专利摘要:
Reinforced concrete flooring of reduced thickness. The invention provides a pavement (11) formed by a set of concrete slabs (13) of a thickness H in which each of said slabs (13) comprises a plurality of surface slits (15, 17) of a height H3 delimiting sub-slabs (21) and, as reinforcement, a set of tying bars (25, 27; 26, 28) of the adjacent sub-slabs (21), on both sides of said surface slits (15, 17), which they are arranged under them at a distance H2. (Machine-translation by Google Translate, not legally binding)
公开号:ES2693419A1
申请号:ES201700625
申请日:2017-06-08
公开日:2018-12-11
发明作者:Jose Ramón VÁZQUEZ RUIZ DEL ÁRBOL
申请人:Jose Ramón VÁZQUEZ RUIZ DEL ÁRBOL;
IPC主号:
专利说明:

DESCRIPTION

Reinforced concrete pavement of reduced thickness.

Field of the invention 5

The present invention relates to a reinforced concrete pavement of reduced thickness.

The invention is applicable to linear and surface works such as roads, highways, concrete esplanades, etc. 10

Background of the invention

Reinforced concrete floors are placed in neutral fiber reinforcements to join the elements resulting from the cracks that occur in it. Longitudinal amounts of steel 15, of the order of 0.6% to 0.7% of the concrete section, achieve a tensile strength of steel greater than that of concrete in the sections perpendicular to the axis of the road and does not break the steel and concrete cracks. It is a great cost of steel and a difficulty in the execution of the pavement.
 twenty
The metal mesh used in warehouses at the top of the pavement, aims to avoid retraction joints and also allow concrete without joints. It also requires the use of reinforcements throughout the pavement as a way to control the retraction of concrete and cracks caused by loads.
 25
Among the drawbacks of known reinforced concrete pavements, its high cost stands out.

The present invention is directed to the solution of that inconvenience.
 30
Summary of the invention

The invention provides a pavement formed by a set of concrete slabs (of a surface, preferably between 2x2 m2 and 25 * 25 m2) of a thickness H (preferably between 6-80 cm) in which each of said slabs comprises a plurality of surface grooves (preferably parallel to the slab edges) of a height H3 delimiting sub-slabs (of a surface preferably between 0.4x0.4 m2 and 5 * 5 m2) and, as reinforcement a set of tie rods of adjacent sub-slabs on both sides of said surface grooves.
 40
Preferably, the sum of H2 and H3 should be less than H / 2.

In one embodiment the tie rods are perpendicular to the surface grooves. For constructive reasons, the set of tie rods between two sub-slabs includes secondary tie bars so that it is mesh-shaped. Four. Five

In another embodiment, the tie rods have an appropriate shape to be located alternately on one side and another of the surface grooves and arranged below them at a distance H2. The length of these tie rods can be between 1.5 and 5 times the length of the surface grooves. fifty

Preferably the tie bars are corrugated stainless steel bars with a diameter between 2-10 mm.

Thus, in its upper part, the cross sections of the pavement are weakened on the one hand, and reinforced on the other to cancel in them the positive bending moments (tractions below and compressions above). In this way, with the passage of time, in each of the initial slabs of the pavement, smaller sub-slabs locked together will form.
 5
This structuring of pavement allows to reduce in an efficient way the tensile stresses of concrete pavements to enable greater durability, a reduction in the thickness of the slabs, an increase in the dimensions in plan of the slabs (with the consequent decrease in number of retraction joints) and a larger floor area for the distribution of vertical pressures. 10

Positive bending moments are reduced under the load on the initial slabs under the load due to the decrease in the size of the sub-slabs. These moments are canceled in the unloaded sub-slabs. The efficient transmission of loads to the adjacent slabs helps the distribution to the ground through the slabs near the loaded slab. fifteen

That is, in the initial slab, the negative bending moment is transmitted (tractions above and compressions below), which is a favorable bending moment. The positive bending moment, which is unfavorable, becomes zero from the edges of the loaded out-slab.
 twenty
The tractions in the lower fibers are those that break the pavement, therefore, it is considered favorable tractions above, because it implies compressions below that reduce magnitude to the tractions existing under the load in the inferior fibers.

The negative bending moments are smaller than the positive ones, once the sub-slabs are created.

