![]() INSTALLATION PROCEDURE OF A TORRE MAR INTO WIND GENERATOR (Machine-translation by Google Translate,
专利摘要:
Installation procedure of an offshore tower wind turbine. The invention relates to a method of installing a wind turbine (1) of a marine tower (or, generally, water), wherein said tower advantageously comprises a foundation (2) open at the top and equipped with a lower slab (3) substantially flat and a perimeter wall (4). The procedure comprises, in different stages thereof, the introduction or reduction of ballast material (7) in the main space (6) of the foundation (2) and where, in the absence of said ballast material (7), the wind turbine (1) or the foundation (2) is floating or self-floating. The process of the invention is especially suitable for the installation of wind turbines (1) in areas of low draft (or "near-shore"), preferably less than 15 m. (Machine-translation by Google Translate, not legally binding) 公开号:ES2785802A1 申请号:ES201930315 申请日:2019-04-05 公开日:2020-10-07 发明作者:Garcia-Conde José Salustiano Serna;Acon Carlos Garcia 申请人:Esteyco SAP; IPC主号:
专利说明:
[0002] INSTALLATION PROCEDURE FOR A TORRE MAR INTO WIND GENERATOR [0004] FIELD OF THE INVENTION [0006] The present invention relates to a method of installing a tower marine wind turbine, where said tower preferably comprises a foundation with a substantially flat lower slab. The technical field of application of the invention refers, therefore, to the field of renewable energies and, more specifically, the techniques of installation of offshore generation structures (or, in general, offshore in any other aquatic environment) , also referred to as "offshore". The invention is especially suitable in wind farms close to the coast or with low draft, commonly known as "near-shore". [0008] BACKGROUND OF THE INVENTION [0010] At present, the procedures for the installation of marine tower wind turbines in marine environments of moderate or high depths (understood as those greater than 15 meters) are known, such as that described in patent application WO0134977A. In said procedure, a metallic or concrete foundation whose interior is watertight, and a wind turbine tower on said foundation are arranged. The buoyancy of the wind turbine assembly is adjustable, by means of pumps that allow introducing or removing a volume of water in the interior space of said foundation and / or of the tower. This allows, in different phases of the process, that the foundation can be provisionally anchored (increasing its volume of ballast) to install the turbine on the tower and that, later, said ballast is evacuated with the pumps, putting the whole afloat again . In this condition, a transport ship can be coupled integrally to the tower, and move to the final installation point on the high seas. For this installation, water is pumped back into the foundation, causing the whole to sink until it reaches the seabed. [0012] Although this type of procedure allows to efficiently regulate the buoyancy of the tower assembly during the different stages of assembly of the turbine and Installation at depths greater than 15 meters, have severe limitations when applied to near-shore operations, as a consequence of the complexity of their foundations and ballast systems. This is due to the fact that the construction of a watertight foundation (necessary for high depths) requires large amounts of material, to ensure that said foundation is watertight, which generally requires the installation of an upper slab that covers the ballast intake spaces. The corresponding greater weight implies drafts that make it impossible to transfer and install the foundation in shallow areas, thereby limiting the applicability of the solutions in near-shore cases. Also, the use of pumps and intake systems, valves, etc. In this type of technology, it complicates the installation processes, both at an operational level and due to the greater risk of breakdown that they entail during the ballasting and deballasting stages of the foundation or tower. This makes this type of installation technology unsuitable for offshore or near-shore wind farms with a high number of towers. [0014] Likewise, in relation to the ballast techniques for offshore tower foundations, foundations based on open compartments (also known as cells) are also known, such as those of the foundations described in patent ES2593263B1. Said foundation is a concrete self-transporting gravity structure that can be anchored without the need for auxiliary elements (such as boats, floats, etc.). However, its complexity is high and requires a horizontal ring-shaped slab, which adds excessive construction steps in its manufacturing process. Again, this added complexity and weight make this type of foundations not suitable for offshore wind farms with a large number of towers, or for installation regions near the coast (near-shore). Furthermore, its ballasting process is not reversible, or not at least without the use of complex techniques. [0016] Finally, in relation to the specific techniques for transporting the aforementioned foundations, transport systems based on ships equipped with lifting / anchoring jacks are known, such as the transport ship described in patent ES2607428B1. Said vessel consists of a floating structure in the shape of a "U", and a plurality of lifting jacks (or "jacks") arranged as means of raising or lowering the foundation or the tower. [0017] However, the specific use of these transport vessels in operations near the port or the coast, for their application to nearshore wind farms, has not been reported to date in the state of the art. [0019] In light of the above limitations and technical problems, it is therefore necessary to provide new installation procedures for near-shore marine tower wind turbines (that is, preferably at depths of less than 15 meters) and that allow the more efficient the stages of assembling the wind turbine on the tower, as well as those relating to the transport of the set