专利摘要:
System and positioning device for hydraulic installations in a wall. A positioning system that is intended to hold and maintain a provisional stable positioning of hydraulic installations (5a, 5b) to which afterwards taps, drains and other accessories will be connected; so that the system of the invention allows to test hydraulic installations by introducing a pressurized fluid before they are permanently fixed to the wall (4). The system of the invention also makes it possible to accurately mark on the wall, in an initial phase, some initial reference lines (14a, 14b) according to the locations of the taps and drains. The system of the invention also allows to mark reference lines (12) to make a few chases (4') on the wall (4); wherein said chases (4') are configured to mount the hydraulic installations (5a, 5b). The system comprises at least one positioning device (26). (Machine-translation by Google Translate, not legally binding)
公开号:ES2697061A1
申请号:ES201730952
申请日:2017-07-21
公开日:2019-01-21
发明作者:Ingles Roman Mas
申请人:Tor Mans S L;
IPC主号:
专利说明:

[0001]
[0002] Object of the invention
[0003] The present invention relates to a system and positioning device for hydraulic installations in a wall; where the positioning system is intended to temporarily hold and maintain a stable positioning of hydraulic installations to which afterwards taps, drains and other accessories will be connected; so that the system of the invention allows to test the hydraulic installations by introducing a fluid under pressure before finally fixing them to the wall.
[0004]
[0005] On the other hand, the positioning device of the invention allows to mark accurately on the wall, in an initial phase, initial reference lines according to the locations of the taps and drains. With the positioning device you can also mark some reference lines to make a few rozas on the wall; where said chases are configured to mount the hydraulic installations.
[0006]
[0007] Technical problem to solve and background of the invention
[0008] Nowadays, when a hydraulic installation is carried out in a bathroom or kitchen, for example, it is first necessary to make a few chasms on the walls to fit in them some pipes and other elements that are part of said hydraulic installation, so that when not no positioning system is used, as the installation is mounted it is necessary to fasten the pipes by cement, plaster or other means. In this situation, once the hydraulic installation has been assembled, accessories are then mounted, such as, for example, taps and drains, on the outlets of the hydraulic installation.
[0009]
[0010] This described form of assembly generates problems of mismatches and inaccuracies at the time of mounting after the accessories, so that it is easy to make mistakes in the positioning of the outlet mouthpieces of the hydraulic installation, and obviously the subsequent positioning of the accessories will also be wrong.
[0011] The utility model with application no. In Spain U 9300041 describes a positioning device for installations in outlet outlets in hydraulic works installations comprising a central tubular body located vertically and spaced from the floor by means of a tubular element with height adjustment ; said central tubular body carrying on its head a transverse rod intended to support at least two pairs of locating and supporting elements of the outlet mouthpieces.
[0012]
[0013] The device described in the previous paragraph does not allow the hydraulic installation to be held in order to check if it is correctly positioned and it is not possible to test the hydraulic installation by introducing a fluid under pressure to check its tightness.
[0014]
[0015] The utility model with application number in Spain U 9300042 describes a template for the layout of races that also does not allow to hold the hydraulic installation to be able to check if it is correctly positioned and does not allow to test the hydraulic installation by introducing a pressurized fluid to check its tightness
[0016]
[0017] In all cases, it is not possible to temporarily and demountably fasten the hydraulic system to check its correct positioning and to check the tightness, so that this sealing is done by introducing the liquid fluid under pressure, after having fixed the installation with cement, plaster or similar; with which if there are leaks in the hydraulic installation it will be necessary to eliminate said cement or plaster and to disassemble the hydraulic installation.
[0018]
[0019] Description of the invention
[0020] In order to achieve the objectives and avoid the drawbacks mentioned in the previous sections, the invention proposes a positioning system and device for hydraulic installations in a facing.
[0021]
[0022] The positioning device comprises a main support including at least two first through holes; at least a second through hole located between the first through holes, and at least two through holes adjacent to the first through holes.
[0023] A few centers of the through holes are located in correspondence with a reference alignment that is parallel to another additional alignment in correspondence with which at least some centers of the first through holes are located.