By combining the present invention with the possibility of permanently connecting slabs with load transfer, we can obtain a pavement consisting of sub-slabs of smaller thickness and greater durability. 30

Another consequence is to be able to increase the contact surface with the support ground, allowing floors with lower support capacity.

Other consequences are being able to reduce the reinforcements of reinforced slabs or to design continuous concrete pavements differently.

Some sections of slabs are weakened by freshly executing surface vertical grooves or with subsequent cuts of the pavement. In these same places reinforcements are previously installed to sew both parts of the sections. An initial slab 40 will form cracks in said sections due to the bending moments that have tractions below and compressions above, because in said sections the thickness is smaller and the reinforcements are preferably at the top to optimize the amount to be used.

Inside the initial slabs, smaller sub-slabs joined by the 45 placed reinforcements will be formed. In those that have no charge the positive bending moments are zero and the negative moments are transmitted due to the armor.

The assembly can be discontinuous because it is known where the cracks are going to be produced and it is possible to sew because only the fissures, not the entire surface of the pavement. fifty

The surfaces on both sides of a rough fissure, formed by the aggregates of the concrete in contact, will transmit the load between small sub-slabs joined by the reinforcements and also the
bending moment when there are tractions in the upper part behaving like a section without fissure, in relation to the negative moments.

These bending moments can transmit compressions to the corresponding critical section (normally the one that contains the load or acting loads), decreasing its tensile tension in the lower fibers, in case of contact between the lower fibers of the sub-slab loaded with adjoining

The edges of the sub-slabs are ball joints with rotation between slabs in one of the directions. The tractions in the lower fibers of the unloaded slabs disappear. 10

The pavement requires, every certain distance, a transmission system that allows the initial slabs to expand and contract.

The design of the pavements requires smaller thicknesses for the same durability due to the decrease in stresses achieved by joining and weakening the pavement superiorly.

To use small amounts of steel, the initial slab length cannot be indefinite and joints are required. However, the width of the road, which is not a large width (of the order of 10 meters), can be made with a single initial slab. For an esplanade there must be 20 joints in both directions.

The critical tension for concrete is the tensile stress and the maximum tensile stress usually occurs under load and in the lower fiber. When the edges of the initial slab are rigidly or elastically supported on the edges of the adjacent slabs, the maximum tensile tension is always under the load, on the lower fiber and with the load in the center of the slab.

Other features and advantages of the present invention will be apparent from the following detailed description of illustrative embodiments of its object in relation to the accompanying figures.

Brief description of the figures

Figure 1 is a plan view of a pavement formed by two rows of slabs. 35

Figures 2a and 2b are schematic plan views of one of the pavement slabs according to the invention illustrating two embodiments of the tie rods.

Figure 3 is a partial schematic sectional view of a pavement slab with a surface vertical groove and a tie bar of the two sub-slabs that are generated on both sides of it.

Figure 4a is a diagram schematically showing the stress distribution of a positive bending moment in a section of a slab of height H with tractions down and 45 compressions above, due to a vertical load down.

Figure 4b is a diagram schematically showing the distribution of perpendicular stresses in an edge section of a sub-slab with a tie bar at a distance H2 from the bottom of a surface vertical groove of height H3 due to a load 50 tangent to one side of said slit.

Figure 4c is a diagram schematically showing the distribution of perpendicular stresses in an edge section of a sub-slab with a tie bar at a distance H1 from half of the slab of height H, due to a negative bending moment.

Figures 5a and 5b are diagrams showing the deformations in a section of a slab 5 according to the invention with the load acting in a groove and inside a sub-slab.

Figure 5c is a diagram similar to that of Figures 5a and 5b in a conventional slab, with the edges supported on the adjacent slabs, in which the existing inflection points and the distance or separation between them can be observed, giving Place at times 10 large positive beacons.

Detailed Description of the Invention

In a pavement 11 formed by slabs 13 connected to each other to transfer the 15-edge loads and allow horizontal expansion movements, it is possible to optimize their thickness with the consequent cost reduction and achieve greater durability by inducing the subdivision of each of them. in a plurality of sub-slabs 21 to obtain lower flexural tensile stresses therein by means of longitudinal grooves 15, 17 of a height H3 and tie rods 25, 27; 26, 28 arranged below them at a distance H2.

