![]() Foundation for a wind turbine tower (Machine-translation by Google Translate, not legally binding)
专利摘要:
Foundations for a wind turbine tower with at least three columns comprising a reinforced concrete pile for each column of the tower, each column (3) joining its corresponding pile (5). Inside the pile (5) there is a cage of bolts (7) and a main reinforcement (6) made by a cylindrical framework of horizontal rings (6a) and vertical bars (6b). The bolt cage (7) is arranged inside the main reinforcement (6) at a radial distance of less than 0.1 meters. The concrete is not poured until the three perforations have been made and the assemblies and the cages are in place and coordinated, since it is necessary to coordinate the position between the three bolt cages (7). (Machine-translation by Google Translate, not legally binding) 公开号:ES2761655A1 申请号:ES201931002 申请日:2019-11-18 公开日:2020-05-20 发明作者:Costa Hely Ricardo Savii;De La Rua Ion Arocena;Pascual Eneko Sanz;Zabalza Arantxa Esparza 申请人:Nabrawind Technologies SL; IPC主号:
专利说明:
[0004] Field of the Invention [0006] The present invention presents a foundation for a wind turbine whose tower is made up of a tubular upper part and a lower part made up of at least three columns and their corresponding diagonals and horizontal joints. The union of the tower is established on three independent and equidistant foundations, each of them joined to its corresponding column. [0008] Background [0010] The technology related to the connection between a tower and its foundation is sufficiently described in the state of the art. The foundations basically consist of a large concrete disk that has in its central part a cage of bolts or connecting ferrule (for the metal towers) or tendon anchors (for the concrete towers). These bolt connections or tendon anchors protrude from the foundation and are used for the connection of the tower (specifically with the flange that borders its lower end for metal towers and with tensioning tendons for concrete towers). [0012] Patent EP2108836 discloses reinforced concrete foundations that are made in situ and have steel pieces that protrude upwards above the concrete foundation. During the placement of the tower segment (be it metal or concrete), the steel pieces cross the cylindrical segment constituting the union between tower and foundation. In the current patent, a connection element made with higher quality precast concrete is added, which reduces assembly times. [0014] In patent EP2192238 the peculiarity is the arrangement of a second set of metallic elements that are arranged at an angle other than 0 with respect to the longitudinal direction of the tower. Said second set of metallic elements also passes through the flange and is fixed to it by means of fixing elements. [0015] Wind foundations are usually gravitational (solution where the stability of the wind turbine is based on the mass of the foundation). Only in very poor soils are piles used around the disc to achieve the necessary stability by connecting the foundation to more stable soil strata. This operation typically makes the foundation more expensive, since it is necessary to use both the main disk (pile cap that distributes the loads from the tower to the piles) and the piles. [0017] Furthermore, piloted or deep foundation technology is used for many applications, especially in construction. It is a vertical column placed inside the land, on which the element that transmits the loads is connected. In the case of foundations, it was developed to achieve foundations in poor, wet or flooded soils, where shallow foundations are not viable due to the low bearing capacity of the terrain or the possibility of generating seats due to the continued pressure in the ground at the long of the time. [0019] The foundation of offshore structures (jackets), which is anchored to the seabed, usually uses pile technology. In this case, the pile is a metal tube. In offshore, the union between the foundation and the structure is made using two tubes. One tube is the pile and the other tube is one of the legs of the structure, usually inserted one into the other and with mortar between them. [0021] Proof of this are patents EP2495370 that instead of piloting and then connecting the legs of the structure (the piles are larger and the legs smaller) by grouting, stamping or welding, they introduce the piles into the ground at the same angle as They have the legs thanks to some sleeves that serve as a guide. And the patent US4812080 whose supporting structure or jacket is anchored to the seabed by means of the hollow legs that are piloted on the ground, presents a method for anchoring the legs from an external platform and after having placed the supporting structure or jacket on the seabed . This is achieved by means of sleeves on the legs and the piles that are guided inside the sleeves and legs. [0023] WO9616233 