[0024]
[0025] The distance between the centers of the pair of through holes is the same as the distance between the centers of the pair of first through holes.
[0026]
[0027] The main support is configured in principle to hold and position a hydraulic installation through which a liquid fluid circulates.
[0028]
[0029] The main support comprises:
[0030] - extreme notches located in correspondence with the reference alignment in which they find the centers of the through holes.
[0031] - a central notch which is contained in a direction centered equidistant from the centers of the through holes and the centers of the first through holes; where the end notches and the central notch are configured to position the main support on the face.
[0032]
[0033] The main support also comprises through grooves configured to be able to draw reference lines on the wall in accordance with chases in which at least one hydraulic installation is housed.
[0034]
[0035] The positioning device also comprises an additional support which is fixed to a central main support part; wherein said additional support is configured to hold and position a hydraulic drain installation.
[0036]
[0037] The additional support includes an end through hole that is configured to introduce therein the anchoring element that is encased on the mouth of the hydraulic drain installation; wherein said anchoring element is configured to hold and position said hydraulic drain installation.
[0038]
[0039] The additional support of the positioning device comprises a flange configured to fit into a recess of the main support; wherein said additional support is fixed immovably to the main support by means of an anchoring device.
[0040] The anchoring device for fixing the additional support to the main support comprises a nut and a screw that passes through a first hole of the main support and through a third hole of the additional support.
[0041]
[0042] The additional support comprises a first end portion that includes the flange; a second end part including the extreme through hole and an intermediate part including the third hole; where the intermediate part rests on an angular extension of the main support that includes the first hole.
[0043]
[0044] The positioning system for hydraulic installations in a wall comprises at least one positioning device that includes the main support, at least two fixing supports and at least one anchoring element configured to fix said hydraulic installation to the main support; wherein the main support is configured to engage the fixing brackets when fixed on the facing; and where the anchoring element is coupled to a mouth of a hydraulic installation.
[0045]
[0046] The first through holes of the main support are configured to fit a part of the fixing supports thereon; while the second through hole is configured to introduce the anchoring element.
[0047]
[0048] The positioning system also comprises a first initial reference line drawn on the wall and in which reference points are marked (coinciding with the centers of the through holes of the main support.
[0049]
[0050] The end notches of the main support are configured to coincide with the first initial reference line drawn on the face; while the central notch is configured to center said main support on the facing in coincidence with a second initial reference line drawn on the facing.
[0051]
[0052] The fixation brackets include stops configured to provide support to the main support when coupled to the fixation brackets; and wherein said stops are configured to maintain the main support in a plane parallel to the face; where the main support is coupled to threaded tubular rods of the supports fixing by means of nuts; and where the stops are located in correspondence with the threaded tubular rods.
[0053]
[0054] The stops of the fixing supports comprise nuts coupled to the threaded tubular rods of the fixing supports; where the stops can be positioned along the threaded tubular rods to be able to vary the distance between the main support and the facing.
[0055]
[0056] The fixing supports comprise central perforations coinciding with the reference points of the first initial reference line drawn on the facing; where the distance between said reference points is the same distance as that between the centers of the central perforations of the fixing supports when they are fixed to the wall.
[0057]
[0058] The central perforations of the fixing supports are located in areas centered with respect to the threaded tubular rods of said fixing supports.
[0059]
[0060] The positioning system of the invention is used for the marking of the chases on the wall, and is also used to determine the precise positioning of the hydraulic installations and therefore the precise positioning of general keys of passage or other accessories and of the mouthpieces. of said hydraulic installations.
[0061]
[0062] Below, in order to facilitate a better understanding of this descriptive specification and forming an integral part thereof, a series of figures are attached in which the object of the invention has been represented with an illustrative and non-limiting character.
[0063]
[0064] Brief description of the figures
[0065] Figure 1 shows a perspective view of the system and positioning device for hydraulic installations in a wall, object of the invention. The system comprises at least one positioning device for temporarily holding a hydraulic installation.