formed by the tower and the wind turbine to its final anchoring point offshore. [0021] The present invention makes it possible to solve this need, thanks to a novel installation procedure for a marine tower wind turbine, and to a wind turbine obtained by said procedure. [0023] BRIEF DESCRIPTION OF THE INVENTION [0025] In order to solve the drawbacks of the state of the art described above, the present invention aims to provide a wind turbine installation procedure that is especially suitable for low draft or near-shore areas. [0027] Said object of the invention is preferably carried out by means of an offshore wind turbine installation procedure, of the type comprising a wind turbine and a tower shaft, where the wind turbine is also equipped with a foundation comprising a lower slab and a perimeter wall arranged on said lower slab, such that said foundation acts as a support base for the wind turbine on the seabed, and where the interior enclosure delimited by the lower slab and the perimeter wall forms a main space open at the top, said foundation adapted for the admission of ballast material and where, in the absence of said ballast material, the wind turbine or its foundation is floating or self-floating. [0029] Advantageously, the method comprises carrying out the following steps: [0030] a) the foundation is built dry; [0031] b) said foundation is floated; [0032] c) said foundation is transported in a floating or self-floating way, to the vicinity of a work dock; [0033] d1) ballast material is introduced into the main space of the foundation; [0034] d2) before or after step d1), the depth of the foundation is increased until it rests on a support ground on the seabed, in a mounting position near said work dock where, at the moment in that the foundation rests on said terrain, the upper level of the perimeter wall remains above the water level, without the water overflowing from the outside of the foundation into its main space; [0035] e) at least part of the tower shaft and the wind turbine are mounted on the foundation, using for this purpose a crane arranged on the work dock; [0036] f) while the foundation remains supported in the mounting position on the support ground, the foundation is coupled to an auxiliary floating system, in such a way that said foundation and said auxiliary floating system become substantially integral in at least altered, balanced and pitching, the assembly of said foundation and said auxiliary floating system forming a transport unit, where the auxiliary floating system comprises: [0037] - vertical connection means, adapted to vertically connect the foundation and the auxiliary floating system and that allow transmitting vertical forces between them; [0038] - ascent / descent means adapted to vary, in a controlled manner, the elevation or vertical position of the foundation; [0039] g) an upward vertical force is applied through the ascent / descent means on said foundation and a downward vertical force on said auxiliary floating system, in such a way that at least part of the weight of the foundation and / or the wind turbine it is suspended from said auxiliary floating system; [0040] h) the ballast material of the main space of the foundation is reduced; [0041] i) the transport unit is put afloat; [0042] j) the transport unit is transported in a floating or self-floating way, until it is located on a definitive installation point on the seabed; [0043] k) the foundation is supported on the seabed, on the final installation point, following the following steps in any order or simultaneously: [0044] k1) ballast material is introduced into the main space of the foundation; k2) the ascent / descent means are acted upon to reduce the height or height of the foundation in a controlled manner, until it is supported on the seabed at the point of installation, maintaining at all times a positive freeboard of the auxiliary floating system; [0045] l) the auxiliary floating system is uncoupled from the foundation, following one or more of the following steps: [0046] 11) the ascent / descent means are acted upon to reduce and / or cancel the vertical forces supported by the vertical connection means; [0047] 12) the vertical connection means of the foundation are disconnected; m) the auxiliary floating system is transported for its recovery and / or reuse. [0049] In a preferred embodiment of the invention, the foundation of the wind turbine comprises one or more of the following elements: [0050] - a lower pedestal to support the tower shaft; [0051] - a plurality of struts or struts to support the tower shaft, or connected to a pedestal of the foundation itself; [0052] - one or more partition walls arranged inside the main space of the foundation. [0054] In another preferred embodiment of the invention: [0055] - the lower slab and / or the perimeter wall are watertight, or [0056] - the lower slab and / or the perimeter wall comprise auxiliary ballast material intake points, optionally equipped with filling valves. [0058] In another preferred embodiment of the invention, during step k2), the water level exceeds the upper level of the perimeter wall with at least half the volume of the main space of the foundation occupied by ballast material introduced during step k1 ). [0060] In another preferred embodiment of the invention, in step k1), the entry of ballast material is allowed into the main space of the foundation, through one or more auxiliary points of admission of said ballast material, arranged in the lower slab and / or in the perimeter wall, until the ballast material occupies at least half the volume of the main space of the foundation. [0062] In another preferred embodiment of the invention, during step k2), the auxiliary floating system supports the weight of the foundation with positive freeboard, the main space of the foundation being completely filled with ballast material. [0063] In another preferred embodiment of the invention, in the transport unit, the auxiliary