A1 and US5826387 A disclose a foundation with piles to support high towers such as high voltage towers and even wind turbines. The foundation is a large hollow concrete cylinder bounded internally and externally by a corrugated metal tube. Inside the concrete there is a Bolt cage, the bolt cage bolts being slidably housed through PVC hollow tubes to prevent adhesion between bolts and concrete and thus allow bolt tensioning. [0025] Description [0027] The object of the invention is to provide a foundation as defined in the claims, to obtain the settlement of an onshore tower. [0029] For this, the manufacturing process of drilling at least three holes in the ground is followed, introducing the main reinforcement that gives consistency to the concrete, adding the cage of bolts that constitutes the union with the tower flange and in the last step , concreting the whole set. [0031] The bolt cage and the main concrete reinforcement are radially close together, preferably at a distance of less than 0.1 meters, so that when the concrete sets, the two elements are as if they were physically joined, managing to transmit the tower tensile loads. They can also be joined by means of some connecting element, prior to pouring the concrete. [0033] The piles that make up the foundation of the invention are coordinated in such a way that when connecting the tower with the foundation, it is perfectly positioned and the metallic elements that protrude from the foundation (the upper part of the bolt cage) pass through the holes interns on the tower flange without difficulty. [0035] The advantages provided by the foundation of the invention are: [0037] The resistance of the pile to compression is provided by the sum of the resistance of its point in compression against the lower substrate, plus the friction between the lateral surface and the walls. The pile's tensile strength is exclusively provided by friction between the lateral surface and the walls. [0039] The foundation of the invention is very competitive in costs for the proposed tower configuration (a structure of columns, diagonal and horizontal), since the Tower columns transmit primarily vertical loads, so they do not need any additional pile cap to transmit loads to the pile. The resulting piles each comprise a diameter between 1 and 2 meters and a depth of between 20 and 40 meters. Therefore, these piles are easily built with specialized machinery available worldwide and very quickly (1 pile per day - 1 foundation every three days), allowing the speed of installation of the wind farm to be very fast. [0041] On the other hand, a great saving of concrete and metallic material is achieved (both in the assembly and in the cage of bolts). If a conventional foundation for a 160-meter-high metal tower uses a concrete volume of 600 m3, the solution of the invention uses only 150 m3 for the foundation of a tower of the same height. The metallic material used in the assembly is reduced from 100 tons to 15 tons and the bolt cage can be reduced to less than one meter in height and to a diameter close to one meter. [0043] Brief description of the drawings [0045] In the following, a series of drawings that help to better understand the invention and that expressly relate to an embodiment of said invention that is presented as a non-limiting example of it, is briefly described. [0047] Figure 1 represents a wind turbine anchored to the ground with the foundation according to the invention. [0049] Figure 2A schematically shows the lower part of the wind turbine tower anchored to the foundation piles of figure 1. [0051] Figure 2B shows a cross-sectional detail of the anchoring of one of the columns of the wind turbine to one of the foundation piles. [0053] Figure 3A shows a top view of the connection of the main assembly with the bolt cage of Figure 2B. [0055] Figure 3B shows a cross section along line AA 'of the joint of the main assembly with the bolt cage of Figure 3A. [0056] Figure 4 represents an embodiment of the foundation of the invention with three piles. [0058] Figure 4B is an enlarged image of one of the piles of Figure 4A with the connecting element that coordinates the three piles. [0060] Figure 5 shows a section of one of the piles in Figure 2A, following the axis of symmetry of the pile, anchored to the corresponding column of the wind turbine once the assembly process is completed but without representing the concrete. [0062] Figure 6 shows a section of another embodiment of one of the piles of the invention. [0064] Detailed description [0066] As shown in Figure 1, the wind turbine capable of being supported by the foundation of the invention above ground level (4) comprises at its upper part of the nacelle, a rotor and blades (1), and a tower formed by an upper tubular part (2) and a lower part formed by a triangular structure of three columns (3), preferably vertical. [0068] Figure 