In this way, shear forces can be transmitted on a pavement in a lasting way, with aggregates on both sides of a fissure, without interposition of any element and without separation between said aggregates. 25

This fissure must have a zero width so that the aggregates of one of its sides rest on the aggregates of the other side. If there is slack the transfer will not be good because the support between aggregates is not horizontal and the system will not be durable.
 30
The objective of zero width of the fissure is achieved with said tie rods 25, 27; 26, 28 since in the concrete coinciding with its perimeter, which is adhered to them, there is no separation between aggregates, since those tie rods 25, 27; 26, 28 are not broken. That is, the zero width of the fissure between the lower and upper part of the tie rods 25, 27 is achieved; 26, 28. 35

The upper part has the roughness due to aggregates, since the fissure between the lower edge of the grooves 15, 17 and the tie rods 25, 27; 26, 28 is produced by traction of the upper part of the slabs 13. The fissure is braked because that traction is supported by the tie rods 25, 27; 26, 28. 40

Between the tie rods 25, 27; 26, 28 and the lower part of the slabs 13 the fissures caused by the loads due to the bending moments whose tractions begin at the bottom are formed. These fissures can break without contouring the aggregates producing a less roughness than those produced above the tie rods 25, 27; 26, 28. 45

Whereas the tie rods 25, 27; 26, 28 must “sew” the fissure at points that are on a horizontal line (parallel to the surface), so that the section can rotate in relation to said line, the points above, (between the tie bars 25, 27; 26, 28 and the bottom of the grooves 15, 17) will be compressed and the points below will cease to have contact and tensions, as seen in Fig. 4b.

On the other hand, the tie points of the tie rods 25, 27; 26, 28 should be close, not as is usually done on roads with distances of 1 meter between tie bars,
which can fulfill the assigned tying function of avoiding separation between slabs, but not with the binding that requires theoretical zero separation between aggregates in this invention to avoid dynamic friction between aggregates that would impair durability. The tied points separated from each other at a distance less than the height of the pavement are an indicative or adequate solution, the better the closer they are between them. 5

Preferably the situation of the tied points should be as high as possible because it is desired to transmit the bending moments with tractions above, the armor being needed as far away from the lower edge to withstand greater negative bending moments. A possible option is the placement of the armor with its upper part tangent to the lower part of the slit.

The load must be transferred to the greatest possible extension of the ground, forming a convex curvature on both sides of the sub-slabs 21 on which the load acts, as shown in Figs. 5a and 5b, by transmitting the negative bending moments. fifteen

For the correct execution of a floor 11 according to the invention, the tie bars 25, 27 must be sized; 26, 28 depending on the depth of the surface grooves 15, 17 and place them at the height H2 mentioned with respect to them.
 twenty
As for the surface grooves 15, 17, they can be made on the fresh concrete with a roller that carries a disc at its midpoint, together with a back plate that initially maintains the groove or by making a cut of the already hardened pavement.

In addition to the surface grooves 15, 17 it may be convenient to place on the floor 25 a plastic or a rubber (not shown in the Figures) that vertically induces the fissure from the bottom up. This rubber can also serve to better waterproof the fissure.

With respect to the behavior of the pavement according to the invention, it can be seen following Figure 4a that, when the load is located at an interior point of a sub-slab 21 of thickness 30 H, the tractions are located at the bottom.

When the load axis is on an edge between sub-slabs 21 there is no shear to be transmitted since the distribution to both support sub-slabs is identical. The upper part tends to come together and the lower part to separate. For there to be contact between the walls of the fissure, the tensile force of the reinforcement (see Figure 4b) must be equal to the compression forces of the concrete produced between the tie rods 25, 27; 26, 28 and longitudinal grooves 15, 17.

When there is support between the edge sections of the sub-slabs 21, the stresses are shown in Figure 4c. The compression stresses C are equal to the tensile stresses T = c * (H / 2 + H1) / 2. The negative bending moment is 1/2 * c * (H / 2 + H1) * (H / 2 + H1) * 2/3, or, T * 2/3 * (H / 2 + H1). Therefore, H1 must be as large as possible so that the traction T is as low as possible.
 Four. Five
We know that small slabs have small bending moments and involve a greater number of joints. If we have a solution of cheap and effective joints we can cut the slabs 13 into smaller portions that give us smaller tensions and allow us to reduce the original thicknesses of the slabs.
 fifty
Due to the transmission of negative moments, slabs 13 larger than the original ones can be made.