floating system has a freeboard higher than the freeboard of the perimeter wall of the foundation. [0065] In another preferred embodiment of the invention, the process comprises, after step i), one or more of the following steps: [0066] n) at least part of the main space of the foundation is filled with solid ballast material, disposed through the upper opening of said foundation; [0067] o) any element of the wind turbine is protected with one or more anti-scour means. [0069] In another preferred embodiment of the invention, the method comprises: [0070] - before step c), the step: [0071] p) the foundation is assembled in a dry dock area, where said dry dock area has a water intake gate configured to regulate the degree of flooding of the dry dock and, during stage b), said gate is opened to flood the dry dock area keeping the upper level of the perimeter wall of the foundation above the water level, so that the water does not overflow from the outside of the foundation into its main space; me [0072] - after step e) and before step j), step: [0073] q) One or more start-up and / or operation control operations of the wind turbine are carried out. [0075] In another preferred embodiment of the invention, in step d) and / or step k1) of the process, the main space of the foundation is filled with ballast material with water and / or by gravity. [0077] In another preferred embodiment of the invention, the foundation comprises one or more lateral projections and a prestressing system adapted to apply a pretensioning force to press the auxiliary floating system against said lateral projections of the foundation. The lateral projections are preferably an extension of the lower slab beyond the outer face of the perimeter wall of the foundation. The advantage of this configuration is that, by pressing the foundation against the auxiliary floating system, the relative lateral movements between them are limited. To promote said horizontal coupling, the contact surfaces between said The projections and the auxiliary floating system may comprise means to enhance friction, or gear-like elements or projections on one surface that engage the other. Additionally, by pretensioning, the variations in force received by the cables of the lifting / lowering means during transport in particular are reduced, and thus their fatigue (that of the cables and the lifting means themselves) is reduced. [0079] In another preferred embodiment of the invention, the ascent / descent means comprise: [0080] - at least three lifting jacks or cranes arranged in the auxiliary floating system, comprising suspension cables whose lower end are connected to the foundation (2); [0081] and where, in step k2), the foundation is lowered by regulating the length of said suspension cables, in such a way that the relative elevation between the foundation and the auxiliary floating system varies as the foundation progressively descends until it reaches the bottom; [0082] - adjustable floating means, adapted to modify the degree of subsidence of the foundation and / or the transport unit. [0084] In another preferred embodiment of the invention, the ascent / descent means comprise: [0085] - a fixed connection between the auxiliary floating system and the foundation, which does not allow the relative height between both elements to vary. Said connection can be made, preferably, by means of horizontal pins that come out of the auxiliary floating system and penetrate into a hole in the perimeter wall, so that said floating system and the foundation are coupled and uncoupled by removing or inserting those pins; [0086] - A ballast system in the floating system, which allows you to regulate the ballast on your hull; [0087] and where in step k2) the foundation is lowered by regulating the ballast in the auxiliary floating system to increase the draft of the set in such a way that the auxiliary floating system and the foundation descend together without changing their relative elevation until the foundation rests on the background, [0088] and where the auxiliary floating system has a sufficient height to be able to submerge together with the foundation, maintaining a positive freeboard at all times. In high-depth locations, the latter can be reached, optionally, by means of columns that protrude from the deck of the auxiliary floating system, such that the deck of the same can become submerged, but the columns keep sticking out. The area of the columns in that case must be sufficient to provide sufficient stability to the assembly when the deck of the floating system has been submerged. [0090] In another preferred embodiment of the invention, during step k2) of the process, the auxiliary floating system remains substantially in the same position with respect to the water level. [0092] In another preferred embodiment of the invention, the auxiliary floating system has a ring structure, which completely surrounds the foundation, and which is hinged to be able to open and close to couple it and uncouple it from the foundation. By completely encircling the foundation, you can increase the effective freeboard of the foundation, thereby avoiding the risk of water ingress particularly during transportation. [0094] In another preferred embodiment of the invention, the auxiliary floating system has a buoyancy area and a freeboard such that, during step k2), the auxiliary floating system can support the weight of the wind turbine and the foundation partially submerged and with the main enclosure totally full of ballast, maintaining a positive freeboard. [0096] In another preferred embodiment of the invention, the final installation point on the seabed has a depth of less than 15 m. [0098] In a second aspect, the present invention relates to a wind turbine installed by means of a method according to any of the embodiments described herein. [0100] The above embodiments are not to be understood as limiting the scope of protection of the invention, said scope encompassing