[0066] Figure 2.- Shows another perspective view of the positioning system of the invention.
[0067] Figure 3.- Shows a front view of a wall with chasms where the hydraulic installations are located, which are provisionally fastened by the system of the invention.
[0068] Figure 4 shows a plan view of a main support that forms part of the system and positioning device of the invention.
[0069] Figure 5a.- Shows a plan view of an additional support configured to be coupled to the main support.
[0070] Figure 5b.- Shows a profile view of the additional support.
[0071] Figure 6.- Shows a profile view of the main support.
[0072] Figure 7.- Shows a plan view of a fixing support in which the main support is coupled.
[0073] Figure 7a.- Shows a sectional view according to section A-B of figure 7.
[0074] Figure 8.- Represents a front view of a wall where the application of the positioning system is shown on a first lower installation of a liquid fluid that corresponds to a tap with two water intakes, a second lower drainage installation; and a superior installation of a liquid fluid that corresponds to two other water inlets where two stopcocks are installed for cold water and hot water.
[0075] Figure 9.- Represents a view of a wall on which an initial reference line and other reference elements that are marked through the main support have been marked.
[0076] Figure 10.- Represents a view of a wall on which the main support is placed, taking as reference the initial reference line and points that are part of said initial reference line.
[0077]
[0078] Description of an embodiment of the invention
[0079] Considering the numbering adopted in the figures, the positioning system for hydraulic installations 5a, 5b in a facing 4 comprises at least one positioning device 26 and two fixing support 2; wherein in one embodiment of the invention the positioning device 26 comprises a main support 1; and in another embodiment the positioning device 26 comprises the main support 1 and an additional support 3.
[0080]
[0081] The main support 1 is configured to be coupled to two fixing supports 2 that have been previously fixed on the wall 4 which includes chambers 4 'in which the hydraulic installations are housed: installations 5a comprising pipes through which water flows or another liquid fluid, and other installations 5b comprising drain pipes.
[0082]
[0083] The hydraulic installations 5a with water include mouths 6a configured to connect two taps of a tap or stopcocks for example; while each hydraulic installation 5b of drainage includes a mouth 6b configured to connect a drain of a sanitary appliance; all this after having assembled and correctly positioned the hydraulic installations (5a, 5b) by means of the system of the invention.
[0084]
[0085] When the hydraulic installation 5b of the drain is mounted, in addition to the main support 1 and the fixing supports 2, the additional support 3 is used to hold and position said hydraulic installation 5b of the drain; wherein in this embodiment of the invention said additional support 3 is connected to the main support 1 as will be described later.
[0086]
[0087] The main support 1 comprises through grooves 7; first through holes 8, second through holes 9, through holes 10 adjacent to the first through holes 8 and end notches 11a. The main support 1 also includes a central notch 11b for centering said main support 1.
[0088]
[0089] The end grooves 11a and the centers of the through holes 10 are located in a reference alignment 10a parallel to an additional alignment 8a in which the centers of the first through holes 8 of the main support 1 are located; where the centers of each pair of through hole 10 and first through hole 8 are arranged in the same vertical direction when the main support 1 is fixed on the face 4 as shown in the embodiment shown in the figures. The centers of the second through holes 9 are also located in the additional alignment 8a in which the first through holes 8 are also located.
[0090]
[0091] The through perforations 10 of the main support 1 are used to mark reference points 13 arranged on a first horizontal reference line 14a which has been previously drawn and drawn on the facing 4 according to the location of a tap, for example, that you want to ride.
[0092] A second initial reference line 14b is also previously drawn on the wall 4 in order to accurately center the main support 1; wherein said second reference line 14b is perpendicular to the first reference line 14a.
[0093]
[0094] The end grooves 11a and the central groove 11b are used to position the main support 1 resting it on the face 4 by matching the end grooves 11a with the first initial reference line 14a and matching the central groove 11b with the second initial reference line 14b; all this in order to be able to mark the reference points 13 also on said first initial reference line 14a.
