专利摘要:
The present invention relates to carbon fibre boom structure (1) for an agricultural sprayer boom (3), said boom structure (1) comprising an elongated upper carbon fibre tube (10), at least one elongated lower carbon fibre (15, 20) and a carbon fibre/resin matrix uniting structure (40) bonded to each of said carbon fibre tubes (10, 15, 20) to hold the tubes (10, 15, 20) in a spaced apart position, said uniting structure (40) being formed in a winding operation by applying windings of a carbon fibre string (800) with a liquid resin around portions of said tubes (10, 15, 20), said windings and resin matrix defining an inner primary layer (70) and an outer primary layer (80) of said uniting structure (40), wherein a portion (75) of said inner primary layer (70) is bonded to a surface portion of each tube (10, 15, 20) that is oriented towards the inside of the uniting structure (40) while a portion of said outer primary layer (80) is bonded to a remaining surface portion of each tube (10, 15, 20) to completely, or essentially completely, envelope each tube (10, 15, 20) by the said portions of said two primary layers (70, 80).
公开号:DK201970672A1
申请号:DKP201970672
申请日:2019-10-30
公开日:2021-05-20
发明作者:Louis Frederiksen Casper;Nejsum Lars
申请人:Exel Industries Sa;
IPC主号:
专利说明:

DK 2019 70672 A1 1 A carbon fibre structure, and a method for forming the carbon fibre structure The present invention relates in particular to agricultural sprayers where a two- or three-dimensional carbon fibre structure defines a sprayer boom sec- tion comprising parallel, or essentially parallel, carbon fibre tubes and a unit- ing carbon fibre/epoxy structure bonded to each tube. Specifically, the uniting structure of the invention is formed in a winding oper- ation and holds the parallel tubes in a spaced apart position, serving also to transfer forces between the tubes, as in a lattice structure. A plurality of such uniting structures defining respective joints are along the length of the sprayer boom section.
Sprayer boom sections comprising a plurality of relatively short length carbon fibre tubes joined lengthwise via uniting structures are known from eg. US patent 9,839,211. Connecting carbon fibre tubes to each other via a con- nector body and a connector device using glue is known from eg. WO99/49150.
The object of the present invention is to provide a uniting structure or joint that is easy to manufacture using the method also claimed herein, which unit- ing structure may define in part an agricultural sprayer boom section of the aforementioned type, such as of the type where the carbon fibre tubes are each prefabricated to have a length corresponding to the full length of the boom section or part length thereof.
Brief description of the drawings Fig. 1a is a perspective, partial and schematic view of a three dimensional light-weight carbon fibre structure,
DK 2019 70672 A1 2 Fig. 1b shows, schematically, an agricultural sprayer boom extending from one side of a frame, Fig. 1c shows highly schematically a connector between the structure of fig.
1a and a metal structure of the sprayer boom of fig. 1b, Fig. 1d shows schematically a perspective view of the end portion of a prior art elongated hollow cylindrical carbon fibre tube, Fig. fe shows in a perspective view an embodiment of a uniting carbon fi- bre/epoxy structure as shown in fig. 1a, Fig. 1f shows the uniting structure of fig. 1e as seen from the side, Figs. 1g and 1h show alternative embodiments of the uniting structure of fig. 1e, Fig. 2a is a perspective view showing a core device used for making the unit- ing structure of fig. 1e, Fig. 2b shows the core device of fig. 2a mounted onto a rotary device carry- ing along its length a plurality of spaced apart core devices of the type shown in fig. 2a, and Figs. 3a-3f show various steps during the making of the uniting structure of fig. 1e using the rotary device shown in fig. 2b. Detailed description
DK 2019 70672 A1 3 The invention will now be explained in more detail by reference to an embodi- ment, and to a use thereof. Figure 1a is a perspective, partial and schematic view of a three dimensional light-weight carbon fibre structure including carbon fibre upper and lower tubes 10, 15, 20 and configured for forming a section 1 of a sprayer boom which is part of an agricultural sprayer. Fig. 1b shows, in part, an embodiment of such an agricultural sprayer, which also comprises a tractor driven or carried tank S for containing a liquid spray- ing agent, the tank S being supported by a frame F, normally provided with supporting wheels, of which only one is shown. The sprayer boom normally comprises two similar parts that extend outwards from a respective side of the frame F.