any technically possible combination thereof, provided that they are not mutually exclusive. Likewise, although this document will generally refer to the installation of wind turbines in the marine environment, the invention is to be understood equally applicable or referred to any other aquatic environment. [0102] The expression "substantially", applied to any of the terms used in this document, will be understood as identical or included in a variation range of 10% higher or lower. [0103] DESCRIPTION OF THE DRAWINGS [0105] The foregoing and other characteristics and advantages will be more fully understood from the detailed description of the invention, as well as from the preferred embodiment examples referred to the attached drawings, in which: [0107] Figure 1 shows a general profile view of a marine wind turbine, suitable for installation using the method of the invention. [0109] Figures 2a-2b show, respectively, a profile and plan view of the foundation of the wind turbine of the invention, in a preferred embodiment thereof. [0111] Figure 3 shows a stage of manufacture of the foundation of the dry dock wind turbine, with the help of a crane adapted for this purpose. [0113] Figure 4a shows a manufacturing step of a plurality of wind turbine foundations according to the present invention, arranged in a dry dock area in different degrees of execution of their assembly. Figure 4b shows a later stage of flooding of the dry dock. [0115] Figure 5 shows a stage of installation of the wind turbine of the wind turbine on the tower shaft and the foundation, according to a preferred embodiment of the invention. [0117] Figure 6 shows a perspective view of the transport unit formed by the foundation of the wind turbine and the auxiliary floating system. [0119] Figures 7a-7c show two possible embodiments of a boat type auxiliary floating system with a "U" shape (7a) or a ring shape (7b-7c). [0121] Figures 8a-8d show different stages of anchoring the wind turbine at its final installation point, relying on the auxiliary floating system during said anchoring. [0123] Figures 9a-9b show a stage of filling the main space of the foundation with a ballast material of the granular type, also covered with a layer of rocks. [0124] List of numerical references of the figures: [0129] DETAILED DESCRIPTION OF THE INVENTION [0131] A detailed description of the invention is set forth below, referring to different preferred embodiments thereof, based on Figures 1-9 herein. Said description is provided for illustrative purposes, but not limiting of the claimed invention. [0132] Figure 1 shows a general profile view of a marine wind turbine (1) suitable for installation by the method of the invention. Said wind turbine (1) preferably comprises a wind turbine (1 ') at its upper end and a tower shaft (1' ') in its central region. Likewise, at its lower end, the wind turbine (1) has a foundation (2) comprising, in turn, a lower slab (3), preferably watertight and with a substantially horizontal shape, and a perimeter wall (4), also preferably watertight. and arranged on the lower slab (3), such that said foundation (2) acts as a support base for the wind turbine (1) on the seabed (5) (or, in general, aquatic). Likewise, and as shown in Figures 2a-2b (which represent, respectively, profile and plan views of the foundation (2)), the interior enclosure delimited by the lower slab (3) and the perimeter wall (4) it forms a main space (6) for the admission of ballast (7), configured to house a volume of material (be it water, sand, gravel, etc.) that modifies the buoyancy of the assembly to facilitate the anchoring operations of the wind turbine (1 ) until reaching the seabed (5). However, in the absence of ballast (7) in the main space (6) of the foundation (2), said wind turbine is preferably self-floating. [0134] Unlike other foundations of the state of the art, and as can be seen in Figures 2a-2b, the main space (6) of the foundation of the invention is a partially or totally open space in its upper region, adapted to admit or remove ballast (7) in different stages of the installation and / or transport procedure of the wind turbine (1). Likewise, in other embodiments of the invention, it is also possible to have one or more auxiliary ballast entry or exit points (8, 8 ') in other regions of the foundation. Said entry / exit points (8, 8 ') will be used, preferably, as water accesses to the main space (6) of the foundation (1), intended for anchoring it. More preferably, said accesses will be regulated by valves or similar passage control means. [0136] In addition to the above elements, the foundation (2) of the wind turbine (1) of the invention preferably comprises a plurality of struts (9) or struts that support the tower shaft (1 '') or connected to a pedestal (2 ') bottom of the foundation itself (2), intended to reinforce the structure of the whole. Additionally, in different embodiments of the invention (see Figure 2b), the main space (6) of the foundation (2) may have one or more separation partitions (10), intended to reinforce its structural integrity, preferably radial. [0137] As mentioned in the section on the background of the invention, the wind turbine (1) described here is especially intended for installation in shallow water or marine environments, preferably at bottom depths (5) of less than 15 meters. For this, it is essential that the set formed by the turbine (1 '), shaft (1' ') and foundation (2) is light compared to other offshore wind turbines intended for installation at greater depths (greater than 15 meters). In this sense, and as will be detailed below, the use of a foundation (2) that is open at the top is essential, so that the total mass is reduced and the draft of the floating assembly is always kept at acceptable limits above the sea / aquatic bottom (5) in the assembly, transport or installation stages in which the wind turbine (1) is afloat. [0139] Initially, the wind turbine installation has