[0095]
[0096] The through grooves 7 of the main support 1 are used to mark on the facing 4 reference lines 12 which are then extended in elongated lines 12 'in order to be able to realize the chases 4' on said facing 4; wherein said reference lines 12 are marked when the main support 1 is supported on the facing 4 correctly positioned as described in the previous paragraph.
[0097]
[0098] The first through holes 8 of the main support 1 are used to be able to couple said main support 1 on the fixing supports 2; wherein said fixing supports 2 are previously fixed to the wall 4 taking reference points 13 as reference.
[0099]
[0100] Each fixing support 2 comprises a base 2a, a threaded tubular rod 2b and an adjustable stop 2c connected to the threaded tubular rod 2b; wherein said base 2a includes a front perforation 15 which faces the respective reference point 13 when the base 2a of the fixing support 2 rests on the facing 4.
[0101]
[0102] Said base 2a includes end bores 16 through which screws passing through tabs previously installed in holes in the wall pass to ensure the positioning and fixing of each of the fixing supports 2. It is also possible to fix them. fixing brackets 2 to the wall 4 by means of other screws passing through the front holes 15 of said fixing brackets 2.
[0103]
[0104] The second through holes 9 of the main support 1 are used to position the mouths 6a of the hydraulic water installations 5a; where once the main support 1 is mounted said mouths 6a are facing the second holes interns 9 of the main support 1.
[0105]
[0106] Thus, once the fixing brackets 2 are fixed on the wall 4, the main support 1 is coupled to the two supports 2, making the first through holes 8 of the main support 1 coincide on the threaded tubular rods 2b of the fixing support 2 until the main support 1 abuts the stops 2c of the fastening brackets 2. Next, in order to immobilize the main support 1, lateral nuts 17 are coupled on end sections of the threaded tubular rods 2b.
[0107]
[0108] In a later phase, in order to immobilize the hydraulic water installations 5a, anchoring elements 18a are provided, which are fitted on the mouths 6a of said hydraulic water installations 5a; wherein said anchoring elements 18a comprise bolts in the manner of plugs, whose threaded rods pass through the second through holes 9 of the main support 1.
[0109]
[0110] The additional support 3 includes an end through hole 19 which is configured to introduce therein an anchoring element 18b (provisional tube) that fits over the opening 6b of the hydraulic installation 5b of the drain; all this to immobilize said hydraulic installation 5b of drainage when the additional support 3 is fixed to the main support 1.
[0111]
[0112] The additional support 3 has a flange 20 configured to fit into a recess 21 of the main support 1; wherein said additional support 3 is fixed to the main support 1 immovably by means of an anchoring device, such as for example a nut 21 and a screw 22 that passes through a first hole 23 of the main support 1 and through a third hole 24 of additional support 3.
[0113]
[0114] The central groove 11b of the main support 1 is located in correspondence with a centered direction 25 equidistantly of the centers of the two through holes 10 and of the centers of the first two through holes 8 of the main support 1.
[0115]
[0116] The additional support 3 comprises a first end part 3a including the flange 20; a second end part 3b including the end through hole 19 and an intermediate part 3c including the third hole 24; where the intermediate part 3c supports on an angular extension 1b of the main support 1 including first hole 23.
[0117]
[0118] The system of the invention allows to position the hydraulic installation 5a, 5b to the required depth within the chases 4 'of the facing 4 by the stops 2b of the fixing supports 2.
[0119]
[0120] On the other hand, it is also possible to check the tightness of the hydraulic water installation 5a by previously closing its mouths 6a by means of the anchoring elements 18a; Where necessary, annular sealing gaskets would be included to achieve a closure while closing said mouths 6a of the hydraulic water installation 5a.
[0121]
[0122] The main support 1 includes at least a first through hole 8, at least a second through hole 9 and at least one through hole 10; although normally said main support 1 comprises at least two through holes 8, at least a second through hole 9 and two through holes 10; achieving in this way a precise positioning with better stability and support of the main support 1.
[0123]
[0124] The assembly of a positioning device 26 is carried out in the following manner.
