专利摘要:
Polyester pool with integrated pipes and manufacturing process. Pool comprising a glass formed by a series of layers of resin and polyester that has on its walls in a transverse way a series of sections of tubes (1) arranged integrally with the series of layers of resin, and also has some ducts or pipes (5) that run and are attached to the exterior walls of the pool vessel and go from the sections of tubes (1) integrated in the walls of the pool to an end for connection with the pool equipment, remaining said conduits or pipes covered by at least one layer of resin and polyester that is also part of the pool vessel. They allow to obtain a swimming pool that avoids the losses in the points of installation of the nozzles and presents integrated all the conduits and pipes with the own glass of the swimming pool avoiding leaks. (Machine-translation by Google Translate, not legally binding)
公开号:ES2724911A1
申请号:ES201830246
申请日:2018-03-13
公开日:2019-09-17
发明作者:Gatiellas Jordi Julia
申请人:Groupe Deco Emporda S L;
IPC主号:
专利说明:

[0001]
[0002] POLYESTER POOL WITH INTEGRATED PIPES AND MANUFACTURING PROCEDURE
[0003]
[0004] OBJECT OF THE INVENTION
[0005]
[0006] It is the object of the present invention, as the title of the invention establishes, a pool with integrated pipes as well as the manufacturing process carried out for the achievement of the pool object of the invention.
[0007]
[0008] The present invention characterizes the constructive characteristics of the swimming pool object of the invention and which are such that an integral pool is achieved where all the pipes and pipes that are installed around the pool are integrated into the pool hull, not being It is necessary to perform any drilling or installation of pipes and pipes, just connect the free ends of the pipes integrated in the structure of the pool, leaving a pool ready to be mounted directly in the hollow of the ground in the absence of connecting with the pumps and filters
[0009]
[0010] Therefore, the present invention is circumscribed within the scope of the polyester pools and particularly among the construction features.
[0011]
[0012] BACKGROUND OF THE INVENTION
[0013]
[0014] The polyester pools manufactured by all the manufacturers in Europe first manufacture the hull with the shape of the pool, and then proceed to make the necessary perforations on the walls for the connectivity of the supply and filtering pipes. The stages of the manufacturing procedure would be:
[0015]
[0016] - Waxing of a mold where the pool will be manufactured on top of said mold,
[0017] - Once the mold has been waxed, a paint based on unsaturated polyester and styrene (gelcoat ®) designed with a vacuum machine is applied over the waxed mold, until the mold is coated up to 800 microns thick 1
[0018] - Once the unsaturated polyester paint dries, layers of resin and fiberglass are applied until a thickness of 8mm is achieved throughout the pool 2
[0019] - Pool drying,
[0020] - Once the pool is dry, the pool is demoulded and removed from the mold, so the pool is already manufactured
[0021] - Once the manufactured pool is drilled where the absorption, discharge, pool and sump nozzles go,
[0022] - Once the holes have been made, the nozzles consisting of two parts are placed, the interior with a trim that goes inside the pool and the outside that has a thread and two rubber washers, one for each part of the pool and when tightening the thread, the nozzle is fixed
[0023]
[0024] Once this process is made the pool glass. The pool is delivered and the installer proceeds to mount the pool in a hole made in the ground and before filling gravel in its contour, the PVC hydraulic pipes of the outside of the nozzles are glued and taken to the filtration equipment, this is an installation that is independent of the pool body, that is to say, all the pipes and pipes required by the pipe are assembled.
[0025]
[0026] However, there are frequent cases of leaks due to the lack of tightness in the perforations made in the pool vessel, in addition to having to make the pipe duct connections in the pool vessel once placed in the hole carried out in the field, with the difficulty involved and the probability of making connections that are sufficiently tight with the consequent risk of leakage.
[0027]
[0028] Therefore, it is the object of the present invention to develop a pool that integrally has all the pipes and pipes, which also does not present a risk of leakage at the connection points of the pipes with the pool vessel, developing a pool as the one described below and is set out in its essentiality in the first claim.