The minimum amount of reinforcement corresponding to tie bars 25, 27; 26, 28 should be such that:

1 .- Hold braking of vehicles. In critical situations of zero friction between the ground and the pavement, it can be assumed that the braking is only supported by the armor. 5 An indicative amount for roads can be (13000/2) * 0.4 = 2,600 kg of traction per meter. It is equivalent to 4 binding points of 4 mm in diameter, that is, every 25 cm.

2 .- Overcome friction with the ground due to the shrinkage of concrete slabs. The larger the slab 13 the greater that amount will be. For example, a slab 13 of 8 * 8 * 0.20 m, 10 with a coefficient of friction with the ground of 0.5 and with a specific weight of 2.5 kg / cm2 will have a traction per meter towards the center of the slab of (8/2) * 0.2 * 2.5 * 0.5 = 1 Ton = 1,000 kg, with the edges of the sub-slabs 21 needing two tying points of 4 mm in diameter per meter, that is , every 50 cm.
 fifteen
3 .- The tensile strength of the reinforcement endures the negative bending moments due to the cantilever position to which sub-slabs 21 that are outside the load tend. If we consider in the same slab the moment by own weight of a 1 meter overhang, that is, 0.2 * 2.5 * 1 * 1 * 0.5 = 0.25 m * Ton / m and H1 = 6 cm we have a traction T of 2.34 Ton per meter of slit, since T * 2/3 * (0.20 / 2 + 0.06) = 0.25, needing four tying points of 4 20 mm in diameter, that is, every 25 cm.

4 .- A rather unfavorable case is when the aggregates of the rough surface between the bottom of the longitudinal grooves 15, 17 and the tie rods 25, 27; 26, 28 lose their macro-roughness over time, or, when H2 is almost zero, that is, when the 25 bars tied 25, 27; 26, 28 are tangent to the bottom of the grooves 15, 17. We will consider between the surfaces of the fissure a coefficient of static friction of 0.6 and a shear to transfer, which in the worst case will be half of the load, the tensile force between the surfaces perpendicular to the shear force.
 30
In the case of a road, the traction for the 13 Ton axis whose maximum shear in 3 meters would be 13/2 would give (13/2) / 3) / 0.6 = 3.6 Ton per meter of indentation, needing 1 4 mm tie point every 18 cm.

5 .- The traction that resists the reinforcement must be greater than the compression of the concrete that exists between the reinforcement and the bottom of the grooves 15, 17, shown in Fig. 4b.

The maximum amount is that in which the compressive strength of the reinforcement is less than the compressive strength of the concrete above the reinforcement, since the fissure of the lower part (of the reinforcement downwards) would not be formed by load where we want; 40 we should also weaken the bottom. With the same case as before (H = 20 cm and H1 = 6 cm), it would be 1/2 * 4 * 300 * 100 = 5000 * S. The result is S = 12 cm2, that is to say that the tensile strength of the reinforcement must be less than 60,000 kg per meter, that is, less than 11 tying points of 12 mm in diameter per meter.
 Four. Five
Prior to the recess, the reinforcement must be placed, which can be a curved bar forming alternating semicircles around the axis of the recess. The radius determines the binding points provided by the bar.

It is not the object of this invention to place the armor because there are multiple procedures and for their relative simplicity.

However, it is proposed, with fresh concrete, on a platform or two with grooves of adequate width to the reinforcements to be placed. Rollers with separate spikes aran
said width to decompress the concrete. The reinforcements are placed on the decompressed surface to the depth to which the reinforcement will be with another roller, provided with two discs with small perimeter holes to engage the reinforcements well and introduce them into the loose concrete mass. Finally, on the platforms, a roller with a central disc and a smoothing-vibrating plate, then provided with a plate of the appropriate depth, leaves the groove in the fresh concrete.

Although the present invention has been described in connection with various embodiments, it can be seen from the description that various combinations of elements, variations or improvements can be made therein and that are within the scope of the invention defined in the appended claims.
权利要求:
Claims (11)
[1]

1. Pavement (11) formed by a set of concrete slabs (13) of a thickness H, characterized in that:
 5
- each of said slabs (13) comprises a plurality of surface grooves (15, 17) of a height H3 delimiting sub-slabs (21)
- comprises, as reinforcement, a set of tie rods (25, 27; 26, 28) of adjacent sub-slabs (21), on both sides of said surface grooves (15, 17), which are arranged under them to a distance H2.