[0125]
[0126] Once the first horizontal reference lines 14a and the second vertical reference lines 14b are marked on the wall 4 according to the location of taps and toilets, the multifunctional positioning device 26 is taken and the marking lines are marked 12 to delimit the location of the chases 4 ', as well as the reference points 13 (coinciding with the centers of the through holes 10 of the main support 1) for the subsequent precise fixing of the fixing supports 2 on the wall 4; all this by previously placing the main support 1 supporting it on the facing 4 by matching the end notches 11a and central notch 11b of the main support 1 with the first initial reference line 14a and the second initial reference line 14b, respectively.
[0127]
[0128] Then, on the reference points 13 of the wall 4 perforations are made with a drill bit to then insert studs and be able to position / fix the two fixing supports 2 with screws that will thread in said inserted studs; where said screws are introduced through the hollows of the tubular stems threaded 2b of said fixing supports 2. These fixing supports 2 also include the end perforations 16 to also fasten the fixing supports 2 on the facing through other screws.
[0129]
[0130] Once the fixing brackets 2 are fixed on the wall 4, the adjustable stops 2c are placed on the threaded rods 2b according to the expected separation required from the main support 1 with respect to the wall 4. The main support is then attached 1 on the fixing supports 2 by fitting the threaded rods 2b in the first through holes 8 of the main support 1 until it contacts the adjustable stops 2c and finally the fixing of the main support 1 is secured by the side nuts 17 which screw in end sections of said threaded tubular rods 2b of the fixing brackets 2.
[0131]
[0132] In a later phase, the anchoring elements 18a are coupled as plugs that thread on the threaded holes 6a of the hydraulic water installation 5a introducing them through the second through holes 9 of the main support 1, with the possibility of including joints to achieve sealing in the closing of said mouths 6a.
[0133]
[0134] To carry out the fixation and positioning of the hydraulic installation 5b of the drainage system, the additional support 3 is assembled as previously mentioned, introducing the anchoring element 18b materialized by a tubular body, which is introduced through the extreme through hole 19 of said additional support 3 and finally one end of said anchoring element 18b is encased inside the mouth 6b of the hydraulic installation 5b of the drain.
权利要求:
Claims (14)
[1]
1. - Positioning device for hydraulic installations in a wall, characterized in that it comprises a main support (1) including at least two first through holes (8); at least a second through hole (9) located between the first through holes (8), and at least two through holes (10) adjacent to the first through holes (8);
where centers of the through holes (10) are located in correspondence with a reference alignment (10a) which is parallel to another additional alignment (8a) in correspondence with which at least some centers of the first through-holes are located (8) );
where the distance between the centers of the pair of through holes (10) is the same as the distance between the centers of the pair of first through holes (8), and where the main support (1) is configured to hold and position an installation hydraulic (5a) of a liquid fluid.
[2]
2. - Positioning device for hydraulic installations in a facing, according to claim 1, characterized in that the main support (1) comprises:
- extreme notches (11a) located in correspondence with the reference alignment (10a) in which the centers of the through holes (10) are located; - a central groove (11b) that is contained in a centered direction (25) equidistant from the centers of the through holes (10) and the centers of the first through holes (8);
where the end notches (11a) and the central notch (11b) are configured to position the main support (1) on the facing (4).
[3]
3. - positioning device for hydraulic installations in a wall, according to any one of the preceding claims, characterized in that the main support (1) comprises through grooves (7) configured to draw reference lines (12) on the facing (4) according to some chases (4 ') in which at least one hydraulic installation (5a) is housed.
[4]
4. - Positioning device for hydraulic installations in a facing, according to any one of the preceding claims, characterized in that it comprises an additional support (3) that is fixed to a central main support part (1); wherein said additional support (3) is configured to hold and position a hydraulic installation (5b) of drainage.
[5]
5. - Positioning device for hydraulic installations in a facing, according to claim 4, characterized in that the additional support (3) includes an end through hole (19) which is configured to introduce the anchoring element (18b) therein. that fits into the mouthpiece (6b) of the hydraulic installation (5b) of the drain; wherein said anchoring element (18b) is configured to hold and position said hydraulic installation (5b) of drainage.