[0029]
[0030] DESCRIPTION OF THE INVENTION
[0031]
[0032] The object of the present invention is a polyester pool with pipes integrated into the structure of the pool vessel, as well as the manufacturing process thereof.
[0033]
[0034] The pool comprises a glass formed by a series of layers of resin and polyester that It has on its walls in a transverse way a series of sections of tubes arranged integrally with the series of resin layers, and also has some conduits or pipes that run and are attached to the outer walls of the pool vessel and go from the sections of tubes integrated in the walls of the pool to one end for connection with the equipment of the pool, said ducts or pipes being covered by at least one layer of resin and polyester that is also part of the pool vessel.
[0035]
[0036] In this way all the elements of the pool are an integral part of it in the absence of placement of the nozzles in the perforations of the walls of the pool vessel, and subtracting only the placement of the vessel in the hollow of the ground, connection with the own equipment of the pool and gravel filling the sides of the pool.
[0037]
[0038] The manufacturing process comprises the following stages:
[0039]
[0040] - Arrangement and fixing of sections of PCV pipes on top of the manufacturing mold in the position where the nozzles will go. In a preferred but not limiting embodiment, the tubes will be 5 cm long and 500 mm in diameter.
[0041] - Painted mold and tube sections with a paint based on unsaturated polyester and styrene (gelcoat ®).
[0042] - Drying of applied paint
[0043] - Application of layers of resin and polyester in the absence of at least one layer of resin and polyester, also applying resin and polyester in the tubes that have been put. - Making the hydraulic connections with PVC pipe with the sections of pipes integrated in the structure of the pool, with the pipes or pipes on one side of the pool all together.
[0044] - Application of the last layer of resin and polyester to the entire pool and to the conduits and pipes placed at the end, leaving the vessel and the hydraulic conduits or pipes all of them integrated into a unique structure.
[0045] - Pool demolding.
[0046]
[0047] Thanks to the procedure described, once the pool was manufactured, it would only be necessary to place the nozzles, preferably glued into the tube sections, obtaining a pool that does not have any loss of water.
[0048]
[0049] On the outside of the pool, the installer does not have to make connections from the filtration to each nozzle, but to splice all the exits of the installation of conduits and integrated pipes until the filtration, there is no risk of leaks around the pool in the installation, since the pre-installation of conduits and pipes is integrated in the manufacture of the pool.
[0050]
[0051] Unless otherwise indicated, all technical and scientific elements used herein have the meaning normally understood by a person skilled in the art to which this invention pertains. In the practice of the present invention procedures and materials similar or equivalent to those described herein can be used.
[0052]
[0053] Throughout the description and the claims the word "comprises" and its variants are not intended to exclude other technical characteristics, additives, components or steps. For those skilled in the art, other objects, advantages and features of the invention will be apparent in part of the description and part of the practice of the invention.
[0054]
[0055] EXPLANATION OF THE FIGURES
[0056]
[0057] To complement the description that is being made and in order to help a better understanding of the characteristics of the invention, according to a preferred example of practical implementation thereof, a set of drawings is attached as an integral part of said description. where, for illustrative and non-limiting purposes, the following has been represented.
[0058]
[0059] In Figure 1 we can observe the first step of the manufacturing process, which involves fixing some sections of tubes to the pool mold.
[0060]
[0061] Figure 2 shows the mold together with the sections of tubes fixed to it covered by a paint based on unsaturated polyester and styrene.
[0062]
[0063] A detail of the tube sections covered by the previous paint is shown in Figure 3.
[0064]
[0065] Figure 4 shows how after the application of all the layers in the absence of at least one layer of resin and polyester, a series of ducts and pipes are arranged that are fixed on the side walls of the vessel and connected to the tube sections integrated.
[0066]
[0067] Figure 5 shows the pool vessel where you can see how the ducts and pipes are integrated into the pool vessel.