Fig. 1b shows one such part of the boom extending from one side of the frame F and which has an outer end E; for convenience, in the following, the shown boom part will simply be referred to as a boom, and be designated nu- meral 3.
The boom 3 shown in fig. 1b carries pipes (not shown) connecting the tank S with nozzles N for delivering the spraying agent and being arranged spaced apart along the length of the boom 3. The spraying agent is, as is conven- tional, delivered from the tank S using a suitable pump (not shown) mounted on the aforementioned frame F. The shown boom 3 is, as is conventional for agricultural sprayer booms, sup- ported by the frame F via a link L that allows the boom 3 to be turned into a non-operative position where it extends alongside the tank S in a direction of travel of the agricultural sprayer. In fig. 1b the boom 3 is shown as being formed by two individual sections, one being the section 1 shown in fig. 1a
DK 2019 70672 A1 4 and the other one being a relatively heavy three dimensional metal lattice structure B, or a light weight three dimensional lattice structure B such as of aluminium or carbon, connected at one end to the frame F via the aforemen- tioned link L. The light-weight carbon fibre section 1 which defines the boom outer end E at its one end, is connected with the metal structure B at its other end via at least one connector device T. The connector device T is shown highly schematically in fig. 1c, and is typi- cally a metal body. The connector device T allows for the carbon fibre section 1 to be supported by the metal structure B, and may itself be configured to al- low for the light-weight section 1 to be turned relative to the metal structure B to allow for the two structures 1, B to be folded against each other, to reduce the overall length of the boom 3 when in its non-operative position alongside the tank S. Often a connector device T will connect the shown upper tube 10 of the section 1 with an upper lattice member of the metal structure B, while similar connectors will connect each of the shown two lower tubes 15, 20 with respective lower lattice members of the metal structure B.
Where the carbon fibre section 1 is connected directly to the frame F, as where no metal structure B is used, the connector device T may comprise, or be connected to, the aforementioned link L at the frame F. The connector de- vice T may be welded to or otherwise secured to the metal structure B or to the frame F, as the case may be.
Infig. 1d is schematically shown a perspective view of the end portion of an elongated hollow cylindrical carbon fibre tube. Such a tube defines each one of the shown elongated tubes 10, 15, 20 that form the three dimensional car- bon fibre structure or section 1 wherein the upper tube 10 may preferably converge towards the two lower tubes 15, 20 at the end E of the boom 3.
DK 2019 70672 A1 Preferably, the tubes 10, 15, 20 have been made with a length corresponding to that of the carbon fibre section 1, or in several parts forming together the full length of the section 1. 5 Generally, each elongated tube 10, 15, 20 is a carbon fibre/epoxy tube, that may be formed by spiral winding a carbon fibre string 800 in alternate direc- tions around a mandrel that defines the internal diameter of the tube 10, 15, 20, with the total thickness of the tube 10, 15, 20 being determined by the thickness of the windings. As explained in WO99/49150, such tubes are cured to provide maximum mechanical properties. To allow for subsequent pulling off of the finished tube from the mandrel a slip agent is normally ap- plied to the mandrel.
Fig. 1e shows an embodiment of a hollow, uniting carbon fibre/epoxy struc- — ture 40 bonded to each of three carbon fibre tubes 10, 15, 20 to form a light weight carbon fibre section 1 as shown in fig. 1a. The uniting structure 40 is formed in a winding operation by winding a many metres long carbon fibre string with a liquid epoxy coating around portions of the tubes 10, 15, 20, as explained further below, and holds when cured the three tubes 10, 15, 20 in a spaced apart position, serving also to transfer forces between the tubes 10, 15, 20, as in a lattice structure. A plurality of such uniting structures 40 define respective tube joints along the length of the section 1. The aforementioned nozzles N may be carried by one of the lower tubes 15, 20.
— The uniting structure 40 of fig. 1e has layered carbon fibre legs 55, 60 that converge towards the top tube 10 of the carbon fibre structure 1, with two pri- mary layers 70, 80 of each leg 55, 60 being bonded to respective portions of the periphery of each tube 10, 15, 20. Specifically, an inner one 70 of the two primary layers contacts a portion of each tube 10, 15, 20 oriented towards the inside of the uniting structure 40 while an outer one 80 contacts the re- maining portion of each tube 10, 15, 20 that is oriented towards the outside of
DK 2019 70672 A1 6 the uniting structure 40. In this manner the tubes 10, 15, 20 are essentially completely enveloped by the two layers 70, 80, and bonded thereto.