[6]
6. - Positioning device for hydraulic installations in a facing, according to claim 9, characterized in that the additional support (3) comprises a flange (20) configured to fit in a recess (21) of the main support (1); wherein said additional support (3) is fixed immovably to the main support (1) by means of an anchoring device.
[7]
7. - Positioning device for hydraulic installations in a facing, according to claim 6, characterized in that the anchoring device for fixing the additional support (3) to the main support (1) comprises a nut (21) and a screw (22). ) that passes through a first hole (23) of the main support (1) and through a third hole (24) of the additional support (3).
[8]
8. - Positioning device for hydraulic installations in a facing, according to claim 7, characterized in that the additional support (3) comprises a first end part (3a) that includes the flange (20); a second end part (3b) including the end through hole (19) and an intermediate part (3c) including the third hole (24); where the intermediate part (3c) rests on an angular extension (1b) of the main support (1) that includes the first hole (23).
[9]
9. - Positioning system for hydraulic installations in a wall, according to the preceding claims, characterized in that:
- comprises at least one positioning device (26) including the main support (1), at least two fixing supports (2) and at least one anchoring element (18a) configured to fix said hydraulic installation (5a) to the support main (1); where the main support (1) is configured to be attached to the fixing brackets (2) when they are fixed on the facing (4); and wherein the anchoring element (18a) is coupled to a mouthpiece (6a) of a hydraulic installation (5a);
- the first through holes (8) of the main support (1) are configured to fit a part of the fixing supports (2) thereon; whereas the second through hole (9) is configured to introduce the anchoring element (18a);
[10]
10. - Positioning system for hydraulic installations in a wall, according to claim 9, characterized in that:
- comprises a first initial reference line (14a) drawn on the wall (4) and in which reference points (13) are marked in coincidence of the centers of the through holes (10) of the main support (1);
- the end notches (11a) of the main support (1) are configured to coincide with the first initial reference line (14a) drawn on the facing (4); - the central notch (11b) is configured to center said main support (1) on the facing (4) in coincidence with a second initial reference line (14b) drawn on the facing (4).
[11]
11. - Positioning system for hydraulic installations in a facing, according to any of the preceding claims 9 or 10, characterized in that the fixing supports (2) include stops (2c) configured to provide support to the main support (1) when coupled to the fixing brackets (2); and wherein said stops (2c) are configured to maintain the main support (1) in a plane parallel to the wall (4); wherein the main support (1) is coupled to threaded tubular rods (2b) of the fixing supports (2) by means of nuts (17); and where the stops (2c) are located in correspondence with the threaded tubular rods (2b).
[12]
12. - Positioning system for hydraulic installations in a facing, according to claim 11, characterized in that the stops (2c) comprise nuts coupled to the threaded tubular rods (2b) of the fixing supports (2); where the stops (2c) can be positioned along the threaded tubular rods (2b) to be able to vary the distance between the main support (1) and the facing (4).
[13]
13. - Positioning system for hydraulic installations in a facing, according to claim 9, characterized in that the fixing supports (2) comprise central perforations (15) coinciding with the reference points (13) of the first initial reference line (14a) drawn on the facing (4); where the distance between said reference points (13) is the same distance as that between the centers of the central perforations (15) of the fixing supports (2) when they are fixed to the facing (4) ..
[14]
14. Positioning system for hydraulic installations in a wall, according to claim 13, characterized in that the central perforations (15) of the fixing supports (2) are located in areas centered with respect to the threaded tubular rods (2b) ) of said fixing supports (2).
类似技术:
公开号 | 公开日 | 专利标题
ES2224531T3|2005-03-01|BASE PLATE FOR CONSTRUCTION OF DEVICES FOR SUBJECTION OF PARTS.