[0068]
[0069] Figure 6 shows the process of gluing the nozzles in the pool vessel.
[0070]
[0071] PREFERRED EMBODIMENT OF THE INVENTION.
[0072]
[0073] In view of the figures, a preferred embodiment of the proposed invention is described below.
[0074]
[0075] In figure 1 we see a mold (2) for manufacturing a pool vessel, on which some sections of pipes (1) are fixed, placed at the points where the discharge nozzles, pool cleaners and sump would be mounted.
[0076]
[0077] Figure 2 shows how the mold (2) and the sections of pipes (1) are covered by a paint based on unsaturated polyester and styrene, obtaining a coated mold (3) of said paint, being able to appreciate a detail of it in figure 3.
[0078]
[0079] Next, a series of successive layers of resin and polyester are applied in the absence of at least one layer, achieving a pool glass (4) that is missing at least one layer, then proceeding to the connection (6) of a series of ducts and pipes (5) with the sections of pipes (1) and said ducts and pipes (5) being attached to the pool vessel by means of clamping means (7), as shown in Figure 4.
[0080]
[0081] Then, at least one additional layer of resin and polyester is applied, the conduits and pipes (5) being integrated in the pool itself, as shown in Figure 5.
[0082]
[0083] Finally, Figure 6 shows how the nozzles (8) are fixed on the tube sections (1), by gluing.
[0084]
[0085] Obtaining at the end a pool made of resin and polyester that has all the conduits and pipes integrated in the pool's own glass, ensuring the impossibility of any type of loss at the contact point itself, leaving the outputs of the installation of pipes and pipes to the filtration equipment.
[0086]
[0087] Described sufficiently the nature of the present invention, as well as the way of putting it into practice, it is stated that, within its essentiality, it can be brought to the practice in other embodiments that differ in detail from that indicated by way of example, and which will also achieve the protection sought, provided that it does not alter, change or modify its fundamental principle.
权利要求:
Claims (4)
[1]
1. - Polyester pool with integrated pipes characterized in that it comprises a vessel formed by a series of layers of resin and polyester that has on its walls in a transversal way a series of sections of tubes (1) arranged integrally with the series of layers of resin, and also has ducts or pipes (5) that run and are attached to the exterior walls of the pool vessel and go from the sections of tubes (1) integrated in the walls of the pool to one end to connection to the pool equipment, said ducts or pipes being covered by at least one layer of resin and polyester that is also part of the pool vessel.
[2]
2. - Polyester pool with integrated pipes according to claim 1 characterized in that the tube sections have a length of 5cm and a diameter of 50 mm.
[3]
3. - Method of manufacturing a polyester pool with integrated pipes according to any of the two previous claims characterized in that it comprises the steps of:
- Arrangement and fixing of sections of PCV pipes on top of the manufacturing mold in the position where the nozzles will go.
- Painted mold and tube sections with a paint based on unsaturated polyester and styrene (gelcoat ®).
- Drying of applied paint
- Application of layers of resin and polyester in the absence of at least one layer of resin and polyester, also applying resin and polyester in the tubes that have been put. - Making the hydraulic connections with PVC pipe with the sections of pipes integrated in the structure of the pool, with the pipes or pipes on one side of the pool all together.
- Application of the last layer of resin and polyester to the entire pool and to the pipes and pipes placed at the end, leaving the vessel and hydraulic pipes or pipes all integrated in a unique structure.
- Pool demolding.
[4]
4. - Method of manufacturing a polyester pool with integrated pipes according to claim 3, characterized in that the pipe sections (1) are 5 cm long and 50 mm in diameter.
类似技术:
公开号 | 公开日 | 专利标题
ES2300774T3|2008-06-16|TRANSPORT TUBE FOR THICK MATERIALS.
ES2371550T3|2012-01-05|DEVICE AND METHOD FOR REPAIRING PIPES USING HYDROPHYTIC OBTURATIONS.