The bond is established after completion of the winding operation in that the car- bon fibre string epoxy/resin coating is cured to thereby not only bind the fibre windings that define the uniting structure 40 to each other but also to bond the uniting structure 40 to the tubes 10, 15, 20. As will be understood, each of the shown primary layers 70, 80 is normally build up from a plurality of sublayers, each formed by adjacent windings of — the carbon fibre string, that together define the thickness of the respective primary layer 70, 80. Where the two legs 55, 60 meet, the carbon fibre string is arranged to cross over a portion of the carbon fibre string previously laid out during the winding procedure, as shown schematically in fig. 1e, such that the uniting structure appears as a monolithic structure in the region — where the two legs 55, 60 meet.
This stands in contrast to the embodiment shown in fig. 1h where the two converging legs 55, 60 are not integrated at the top tube 10. The legs 55, 60 are in the shown embodiment spaced apart where they con- — nectto the two lower tubes 15, 20. This allows /.a. for the aforementioned nozzles N to be positioned also in the area of the uniting structure 40, namely in the gap between the legs 55, 60 and between the lower tubes 15, 20, al- lowing for spraying agent to be discharged downwards onto a crop without the uniting structure 40 interfering with the spraying pattern.
A most narrow part of the gap is shown in fig. 1e by numeral 42. In another embodiment, as shown in fig. 1g the uniting structure 40 does not included spaced apart legs and appears as a single monolithic structure.
The boom sections 1 shown in figs. 1b, 1g and 1h may be 2-dimensional, or 3-di- — omensional as the boom section 1 shown in fig. 1a.
DK 2019 70672 A1 7 Turning now to fig. 2a there is shown a perspective view of a core device 100 used for making the uniting structure of figs. 1f-1h, and fig. 2b shows the core device 100 in a manufacturing facility, mounted onto an elongated rotating axle 400 carrying along its length a plurality of spaced apart core devices
100. The core device 100 has a through-going opening 105 for receiving the elongated axle 400, and has on its periphery a number of elongated recesses 110, 120, 130. The core device 100 may also be provided with a projecting area 102 configured for forming the aforementioned gap 42 in that the carbon fibre string 800 is not wound onto this projecting area 102. A slip agent is preferably applied to the surface of the core device 100 to allow removal therefrom of the finished unifying structure 40. Fig. 2b shows an initial step during the making of the unifying structure 40, more specifically during the winding of the portion of a carbon fibre string 800 — forming the inner primary layer 70. It will be understood that the winding pro- cedure takes place in that the axle 400 is rotated about its longitudinal axis, thereby rotating the core device 100 about the same axis while unwinding the carbon fibre string 800 from a supply W, such as a spool, which rotates also, as indicated by the arrow B in fig. 2b. The winding procedure is preferably such that the supply W moves also sideways back and forth in the directions indicated by arrows A in fig. 2b. Fig. 2b shows also one embodiment of a removable spacer device 200, the overall purpose of which is to ensure that the inner primary layer 70 is wound about the core device 100 with a certain slack where portions of the primary layer 70 bridge the recesses 110, 120, 130. Fig. 3a again shows the core device 100 operated in a manufacturing facility, and with an alternative spacer device comprising in this case three tubular pieces 200, each to be received in a respective one of the three elongated recesses 110, 120, 130 having preferably a shape complementary with the
DK 2019 70672 A1 8 tubes 10, 15, 20. The tubular pieces 200 are, like the device 200 shown in fig. 2b, preferably provided with a slip agent, such as Teflon, allowing re- moval of the spacer device(s) 200 from the core device 100 once winding of the inner primary layer 70 around the core device 100 has been completed.