[2]
2. Floor (11) according to claim 1, wherein said tie bars (25, 27) are bars arranged perpendicular to said surface grooves (15, 17).
 fifteen
[3]
3. Floor (11) according to claim 1, wherein said tie rods (26, 28) have an appropriate shape to be located alternately on one side and another of the surface grooves (15, 17).

[4]
4. Concrete pavement (11) according to claim 3, wherein the tie rods (26, 28) 20 are a succession of semicircles whose inflection points are in the vertical plane of the surface grooves (15, 17) and alternated in relation to said plane.

[5]
5. Pavement according to any of claims 3-4, wherein the length of the tie rods (26, 28) is between 1.5 and 5 times the length of the surface grooves (15.17).

[6]
6. Floor (11) according to any of claims 1-5, wherein H2 + H3 is less than H / 2.
 30
[7]
7. Floor (11) according to any of claims 1-6, wherein said surface grooves (15, 17) are parallel to the edges of the slabs (13).

[8]
8. Pavement (11) according to any of claims 1-7, wherein:
 35
- H3 is between 5-25% of H
- H2 is between 0-25% of H.

[9]
9. Pavement (11) according to any of claims 1-8, wherein:
- the surface of the slabs (13) is between 2x2 m2 and 25 * 25 m2;
- the surface of the sub-slabs (21) is between 0.4 x 0.4 m2 and 5 * 5 m2;
 Four. Five
- the thickness H of the slabs (13) is between 6-80 cm.