a foundation manufacturing phase (2), which is preferably carried out dry, with its lower slab (3) resting on the ground (11). Said foundation will be, more preferably, a foundation totally or partially made of concrete, by means of the techniques usually used in the manufacturing processes of structures with this material. Figures 3 and 4 of this document show different stages of this phase, where it can be seen how the foundation (2) is assembled in a dry dock area (12), with the help of a crane (13) adapted to the effect. (Figure 3). As mentioned, the specific method of assembling the elements of the foundation (2) is not an essential part of the invention, so any techniques known in the state of the art can be used for this. Likewise, Figure 4a shows a plurality of foundations (2) according to the present invention, arranged in a dry dock area in different degrees of execution of their assembly. Preferably, the dry dock area (12) has a gate (14) or similar means for admitting water, designed to regulate the degree of flooding of the dry dock (12). Once the foundation (2) is finished, the gate (14) opens, allowing the water to progressively flood the dam (12), until the thrust produced by the incoming water volume sets the foundation (by itself). 2) afloat (Figure 4b). Essentially, during the operation of launching the foundation (2), the upper level of its perimeter wall (4) remains above the water level (15), thus ensuring that the water does not overflow from the outside of the foundation (2) towards the interior of its main space (6). [0140] Once the foundation (2) is completely assembled and afloat (after the controlled flooding of the working dry dock (12), as described in the previous lines), it can be transported or towed by water, floating. or self-floating (that is, either because it floats assisted by some auxiliary floating element, or because the wind turbine itself (1) is capable of floating by itself), to a second area in the vicinity of a work dock (16) ( Figure 5). At that point, and in order to assemble the remaining elements of the wind turbine (1) (that is, the shaft (1 '') and the turbine (1 ')) on the foundation (2), it is necessary to support said foundation (2) on the bottom (5). To do this, ballast material (7) (preferably water) will be introduced into the main space (6) of the foundation (2), for example by filling said space (6) with hydraulic pumps or similar means, or by the opening of the auxiliary filling points (8, 8 '), if used. During this stage, the main space (6) of the foundation (2) will be flooded progressively and in a controlled manner, until it rests on the bottom (5), maintaining the stability and horizontality of the whole. Alternatively, tidal variations can be used to anchor the foundation (2). Likewise, and essentially in the approach of the present invention, during this anchoring phase in the second area near the work dock (16), the upper level of the perimeter wall (4) remains above the water level again. (15), thus ensuring that, upon completion of the anchoring in which the foundation (2) rests on the bottom (5), the water does not overflow from the outside of the foundation (2) towards the interior of its main space ( 6). However, in moments after said anchoring, it is possible that the water overflows the perimeter wall (4) and enters the main space (6) (for example, due to tidal variations, or for any other reason). It is important to clarify that said filling of water after the anchoring of the foundation (2) does not pose any risk to its stability, since at that moment it is already resting on the bottom (5). [0142] After the end of the anchoring of the foundation (2) in the second area near the work dock (16), the remaining elements of the wind turbine (1) will be installed, as shown in Figure 5. This will include , therefore, the assembly of the tower shaft (1 '') on the foundation (2) (preferably, on its pedestal (2 ')) and, later, the installation of the wind turbine (including its blades) as a final step of this phase. Preferably, the installation of these elements is carried out with the help of a crane (13) and similar auxiliary equipment. The specific procedure for mounting the shaft (1 '') and the turbine (1 ') is not, in itself itself, an essential part of the present invention, being able to use for this any procedures or tools known in the state of the art. [0144] After the complete assembly of the wind turbine (1) as described in the previous paragraph, and while the foundation (2) is still supported in the aforementioned mounting position on the bottom (5), it will proceed to couple to the foundation (2) an auxiliary floating system (17), in such a way that said foundation (2) and said auxiliary floating system (17) have a joint movement in at least altered, rolling and pitching (in English, "heave", "roll" and " pitch ”), the assembly of the foundation (2) and the auxiliary floating system (17) forming a transport unit (18) (Figure 6 of this document shows a perspective view of said transport unit (18)). Likewise, the auxiliary floating system (17) preferably comprises one or more vertical connection means (19) that can vertically connect said foundation (2) and said auxiliary floating system (17) and that allow the transmission of vertical forces between them. Preferably, the connection means (19) vertical include a plurality of cables that run from the floating system (17) to the foundation (2), when it is supported on the bottom (5). Likewise, any other known vertical connection means can also be used within the scope of the invention. More preferably, the vertical connection means (19) are connected at evenly distributed points on the foundation (2). In addition to the vertical connection means (19), the floating system (17) also comprises one or more ascent or descent means (20), which allow the elevation or vertical position of the foundation (2) to be varied in a controlled manner. Preferably, said ascent / descent