2A focuses on representing the triangular structure of three columns (3) of the wind turbine and its settlement on the ground (4) using reinforced concrete piles (5) that extend after the columns (3) that make up the three wind turbine tower legs. The piles (5) are arranged below ground level (4). The columns (3) of the wind turbine can be profiles, for example profiles such as IPN, UPN, UPL, IPE, HEA, HEB, etc. or they can also be hollow or solid circular bars. [0070] Inside each pile (5) there is a main reinforcement (6) formed by horizontal rings (6a) and vertical bars (6b) joined together, forming a cylindrical framework that extends throughout the length of the pile (5). [0072] Each pile (5) also includes a cage of bolts (7) arranged in the upper part of the interior of the main reinforcement (6) at a radial distance of less than 0.1 meters, preferably at a distance of between 0.05 and 0.1 meters, as shown for example in figure 3B, so that when the concrete sets the elements remain as if they were physically joined, allowing the transmission of tensile loads generated by the tower in use from the bolt cage (7) to the main reinforcement (6) and finally to the concrete. As seen in Figure 3B, in the preferred embodiment of the invention, the main reinforcement (6) is arranged near the outer contour of the pile (5) and the bolt cage (7) is arranged inside the reinforcement. (6) main. [0074] As seen in Figure 3B, in the preferred embodiment of the invention the height of the main reinforcement (6) is the same as the depth of the pit where the pile (5) is arranged. [0076] In the sectioned detail represented in Figure 2B, the connection between a pile (5) and the corresponding column (3) is seen in greater detail. In said figure 2B it is seen as: [0077] - the upper part of the pile (5) protrudes from the ground level (4), and [0078] - as the bolt cage (7) in turn protrudes from the top of the pile (5) so that the portion of the bolt cage (7) protruding from the pile (5) passes through a flange (8) comprised in the column (3) of the wind turbine. [0080] The upper part of each bolt cage (7) comprises an upper ferrule (9a) that is crossed by metallic elements composed of threaded bars, which make up the bolt cage (7), as seen for example in figure 5 Said upper ring nut (9a) is adapted to cooperate with the flanges (8) of the columns (3) of the wind turbine so that the metallic elements of the cage of bolts (7) protruding from the pile (5) pass through the upper ring nut. (9a) and the corresponding flanges (8), thus allowing the fixing or anchoring of the column (3) of the wind turbine to a corresponding pile (5) for example using nuts or similar means that are housed in the protruding part of the metallic elements of the cage (7) that protrude and press against the flanges (8) of the wind turbine. [0082] In figure 2B it is seen how the upper ferrule (9a) is arranged above the reinforced concrete of the corresponding pile (5), supported on it, so that said upper ferrule (9a) is exposed, that is to say, it is not buried in the concrete and is therefore visible. [0083] The integration of the bolt cage (7) in the pile (5) generates a connection that allows reversible mounting and dismounting of structures (in this case the wind turbine tower), functionality that does not exist in the classic piles used to date. , which are designed to be permanently connected (typically through a pile cap) to the structure to be supported. [0085] However, optionally the cage of bolts (7) and the corresponding reinforcement (6) of each pile (5) can also be joined by means of some connecting element, placed prior to the pouring of the concrete. In the preferred embodiment of the invention, the bolt cage (7) and the reinforcement (6) of each pile (5) are connected by means of loops (10) that extend between the framework of horizontal rings (6a) and vertical bars (6b). ) that make up the main assembly (6) and a lower ring nut (9b) arranged in the lower part of the cage of bolts (7). The material of the tie ties (10) is preferably metal although other materials are not ruled out. [0087] Optionally, the main reinforcement (6) of each pile (5) can comprise two parts, a lower half and an upper half so that when joining both halves, the complete reinforcement (6) is formed. This configuration of reinforcement is advantageous during the preparation of the foundation, as will be detailed later. [0089] In a variant of the invention, each pile (5) can comprise a secondary reinforcement (6 '), also preferably formed by vertical bars (6b') and horizontal rings (6a ') that form a cylindrical framework, to further increase consistency of concrete. In this embodiment, the secondary reinforcement (6 ’) is arranged inside the bolt cage (7), as shown in figure 6, preferably at a radial distance of less than 0.1 meters. This sandwich-like arrangement of the bolt cage (7) enables the transmission of the tensile loads generated by the tower to be more uniform and effective, further increasing the stiffness of the set concrete. [0091] In this embodiment, the secondary reinforcement (6 ') has a height, preferably slightly higher, than the section of the bolt cage (7) that is embedded inside the concrete, for example of the order of 0.5 meters higher . The secondary reinforcement (6 '), being this shorter than the main reinforcement (6), is curved at the bottom to join the main reinforcement (6) that continues preferably straight and parallel to the outer contour of the pile (5). The main assembly (6) and the secondary assembly (6 ') can be joined by connecting loops (10 '), preferably arranged horizontally, which can be arranged alone or in pairs. Said connection loops (10 ') are arranged between the vertical bars (6b, 6b') of the main reinforcement (6) and the secondary reinforcement (6 '), preferably spaced equidistant, as shown in figure 6 The material of the tie ties (10 ') is preferably metal although other materials are not ruled out. [0093] The procedure for preparing the foundation of the invention is as follows. The points where the drilling or pits are to be made are indicated. Said perforations are of small diameter, compared to the perforations of the foundations of the state of the art, and of great depth. In a non-limiting example, the diameter of the hole (or drilling) will be approximately 1.5m and the depth will reach 25m or more. You start with drilling the first hole. Once completed, the main assembly (6) is introduced, which will be placed on the outline of the hole. Being such deep holes, in a variant of the invention where the main assembly (6) comprises two parts, a lower half and an upper half, the lower half of the assembly (6) could be inserted first and before completely introducing said The lower half in the hole would join the upper half of the armature to the lower half, so that the entire assembly (6) is joined together to form a single piece. The union between the lower half and the upper half will be made by welding, reinforcement overlaps or any other type of equivalent union. [0095] In Figures 3A and 3B it is shown how the upper half of the assembly (6) incorporates the cage of bolts (7) inside its upper end. The bolt cage (7), in any of the described embodiments, has a height comprised in a range between 0.8 and 2 meters and a diameter less than that of the main assembly (6). Therefore, in the preferred embodiment of the invention, the height of the bolt cage (7) is less than the height of the pile (5) or the main assembly (6) of the pile (5). [0097] Each bolt cage (7) comprises an upper ferrule (9a) and a lower ferrule (9b), said ferrules (9a and 9b) being connected through threaded bars arranged longitudinally to the axis of the tower and more specifically, to the axis of its corresponding column (3). [0099] Before completing the introduction of the upper part of the main assembly (6), the bolt cage (7) is placed inside it. Bolt cage (7) can be left suspended by the upper ring nut (9a), which in turn rests on the ground, centered with respect to the drilling of the corresponding pile (5). Optionally, the bolt cage (7) and the main reinforcement (6) can be physically joined before the concrete is poured, thus avoiding the use of auxiliary means to hold the bolt cage (7) in place during assembly. In the preferred method of the invention, said union is made with the loops (10) previously described, which extend between the framework of horizontal rings (6a) and vertical bars (6b) that make up the reinforcement (6) and the ferrule lower (9b) that houses the threaded bars that make up the bolt cage (7). Optionally, said loops (10) can comprise welding points to further secure said joint. [0101] With the intention of facilitating the assembly of the main assembly (6) and the cage of bolts (7), these elements can be previously linked together, through the loops (10), and this operation can be carried out outside the pit as if it were It will be a pre-assembly, which allows the entire assembly to be introduced into the pit simultaneously before the concrete is poured. [0103] The upper ring nut (9a) includes through holes (11) to facilitate the fixing of the leveling elements. [0105] The pouring of the concrete does not take place until the three perforations have been made, the main reinforcement (6) and the secondary reinforcement (6 ') are in place in case a double reinforcement pile (5) is to be built, and the cages (7) in each hole or drilling. The pouring of the concrete is completed when the three bolt cages (7) are perfectly aligned with each other, that is, when the relative position between them has been coordinated, protruding the same distance and totally parallel to the axis of the wind turbine tower, since It must be guaranteed at all times that when "puncturing" the tower there are no assembly problems, "puncturing" being understood to be the operation of joining the tower to the foundation. To achieve this, the leveling elements are anchored on the upper ferrules (9a), through the through holes (11). In an embodiment of the invention said leveling elements may be beams or plates (12) arranged at 60 ° that extend to the adjacent upper ferrules (9a) composing an equilateral triangle, as shown in Figures 4A and 4B . However, in a variant of the invention, said leveling elements may be mechanical-optical measuring instruments, such as a theodolite. In this sense, on each upper ferrule (9a) it would be temporarily placed a theodolite, so that the equilateral triangle defined by the three bolt cages (7) is defined in space. [0107] Once the described assembly process is completed, the concrete is poured in each hole in the ground (4) so that when the concrete sets, a pile (5) is generated in each hole. This reduces total assembly times and saves on materials since the concrete required to make the piloted foundation is less compared to the foundations of the state of the art and the material used to make the bolt cage (7) it is also smaller since cages (7) as large are not necessary. [0109] Once the concrete of each pile (5) has set, the leveling elements, that is, the mechanical-optical measuring instruments or the beams or plates (12) that hold together and align the bolt cages (7) of each pile ( 5) of the foundation of the invention are removed. [0111] Figure 5 shows a section, following the axis of symmetry, of the pile (5) of the preferred embodiment and its corresponding column (3). This figure shows the arrangement between the bolt cage (7) and the main assembly (6) once the assembly process is complete, with the loop (10) that joins them between the two. [0113] As can be seen in said figure 5, the upper part of the pile (5) protrudes from the ground level (4) to avoid soil moisture and minimize corrosion at the joint. [0115] In a variant of the method of the invention, before pouring the concrete, the secondary reinforcement (6 ') is introduced into each pile (5) simultaneously with the introduction of the main reinforcement (6), being arranged between both reinforcements (6 and 6') the bolt cage (7), as shown in figure 6. [0117] In this embodiment, the main assembly (6) and the secondary cabinet (6 ') can be physically connected through the connection loops (10') described above. Said connection loops (10 ') are preferably arranged horizontally, and can be arranged alone or in pairs, as shown in figure 6. Said connection loops (10') are arranged between the vertical bars (6b, 6b ') of the main assembly (6) and of the secondary assembly (6'), preferably equidistant apart. [0118] With the intention of facilitating the assembly of the main (6) and secondary (6 ') reinforcements and the cage of bolts (7), these three elements can be previously linked together. This union can be carried out outside the pit, as if it were a pre-assembly, which allows the entire assembly to be introduced into the pit simultaneously before pouring the concrete. The tie loops (10 ') would hold together the vertical bars (6b, 6b') of the main frame (6) and the secondary frame (6 ') and the loops (10) would hold the cage of bolts (7) attached to the frame (6) main or to the armed (6 ') secondary, or even both. Optionally, the joint loops (10 ') or the loops (10) can comprise welding points to further secure said joint.
权利要求:
Claims (1) [0001] 1- Foundation for a wind turbine tower whose tower is made up of a tubular upper part (2) and a lower part made up of at least three columns (3), characterized in that it comprises a reinforced concrete pile (5) for each column (3 ), arranging inside each pile (5) a cage of bolts (7) and a main reinforcement (6) formed by horizontal rings (6a) and vertical bars (6b) joined together forming a cylindrical framework, said reinforcement being arranged (6) main on the periphery of the corresponding pile (5) and the cage of bolts (7) in the upper part of the interior of the corresponding reinforcement (6) and radially at a distance of less than 0.1 meters so that when the concrete it is possible to transmit in use the tensile loads generated by the tower from the bolt cage (7) to the main reinforcement (6) and finally to the concrete, each bolt cage (7) being adapted to cross a flange (8) of column (3). 2- Foundation according to claim 1, wherein inside each bolt cage (7) there is a secondary reinforcement (6 ') formed by vertical bars (6b') and horizontal rings (6a ') that form a cylindrical framework . 3- Foundation according to claim 2, wherein the secondary reinforcement (6 ') is arranged radially at a distance less than 0.1m from the bolt cage (7). 