781A|1980-12-03|
NO152760B|1985-08-05|
AU537279B2|1984-06-14|
US4381907A|1983-05-03|
CH645838A5|1984-10-31|
GB2047781B|1983-02-02|
CS221540B2|1983-04-29|
BR8002089A|1980-11-25|
FR2453009B1|1984-01-13|
AU5688880A|1980-10-09|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题

US3624885A|1969-11-17|1971-12-07|Reynolds Metals Co|Apparatus for making a thermally insulating joint construction and an adjustable guide assembly for use therewith|
US4128934A|1970-07-06|1978-12-12|Firma Julius & August Erbsloh|Method of making a thermally insulated window frame|
US3832818A|1971-06-01|1974-09-03|H Nahr|Composite body consisting of at least two component parts such as profiles|
US3786121A|1971-08-20|1974-01-15|A Schaerer|Method for the fabrication of insulated profile members|
SE437395B|1977-05-12|1985-02-25|Hueck Fa E|COMPOSITION PROFILE FOR WINDOWS AND DORRAMS AND PROCEDURE FOR PRODUCING ITS|AT377587B|1981-08-26|1985-04-10|Hansa Metallwerke Ag|CONTROL DISC VALVE, IN PARTICULAR SANITARY VALVE|
JPH0234299B2|1982-12-25|1990-08-02|Yoshida Kogyo Kk|
US4556374A|1984-10-01|1985-12-03|Letarte Walter G|Purging device for a filler carrier|
BE1004237A4|1989-02-15|1992-10-20|Mertens Joris|Method for manufacturing a profile provided with a thermal barrier andinstallation for the implementation of said method|
DE4209345A1|1991-06-01|1992-12-03|Bayer Ag|METHOD AND DEVICE FOR PRODUCING COMPOSITE PROFILES FROM AT LEAST TWO SINGLE PROFILES|
JP3400298B2|1997-06-11|2003-04-28|ワイケイケイ株式会社|Resin composite aluminum profile, heat-insulating aluminum profile, method for producing them, and apparatus used therefor|
US11035167B1|2020-03-03|2021-06-15|Quaker Window Products Co.|Thermally enhanced extrudate for windows and doors|
法律状态:
优先权:
申请号 | 申请日 | 专利标题
DE2913254A|DE2913254C2|1979-04-03|1979-04-03|Device for the production of insulating composite profiles, in particular for window and door frames, facades or the like.|
DE2941354A|DE2941354C2|1979-10-12|1979-10-12|Device for the production of insulating composite profiles, in particular for window and door frames, facades or the like.|
[返回顶部]