means (20) comprise cranes, hydraulic jacks, or similar devices selected from those known in the state of the art. Other tools such as auxiliary flotation elements (floats or systems related) attachable to the foundation (2) can also be considered as ascent / descent means (20) within the scope of the invention. Figures 7a and 7b-7c show two possible embodiments of an auxiliary floating system (17) of the boat shaped like a "U" (Figure 7a) or in the shape of a ring (Figures 7b-7c). However, other types of systems or boats, self-propelled or not, as well as other types of specific forms thereof, are also possible as auxiliary floating systems (17) within the scope of the invention, their specific embodiment not being, therefore, an essential element of it. [0145] The joint configuration phase of the auxiliary floating system (17) and of the foundation (2) that leads to the transport unit (18) is preferably carried out as follows: first, the means (19 ) of vertical connection to the foundation (2), this being supported on the bottom (5). Second, an upward vertical force is applied to the foundation (2) by the ascent / descent means (20) of the auxiliary floating system (17), maintaining the stability of said foundation (2) by controlling the position thereof, through the vertical connection means (19). Said force is applied until the upper level of the perimeter wall (4) of the foundation (2) is again above the water level (15), subsequently remaining until the definitive anchoring of the wind turbine (1) in its place of operation. [0147] Likewise, and once the upper level of the perimeter wall (4) of the foundation (2) is above the water level (15), the ballast (7) inside the main space of the foundation (2) is reduced , for example by means of hydraulic pumps, thus contributing with this emptying to the buoyancy of the assembly that forms the transport unit (18) (preferably, the reduction of ballast (7) will be carried out until the foundation (2) is completely emptied, although without limitation to other types of scenarios in which a partial emptying is carried out). At this point, the relative position of the foundation (2) and of the auxiliary floating system (17) is fixed through the vertical connection means (19), jointly in at least altered, rocking and pitching, maintaining the unit transport (18) afloat. [0149] After completing the joint configuration of the transport unit (18) as described in the previous paragraph, said unit (18) will be towed or transported by water, floating or self-floating, until it is located on its final installation point (21) on the seabed (5) / aquatic (this situation is illustrated in Figure 8a of this document). Transportation can be carried out both by self-propelled means (for example, said means being included in the auxiliary floating system (17)), as well as by tugboats. Once the final installation point (21) has been reached, the foundation (2) and the auxiliary floating system (17) will be uncoupled again in a joint manner in the transport unit (18) and the final anchoring of the foundation ( 2) at the bottom (5) sea / water. [0151] To carry out the aforementioned anchoring operation, the following steps are carried out, in any order or simultaneously: in a first step, illustrated by Figure 8b, the main space (6) is filled with ballast material (7) of the foundation (2), using pumps or controlling the opening of the water intake points (8, 8 '), flooding the foundation (2) through its submerged region. With this, it is achieved that the filling of said foundation (2) occurs in a stable way for the whole wind turbine (1). Likewise, in a second step, the ascent / descent means (20) of the auxiliary floating system (17) are acted upon, in order to reduce the height or height of the foundation (2) (Figure 8c), until it is supported on the marine / aquatic bottom (5), maintaining at all times a positive freeboard of said auxiliary floating system (17) (Figure 8d). At this point, the wind turbine assembly (1) will be resting on the bottom (5), at its final installation point (21). [0153] In the final stage of the wind turbine installation procedure (1), in a preferred embodiment of the invention, the floating auxiliary system (17) is definitively uncoupled from the foundation (2), following one or more of the following steps: In a first step, the ascent / descent means (20) of the auxiliary floating system (17) are acted upon, to reduce and / or cancel the vertical forces supported by the vertical connection means (19). In a second step, said vertical connection means (19) are disconnected from the foundation (2). And, in a third step, the auxiliary floating system (17) is towed for its recovery and / or reuse in other installation operations (for example, to install multiple wind turbines (1) in the same offshore wind farm). [0155] Once the wind turbine (1) is supported on the bottom (5), before or after the final decoupling of the auxiliary floating system (17), it is possible to carry out additional ballasting operations of the main space (6) of the foundation (2), depending on as shown, by way of example, in Figures 9a-9b herein. In them it is appreciated how said main space (6) is filled with a ballast material (7) of a granular type (for example, sand or gravel) occupying most of the volume delimited by said space (6). Likewise, to prevent said ballast (7) from leaving the foundation (2) due to erosion, scour or displacement of the surrounding water mass, the granular material can be covered with a surface layer of rocks, as a superior protection. In different embodiments of the invention, it is also possible to fill the shaft (1 ") of the wind turbine tower with water and / or with solid ballast, at least up to the level of the water level (15). [0156] Finally, the foundation (2) or any other submerged part of the wind turbine (1) can also be protected with anti-scour elements such as rock, sand, seeds, tires or other similar protection elements.