4- Foundation according to claim 2 or 3, wherein the secondary reinforcement (6 ') comprises a height greater than the span of the bolt cage (7) that is embedded inside the concrete, preferably on the order of 0.5 meters higher. 5- Foundation according to any of claims 2 to 4, wherein the main reinforcement (6) and the secondary reinforcement (6 ') are joined by means of connection loops (10') that are arranged between the vertical bars (6b, 6b ' ) of the main assembly (6) and of the secondary assembly (6 '). 6- Foundation according to any of the previous claims, wherein each cage of bolts (7) is physically attached to the framework of the main reinforcement (6) of the corresponding pile (5) by ties (10) that are fixed between the framework of horizontal rings (6a) and vertical bars (6b) that make up the main reinforcement (6) and a lower ring nut (9b) of the bolt cage (7). 7- Foundation according to any of the preceding claims, wherein each bolt cage (7) comprises an upper ferrule (9a) that protrudes from the ground level (4) and that is in direct contact with the upper part of the pile (5) , said upper ferrule (9a) being adapted to also be in direct contact with the flange (8) of the column (3). 8- Foundation according to claim 7, wherein the upper ferrule (9a) comprises through holes (11) arranged at 60 ° suitable for arranging leveling elements that interact with all the adjacent bolt cages (7) during the assembly of the piles (5). 9- Foundation according to any of the preceding claims, wherein the bolt cage (7) has a height comprised in a range between 0.8 and 2 meters and the main reinforcement (6) has a height comprised in a range between 20 and 40 meters. 10- Method of making a foundation according to any of the preceding claims, characterized in that - a hole is drilled in the ground (4) for each pile (5), - a main reinforcement (6) is introduced for each pile (5) that extends along the contour of the hole covering its entire depth by means of a cylindrical framework of horizontal rings (6a) and vertical bars (6b), - a bolt cage (7) is inserted in the upper part of the reinforcement of each pile (5) so that an upper ferrule (9a) comprised in said bolt cage (7) protrudes from the ground level (4), - the position of the bolt cages (7) is coordinated by means of leveling elements that interact with the upper ferrules (9a) and that are arranged 60 ° from each other, - proceed with the pouring of concrete into each hole in each pile (5), and - once the concrete has set, the connection between the upper part of the upper ring nut (9a) of each bolt cage (7) is completed ) protruding from the floor (4) and the flange (8) of the corresponding column (3) of the tower. 11- Method according to claim 10, where the connection between the cage (7) of bolts and the main assembly (6) of each pile (5) is made through a loop (10) that joins the ring framework horizontal (6a) and vertical bars (6b) with the lower ring nut (9b) which allows the main assembly (6) and the cage of bolts (7) to be inserted into the corresponding ground hole together. 12- Method according to claim 10 or 11, wherein a secondary reinforcement (6 ') is introduced simultaneously with the main reinforcement (6), which are preferably previously connected by means of connection loops (10'), and subsequently introduced the cage of bolts (7) between both assemblies (6, 6 '). 13- Method according to claim 12, wherein the main reinforcement (6), the secondary reinforcement (6 ') and the cage of bolts (7) are joined to each other outside the hole in the ground which allows the entire assembly to be introduced into the corresponding hole together. 14- Method according to any of claims 10 to 13, which also comprises an operation of removing the leveling elements that interact with all the upper ferrules (9a) of the adjacent bolt cages (7) once the concrete has set. 15- Method according to any of claims 10 to 14, wherein the main reinforcement (6) of each pile (5) comprises two parts, a lower half and an upper half so that - first the lower half of the main reinforcement (6) is inserted and then the upper half in the hole of each pile (5), and - before inserting the lower half completely into the corresponding pile hole (5), the upper half is joined to the lower half, preferably by welding or any other equivalent permanent joint, so that the entire main assembly (6) be joined together to form a single piece.
类似技术:
公开号 | 公开日 | 专利标题 ES2524840A1|2014-12-12|Foundation system for towers and installation procedure of the foundation system for towers | US9739027B2|2017-08-22|Perimeter pile anchor foundation ES2217289T3|2004-11-01|FOUNDATION WITH PILOTS WITHOUT VOLTAGE. ES2369669T5|2020-11-16|Procedure for erecting a tower as well as a wind power installation ES2794126T3|2020-11-17|Frame structure and method of construction of the same JP2006207124A|2006-08-10|Steel-made pier structural body and its construction method ES2784000T3|2020-09-21|Foundation for a windmill CN104652475B|2016-09-21|A kind of truss-like retaining wall ES2562757T3|2016-03-08|Foundation construction of a maritime installation, particularly of a marine wind turbine, to be installed silently, and assembly procedure for it CN107842046A|2018-03-27|A kind of strengthening of foundation error-correction structure and the method for strengthening of foundation correction CN105525624A|2016-04-27|Connecting and water resisting method for assembled steel pipe column type tower crane foundation and structural base plate ES2844124T3|2021-07-21|Tower section to automate a wind turbine and method of authorizing it ES2761655B2|2021-04-27|Foundation for a wind turbine tower and method of making said foundation ES2764468B2|2021-05-28|FOUNDATION FOR WIND TOWERS CN102828503A|2012-12-19|H-shaped supporting pile made of prefabricated reinforced concrete US10738436B1|2020-08-11|Tubular foundation for onshore wind turbine generators CN110761192B|2021-07-06|Caisson pile foundation and construction method thereof JP2006188862A|2006-07-20|Construction method of structure, and foundation structure used for the same CN206706803U|2017-12-05|Large diameter steel pipe concrete-pile CN204875761U|2015-12-16|Pile foundation construction equipment US20200208612A1|2020-07-02|Bionic Root Foundation for Onshore Wind Turbine Generators ES1276849U|2021-08-24|NEW WIND GENERATOR AND ITS ANCHORS | CN210262915U|2020-04-07|Integrated configuration of revetment pipe groove plank road CN212983871U|2021-04-16|Vertical batter pile combination foundation pit supporting structure EP3401445B1|2020-08-19|Anchoring section for a foundation structure
同族专利:
公开号 | 公开日 SE1951274A1|2020-05-20| US20200157759A1|2020-05-21| ES2761655B2|2021-04-27| US11028551B2|2021-06-08| CN111197318A|2020-05-26| ES2761748A1|2020-05-20| SE543972C2|2021-10-12| BR102019023318A2|2020-06-02| DE102019217692A1|2020-05-20|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题 JPS55122916A|1979-03-16|1980-09-22|Kurosawa Kensetsu Kk|Method for building prestressed concrete-made pier foundation| US4842447A|1987-10-21|1989-06-27|Lin Juei Jse|Manufacturing method and device of hollow-typed reverse circulating piles| JPH0525832A|1991-07-22|1993-02-02|Hitachi Metals Ltd|Structural steel pedestal| US20140255106A1|2013-03-07|2014-09-11|Allan P. Henderson|Perimeter pile anchor foundation| CN104343129A|2013-08-06|2015-02-11|江苏金海新能源科技有限公司|Reversing formwork for manufacturing cast-in-situ prestressed concrete cylindrical fan foundation| KR20160062011A|2013-09-26|2016-06-01|포마|Anchoring device and method| KR20160057238A|2014-11-13|2016-05-23|하경엔지니어링|Composite phc pile with concrete filling plate and construction method therefor| WO2016181669A1|2015-05-08|2016-11-17|日立造船株式会社|Rigid connection structure for bottom end of pillar and concrete pile| EP3467304A1|2016-05-27|2019-04-10|Nabrawind Technologies SL|Tower section for automatically raising a wind turbine and automatic raising method for same| US4812080A|1987-07-24|1989-03-14|Atlantic Richfield Company|Offshore platform jacket and method of installation| US5586417A|1994-11-23|1996-12-24|Henderson; Allan P.|Tensionless pier foundation| US8161698B2|2007-02-08|2012-04-24|Anemergonics, Llc|Foundation for monopole wind turbine tower| DE102007060379C5|2007-12-12|2018-11-15|Senvion Gmbh|Anchoring a tower of a wind turbine| AU2009319068B2|2008-11-26|2013-10-24|Vestas Wind Systems A/S|A foundation and a method for forming a foundation for a wind turbine tower| EP2420623A3|2010-08-20|2014-03-19|JADE Werke GmbH|Sandwich base structure for off-shore wind turbines| EP2495370A1|2011-03-04|2012-09-05|Leenars, Cees Eugen Jochem|In-line piling method for offshore wind turbine foundation applications| DE102012014828A1|2012-07-27|2014-01-30|Repower Systems Se|Dissolved structural structure for a wind energy plant and method for producing a dissolved structural structure for a wind energy plant| EP3411595B1|2016-02-05|2020-10-28|Vestas Wind Systems A/S|Method of replacing anchor bolts in wind turbine foundations| WO2018129471A1|2017-01-06|2018-07-12|Nelson Charles W|Modular offshore wind turbine foundation and modular substructure with suction caissons|
法律状态:
2020-05-20| BA2A| Patent application published|Ref document number: 2761655 Country of ref document: ES Kind code of ref document: A1 Effective date: 20200520 | 2021-04-27| FG2A| Definitive protection|Ref document number: 2761655 Country of ref document: ES Kind code of ref document: B2 Effective date: 20210427 |
优先权:
[返回顶部]
申请号 | 申请日 | 专利标题 ES201831119A|ES2761748A1|2018-11-19|2018-11-19|Foundation for a wind turbine tower | 相关专利
Sulfonates, polymers, resist compositions and patterning process
Washing machine
Washing machine
Device for fixture finishing and tension adjusting of membrane
Structure for Equipping Band in a Plane Cathode Ray Tube
Process for preparation of 7 alpha-carboxyl 9, 11-epoxy steroids and intermediates useful therein an
国家/地区
|