ES2346120B1|2011-06-24|APPLIANCE AND METHOD FOR IDENTIFICATION OF SIDE PIPES.
ES2212567T3|2004-07-16|APPARATUS AND PROCEDURE TO PREPARE A SIDE PIPE AND ITS UNION WITH THE MAIN LINE OF SEWER.
ES2549103T3|2015-10-23|Inner lining tube, sanitized pressure tube and procedure for cleaning a pressure tube
ES2755180T3|2020-04-21|Reinforced concrete pipe
ES2822164T3|2021-04-29|Pressure Infusion Coating System
KR200370172Y1|2004-12-14|pipe repair unit
ES2724911B2|2020-02-19|MANUFACTURING PROCEDURE OF A POLYESTER POOL WITH INTEGRATED PIPES
ES2769405T3|2020-06-25|Method and system for the isolation of reinforced pipes
KR100697718B1|2007-03-21|Repairing apparatus of non-excavation type for sewer pipe using PVC tube and methods of the same
ES2511645T3|2014-10-23|Device for the control and sealing of pipe joints and a procedure for its use
ES2795062T3|2020-11-20|Device for connecting a drain to an outlet pipe
ES2540762T3|2015-07-13|Catheter structure
ES2362245T3|2011-06-30|MILK AND ELEVATION INJECTION TUBE.
ES2621655T3|2017-07-04|Method to support and reinforce an excavation with an arch
RU2600962C2|2016-10-27|Wheel chamber
KR100621639B1|2006-09-13|Repair, reinforcement method of manhole using glass-fiber reinforced plastics
ES2733541T3|2019-11-29|Floating technical hollow body and manufacturing procedure
ES2427351T3|2013-10-30|Spacer for a reinforcement element of a reinforced concrete component, in particular a reinforced concrete roof
ES2280296T3|2007-09-16|FLEXIBLE MATERIAL TUBE.
ES2843102T3|2021-07-15|A pig for use in a duct lining system
ES2610982T3|2017-05-04|Production method of a pressure-resistant hose and splice assembly
ES2550702T3|2015-11-11|Irrigation pipe
ES2208392T3|2004-06-16|LARGE VOLUME CONTAINER TO STAY LIQUID MEDIA.
同族专利:
公开号 | 公开日
ES2724911B2|2020-02-19|
FR3078988B1|2021-10-22|
FR3078988A1|2019-09-20|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题
AU4176478A|1977-12-07|1979-06-14|Western Bridge Constructions Pty. Limited|Precast pool|
US20020192028A1|2001-06-18|2002-12-19|Raymond Carston|Composite pond apparatus|
DE20306650U1|2003-04-28|2003-10-23|Uentz Marko|Garden water feature and aerator is made from glass fiber, and has an outer housing section with a filter container that has a strengthener between the water bath|
US20050198731A1|2004-03-12|2005-09-15|Turpen Courtney W.|Spa insert with flat upper flange and integral spill way|
FR3041672A1|2015-09-24|2017-03-31|Florent Necco|PLASTIC SWIMMING POOL HULL WITH REINFORCING ELEMENTS|
法律状态:
2019-09-17| BA2A| Patent application published|Ref document number: 2724911 Country of ref document: ES Kind code of ref document: A1 Effective date: 20190917 |
2020-02-19| FG2A| Definitive protection|Ref document number: 2724911 Country of ref document: ES Kind code of ref document: B2 Effective date: 20200219 |
优先权:
申请号 | 申请日 | 专利标题
ES201830246A|ES2724911B2|2018-03-13|2018-03-13|MANUFACTURING PROCEDURE OF A POLYESTER POOL WITH INTEGRATED PIPES|ES201830246A| ES2724911B2|2018-03-13|2018-03-13|MANUFACTURING PROCEDURE OF A POLYESTER POOL WITH INTEGRATED PIPES|
FR1853232A| FR3078988B1|2018-03-13|2018-04-13|POLYESTER POOL WITH INTEGRATED PIPES AND MANUFACTURING PROCESS|