权利要求:
Claims (18) [1] 1.- Installation procedure of an offshore wind turbine (1), of the type comprising a wind turbine (1 ') and a tower shaft (1' '), where the wind turbine (1) is also equipped with a foundation (2) comprising: a lower slab (3) and a perimeter wall (4) arranged on said lower slab (3), so that said foundation (2) acts as a support base for the wind turbine (1) on the seabed (5), and where the interior enclosure delimited by the lower slab (3) and the perimeter wall (4) forms a main space (6) open at the top, said foundation (2) being adapted for the admission of ballast material (7) and where, in the absence of said ballast material (7), the wind turbine (1) or its foundation (2) is floating or self-floating; the procedure being characterized in that it comprises carrying out the following steps: a) the foundation (2) is built dry; b) said foundation (2) is floated; c) said foundation (2) is transported in a floating or self-floating way, to the vicinity of a work dock (16); d1) ballast material (7) is introduced into the main space (6) of the foundation (2), d2) before or after step d1), the draft of the foundation (2) is increased until it rests on a support ground (11) on the seabed (5), in a mounting position in the vicinity of said work pier (16) where, when the foundation (2) rests on said ground (11), the upper level of the perimeter wall (4) remains above the water level (15), without the water overflows superiorly from the outside of the foundation (2) towards the interior of its main space (6); e) at least part of the shaft (1 '') of the tower (8) and the wind turbine (1 ') are mounted on the foundation (2), using for this purpose a crane arranged on the work dock (16); f) while the foundation (2) remains supported in the mounting position on the support ground (11), the foundation (2) is coupled to an auxiliary floating system (17), in such a way that said foundation (2) and said auxiliary floating system (17) become united in at least altered, rolling and pitching, the set of said foundation (2) and said auxiliary floating system (17) forming a transport unit (18), where auxiliary floating system ( 12) comprises: - vertical connection means (19), adapted to vertically connect the foundation (2) and the auxiliary floating system (17) and that allow the transmission of vertical forces between them; - ascending / descending means (20) adapted to regulate in a controlled manner the height or vertical position of the foundation (2); g) A vertical upward force is applied through the ascent / descent means (20) on said foundation (1) and a vertical downward force on said auxiliary floating system (12), in such a way that at least part of the weight of the foundation (2) and / or the wind turbine (1) is suspended from said auxiliary floating system (12); h) the ballast material (7) of the main space (6) of the foundation is reduced; i) the transport unit (18) is put afloat; j) the transport unit (18) is transported in a floating or self-floating way, until it is located on a definitive installation point (21) on the seabed (5); k) The foundation (2) is supported on the seabed, on the final installation point (21), following the following steps in any order or simultaneously: k1) ballast material (7) is introduced into the main space (6) of the foundation (2); k2) the ascent / descent means (20) are acted upon to reduce the height or height of the foundation (2) in a controlled manner, until it is supported on the seabed (5) at the installation point (21), keeping at all times a positive freeboard of the auxiliary floating system; l) the auxiliary floating system (17) is uncoupled from the foundation (2), following one or more of the following steps: 11) the ascent / descent means (20) are acted upon to reduce and / or cancel the vertical forces supported by the vertical connection means (19); 12) the vertical connection means (19) of the foundation (1) are disconnected; m) the auxiliary floating system (17) is transported for its recovery and / or reuse. [2] 2.- Method according to the preceding claim, wherein the foundation (2) of the wind turbine (1) comprises one or more of the following elements: - a lower pedestal (2 ') for supporting the tower shaft (1' '); - one or more separation partitions (10) arranged inside the main space (6) of the foundation (2); - a plurality of struts (9) or struts to support the tower shaft (1 ''), or connected to a pedestal (2 ') of the foundation itself (2) and / or to the perimeter wall and / or partitions (10 ) of separation arranged inside the main space (6) of the foundation (2). [3] 3. - Procedure according to any of the preceding claims, where: - the lower slab (3) and / or the perimeter wall (4) are watertight, or - The lower slab (3) and / or the perimeter wall (4) comprise auxiliary points (8, 8 ') for the admission of ballast material (7), optionally equipped with filling valves. [4] Four. [5] 5. [6] 6. [7] 7. [8] 8. [9] 9. [10] 10. [11] eleven. [12] 12. [13] 13. [14] 14. [15] fifteen. [16] 16. [17] 17. [18] 18. Wind turbine (1) installed using a procedure according to any of the preceding claims.