BR112019021328A2|2020-06-16|SINGLE-TRAVEL MULTIZONE COMPLETION SYSTEM
ES2697061A1|2019-01-21|SYSTEM AND POSITIONING DEVICE FOR HYDRAULIC INSTALLATIONS IN A PARAMENTO |
AU2012261749B2|2016-11-03|Plumbing Path Guide Apparatus
ES2726736T3|2019-10-08|System for attaching a heating body to a wall
ES2469165T3|2014-06-17|Structure to support a sanitary appliance
EP1956153A1|2008-08-13|Sewer and rainwater drainage gully element
ES1269049U|2021-06-01|UNIVERSAL QUICK CONNECTION KIT FOR MOUNTING A TAP ON A BATTERY WITH A THROUGH HOLE |
WO1994016174A1|1994-07-21|Positioning device for water outlets in hydraulyc installations of building constructions
ES2863948T3|2021-10-13|Vertical tap water distribution device
ES2327242T3|2009-10-27|CONNECTION DEVICE FOR A WALL HEATING DEVICE.
ES1240459U|2020-02-03|Plumbing clamp for pipes with a multi-position system |
ES1274689U|2021-07-22|CONNECTOR DEVICE FOR FLUID CONDUCTION INSTALLATIONS |
ES1100207Y2|2020-11-12|Feed valve
CN211714625U|2020-10-20|Through-floor sleeve positioning device
GB2536874A|2016-10-05|A plumbing measurement device
US10801635B2|2020-10-13|Fixing structure for protective cover of valve assembly
ES2798133T3|2020-12-09|Distributor for a plate heat exchanger
BRPI1100113A2|2012-04-10|bath column
ES2342863B1|2011-05-03|SANITATION SYSTEM.
BR102017024516A2|2019-06-04|BASE FIXER OF SANITARY VESSEL
ES2309114T3|2008-12-16|SUPPORT DEVICE FOR INSTALLATION ELEMENTS.
ES2433112A1|2013-12-09|Orthogonal rule for positioning the supports of a hot-water heating radiator
KR930003712Y1|1993-06-21|Mixing valve clamp for cold water and hot water
ES1132605U|2014-11-11|Support for mounting water meters |
同族专利:
公开号 | 公开日
EP3431671A1|2019-01-23|
ES2697061B2|2020-03-20|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题
ES1023432U|1993-01-12|1993-07-01|Mas Ingles Roman|Template for the lay-out of raglets in hydraulic installations of building constructions|
EP0733745A2|1995-03-24|1996-09-25|Friatec Aktiengesellschaft Keramik- und Kunststoffwerke|Fixation device with installation element|
FR3017922A1|2014-02-25|2015-08-28|Comap|SYSTEM FOR CONNECTING A FAUCET ON A WALL|
ES1135619U|2014-12-30|2015-01-28|Caspro, S.A.|Device for fixing and leveling sanitary fittings on walls |
GB2536778A|2015-01-30|2016-09-28|Cassellie Ltd|Fluid device fixing apparatus and method of use thereof|
DE8914496U1|1989-07-13|1990-01-25|Geberit Ag, Jona, St.Gallen, Ch|
DE20016318U1|2000-09-19|2001-03-01|Ilgner Peter|Borehole template for cladding panels of sanitary modules|
US20100219310A1|2009-02-20|2010-09-02|Max Stephen Rose|Plumbing fixture mounting bracket assembly|
法律状态:
2019-01-21| BA2A| Patent application published|Ref document number: 2697061 Country of ref document: ES Kind code of ref document: A1 Effective date: 20190121 |
2020-03-20| FG2A| Definitive protection|Ref document number: 2697061 Country of ref document: ES Kind code of ref document: B2 Effective date: 20200320 |
优先权:
申请号 | 申请日 | 专利标题
ES201730952A|ES2697061B2|2017-07-21|2017-07-21|POSITIONING DEVICE, SYSTEM AND PROCEDURE FOR HYDRAULIC INSTALLATIONS IN A PARAMENT|ES201730952A| ES2697061B2|2017-07-21|2017-07-21|POSITIONING DEVICE, SYSTEM AND PROCEDURE FOR HYDRAULIC INSTALLATIONS IN A PARAMENT|
EP18183049.8A| EP3431671A1|2017-07-21|2018-07-12|Positioning device and system for plumbing installations in a wall|
[返回顶部]