[10]
10. Concrete pavement (11) according to any of claims 1-9, wherein the tie rods (25, 27; 26, 28) are corrugated stainless steel bars.
 fifty
[11]
11. Concrete pavement (11) according to claim 10, wherein the diameter of the tie rods (25, 27; 26, 28) is between 2-10 mm.
类似技术:
公开号 | 公开日 | 专利标题
US9238891B1|2016-01-19|High strength, integrally pre-stressed monoblock concrete crosstie with optimal geometry for use in ballasted railways
CN207453184U|2018-06-05|A kind of connection structure for the prefabricated damping wallboard of frame structure
ES2693419B2|2019-10-15|Reinforced concrete pavement of reduced thickness
RU173490U1|2017-08-29|ORTHOTROPIC COMPOSITE PLATE
US7874761B2|2011-01-25|Support structure for a soft ground
US20170080264A1|2017-03-23|Methods and compositions for enhanced reinforcement for refractory fire containment walls
KR101630931B1|2016-06-24|Road decking panel having concrete crack protection and manufacture convenience
WO2016122302A1|2016-08-04|Prefabricated system for floor slabs and roofs with structural bamboo
US2479475A|1949-08-16|Composite structure with triangular shear connectors
KR20120110764A|2012-10-10|Elastomeric rubber bearing
US2093718A|1937-09-21|Joint construction
CN104746427B|2016-10-05|The external prestressing anchor structure of ultra-high performance concrete Thin-walled Box Girder
ES2334413B1|2010-12-02|PREFABRICATED STRUCTURAL CONCRETE Slab FOR PLATE VIA AND SAME INSTALLATION PROCEDURE.
CN209493830U|2019-10-15|A kind of highway high gradient slope prestress anchorage cable pile foundation high pier structure
Gambarova et al.2016|Design Issues about the Bar Lay-Out at the Dapped Ends of Simply-Supported One-Way R/C Slabs
KR20080104503A|2008-12-03|Steel fiber reinforced concrete panel and manufacturing method of the same
Furche et al.2017|Highly effective lattice punching shear reinforcement
KR101673957B1|2016-11-08|Steel-Concrete Composite Sleeper and Railway Ballasted Track using such Composite Sleeper
El-Salakawy et al.2005|Glass FRP composite bars for concrete bridge barriers
CA2882642C|2017-04-11|High strength, integrally pre-stressed monoblock concrete crosstie with optimal geometry for use in ballasted railways
CN104674659B|2017-02-01|Cast-in-place reinforced concrete bridge
CN104563321B|2017-02-01|High-energy-dissipating vibration absorbing type steel coupling beam and manufacturing method thereof
US696838A|1902-04-01|Concrete-arch construction.
JP6220542B2|2017-10-25|Fixing structure of tension member
Meng et al.2016|Attention to the production and construction of assembled concrete laminated plates
同族专利:
公开号 | 公开日
RU2019140804A|2021-07-09|
AU2018280931A1|2020-01-30|
WO2018224707A1|2018-12-13|
EP3712327A1|2020-09-23|
MX2019014554A|2020-02-07|
US20200199827A1|2020-06-25|
EP3712327A4|2021-10-06|
CN110753769A|2020-02-04|
BR112019025882A2|2020-06-30|
ES2693419B2|2019-10-15|
CO2019013651A2|2020-04-01|
MA50901A|2020-09-23|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题
US4449844A|1981-05-11|1984-05-22|Larsen Torbjorn J|Dowel for pavement joints|
DE4328831A1|1993-08-27|1994-04-21|Vonderlin Juergen Dipl Ing Fh|Transverse force transfer bracket - is formed as incorporated component of coupled, round steel rods and coated and having lateral abutments|
WO2005007970A1|2003-07-17|2005-01-27|Vazquez Ruiz Del Arbol Jose Ra|Device for forming joints in concrete works|
WO2013053001A1|2011-10-11|2013-04-18|Concrete Slab Technology Pty Ltd|Composite structure|
US20150259862A1|2012-10-12|2015-09-17|Sam Woo Innovation Maintenance Construction Co., Ltd.|Method for constructing continuously reinforced concrete pavement using reinforcing steel introducing/fixing equipment|
US20170002524A1|2015-07-01|2017-01-05|University-Industry Cooperation Group Of Kyung Hee University|Transformed continuously reinforced concrete pavement structureusing short reinforcing bar and crack induction|
GB8430835D0|1984-12-06|1985-01-16|Southorn J A|Paving|
CN102031744B|2010-11-22|2012-07-04|长沙理工大学|Composite pavement structure and construction method thereof|
CN204715195U|2015-04-09|2015-10-21|武汉市政工程设计研究院有限责任公司|A kind of Gang Liang – concrete slab composite continuous bridge hogging moment area cracking resistance structure|
法律状态:
2018-12-11| BA2A| Patent application published|Ref document number: 2693419 Country of ref document: ES Kind code of ref document: A1 Effective date: 20181211 |
2019-10-15| FG2A| Definitive protection|Ref document number: 2693419 Country of ref document: ES Kind code of ref document: B2 Effective date: 20191015 |
优先权:
申请号 | 申请日 | 专利标题
ES201700625A|ES2693419B2|2017-06-08|2017-06-08|Reinforced concrete pavement of reduced thickness|ES201700625A| ES2693419B2|2017-06-08|2017-06-08|Reinforced concrete pavement of reduced thickness|
AU2018280931A| AU2018280931A1|2017-06-08|2018-06-06|Reduced-thickness reinforced concrete pavement|
MX2019014554A| MX2019014554A|2017-06-08|2018-06-06|Reduced-thickness reinforced concrete pavement.|
EP18812857.3A| EP3712327A4|2017-06-08|2018-06-06|Reduced-thickness reinforced concrete pavement|
PCT/ES2018/000051| WO2018224707A1|2017-06-08|2018-06-06|Reduced-thickness reinforced concrete pavement|
US16/620,440| US20200199827A1|2017-06-08|2018-06-06|Reduced-thickness reinforced concrete pavement|
MA050901A| MA50901A|2017-06-08|2018-06-06|REDUCED THICKNESS REINFORCED CONCRETE SIDING|
BR112019025882-5A| BR112019025882A2|2017-06-08|2018-06-06|reinforced concrete floor with reduced thickness|
RU2019140804A| RU2019140804A|2017-06-08|2018-06-06|REINFORCED CONCRETE ROAD LEAF OF REDUCED THICKNESS|
CN201880038090.XA| CN110753769A|2017-06-08|2018-06-06|Reinforced concrete pavement with reduced thickness|
CONC2019/0013651A| CO2019013651A2|2017-06-08|2019-12-03|Reduced thickness reinforced concrete pavement|