类似技术:
公开号 | 公开日 | 专利标题 US10774813B2|2020-09-15|Floating structure and method of installing same ES2431583T3|2013-11-27|Support structure for use in the marine wind farm industry JP6039097B2|2016-12-07|Floating transport and installation structure, and floating wind turbine EP2559814B1|2015-04-15|Gravity foundation CN110382781B|2022-01-04|Marine structure for laying the foundation of buildings, equipment and wind turbines by gravity in a marine environment ES2512723T3|2014-10-24|Catamaran-type boat useful for the assembly, transport and deposit at the bottom of the sea of a marine wind turbine CN103228909A|2013-07-31|Process for installing an offshore tower ES2642177B1|2018-08-29|AUXILIARY FLOATING SYSTEM FOR THE INSTALLATION AND / OR TRANSPORTATION OF MARINE STRUCTURES AND PROCEDURE THAT INCLUDES SUCH SYSTEM. ES2835551T3|2021-06-22|Gravity foundation for offshore wind turbines US10443574B2|2019-10-15|Gravity foundation for the installation of offshore wind turbines ES2785802B2|2021-05-19|INSTALLATION PROCEDURE FOR A TORRE MAR INTO WIND GENERATOR ES2593263B1|2017-09-12|Gravity foundation system for the installation of wind turbines or offshore facilities and procedure for the installation of a foundation system for wind turbines or offshore facilities ES2475095T3|2014-07-10|Floating stabilization device EP2918729B1|2017-09-13|Foundation base TWI714708B|2021-01-01|Offshore wind power generation equipment and construction method thereof ES2796978A1|2020-11-30|PROCEDURE FOR THE MAINTENANCE OF WIND TOWERS USING AUXILIARY FLOATING SYSTEMS | ES2439777A1|2014-01-24|Process of replacing or removing the wind turbine in single-floating monolithic structures |
同族专利:
公开号 | 公开日 CN113906183A|2022-01-07| WO2020201605A1|2020-10-08| ES2785802B2|2021-05-19|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题 ES2286039T3|1999-11-11|2007-12-01|Yrjo Rinta-Jouppi|PROCEDURE AND APPLIANCE FOR INSTALLING AND TRANSPORTING A MARINE ENERGY CENTER.| WO2010019050A1|2008-08-14|2010-02-18|Dr. Techn. Olav Olsen As|Foundation for an offshore wind turbine generator and method of constructing and installing the foundation| EP2428443A1|2010-07-12|2012-03-14|Jlangsu Daoda Offshore Wind Construction Technology Co. Ltd|Installation method and recovery method for offshore wind turbine| GB2493023A|2011-07-22|2013-01-23|Sway Turbine As|Wind turbine foundation with pontoons| WO2014204372A1|2013-06-20|2014-12-24|Vingkraft Ab|Barge and method for handling offshore wind turbine structures|
法律状态:
2020-10-07| BA2A| Patent application published|Ref document number: 2785802 Country of ref document: ES Kind code of ref document: A1 Effective date: 20201007 | 2021-05-19| FG2A| Definitive protection|Ref document number: 2785802 Country of ref document: ES Kind code of ref document: B2 Effective date: 20210519 |
优先权:
[返回顶部]
申请号 | 申请日 | 专利标题 ES201930315A|ES2785802B2|2019-04-05|2019-04-05|INSTALLATION PROCEDURE FOR A TORRE MAR INTO WIND GENERATOR|ES201930315A| ES2785802B2|2019-04-05|2019-04-05|INSTALLATION PROCEDURE FOR A TORRE MAR INTO WIND GENERATOR| CN202080041384.5A| CN113906183A|2019-04-05|2020-04-03|Method for installing offshore wind turbine tower| PCT/ES2020/070224| WO2020201605A1|2019-04-05|2020-04-03|Method for the installation of an offshore wind turbine tower| 相关专利
Sulfonates, polymers, resist compositions and patterning process
Washing machine
Washing machine
Device for fixture finishing and tension adjusting of membrane
Structure for Equipping Band in a Plane Cathode Ray Tube
Process for preparation of 7 alpha-carboxyl 9, 11-epoxy steroids and intermediates useful therein an
国家/地区
|