Fig. 3b shows the core device 100 after a number of windings of the carbon fibre string 800 have been applied to form the inner primary layer 70, using the facility generally shown in fig. 2b. At this point the winding procedure is interrupted and the spacer devices 200 are removed, as shown by the arrow — in fig. 3c, leaving outwardly bulging portions of the inner primary layer 70 where the spacer devices 200 were before, and/or spanning across the re- cesses 110, 120, 130, as shown in fig. 2b. Using a tool (not shown) the out- wardly bulging portions 75 of the inner primary layer 70 is now pressed into the recesses 110, 120, 130, as shown by the arrows in fig. 3d, whereby the — inner primary layer 70 not only contacts a core device 100 periphery part de- fining the sides of the core device 100 but also the periphery part defining the bottom of the recesses 110, 120, 130 of the core device 100. The prefabricated carbon fibre tubes 10, 20, 30 that are to form the structure 1 together with the unifying structure 40, are then placed into a respective re- cess 110, 120, 130, on top of those portions of the inner primary layer 70 that previously formed the aforementioned outwardly bulging portions 75, as shown in fig. 3e, and the winding procedure is initiated again to form now the outer primary layer 80. Ending the process a film may be over-winded to en- sure compression of the primary layers 70, 80 during subsequent curing. After curing of the epoxy resin or other polymer matrix, such as for 2-4 hours, the axle (not shown in figs. 3a-3f) and the plurality of core device 100 each carrying a respective unifying structure 40 are then removed, leaving a light weight structure 1 as shown in fig. 1a. A subsequent, additional curing may
DK 2019 70672 A1 9 take place, such as by then placing the structure 1 in an oven for about 24 hours at a temperature of eg. 80°C.
While the invention is discussed herein in the context of agricultural sprayer sections made using carbon fibre tubes, the uniting structure 40 and the method disclosed herein may also be applied for other tubes made from other types of fibres, or even with metal tubes.
A carbon fibre string as mentioned herein may include carbon fibres STS and Toray T700, or Granoc CN600 using PR102/EM100 epoxy resins from GRM Systems as the matrix.
权利要求:
Claims (10)
[1] 1. A carbon fibre boom structure (1) for an agricultural sprayer boom (3), said boom structure (1) comprising: - an elongated upper carbon fibre tube (10), - at least one elongated lower carbon fibre (15, 20) and - a carbon fibre/resin matrix uniting structure (40) bonded to each of said carbon fibre tubes (10, 15, 20) to hold the tubes (10, 15, 20) in a spaced apart position, said uniting structure (40) being formed in a winding operation by applying windings of a carbon fibre string (800) with a liquid resin around portions of said tubes (10, 15, 20), - - said windings and resin matrix defining an inner primary layer (70) and an outer primary layer (80) of said uniting structure (40), wherein a portion (75) of said inner primary layer (70) is bonded to a surface portion of each tube (10, 15, 20) that is oriented towards the inside of the uniting structure (40) while a portion of said outer primary layer (80) is bonded to a remaining surface portion of each tube (10, 15, 20) to completely, or essentially completely, envelope each tube (10, 15, 20) by the said portions of said two primary layers (70, 80).
[2] 2. The boom structure (1) of claim 1, comprising one upper carbon fibre tube (10) and two lower carbon fibre tubes (15, 20), said two lower carbon fibre tubes (15, 20) optionally extending parallel to one an- other.
[3] 3. The boom structure (1) of claim 1 or 2, said primary layers (70, 80) be- ing bonded to each other along portions of said windings between said carbon fibre tubes (10, 15, 20).
[4] 4. The boom structure (1) according to any of the previous claims, said carbon fibre string (800) being laid out for each winding to cross over portions thereof previously laid out.
[5] 5. The boom structure (1) according to any of the previous claims, said uniting structure (40) including two opposite pairs of legs (55, 60), the
DK 2019 70672 A1 11 legs (55, 60) of each pair converging towards said upper carbon fibre tube (10) and being spaced apart at said lower tube(s) (15, 20).
[6] 6. A method of making the boom structure (1) according to any of the previous claims, comprising the steps of: - providing a core device (100) having a periphery with a plurality of elongated recesses (110, 120, 130), each recess (110, 120, 130) configured for receiving one of said tubes (10, 15, 20), - providing a supply (W), such as a spool, of a carbon fibre string (800) with a liquid resin, - positioning one or more spacer devices (200) along said periphery, - winding said carbon fibre string (800) with said liquid resin around said core device with said spacer device(s) (200), to form said in- ner primary layer (70), with portions (75) of said inner primary layer (70) bridging said elongated recesses (110, 115, 120), - removing said spacer device(s) (200), - pressing said portions (75) of said inner primary layer (70) into said elongated recesses (110, 120, 130), - positioning said tubes (10, 15, 20) in a respective one of said elon- gated recesses (110, 115, 120), with a first surface portion of each tube (10, 15, 20) bearing against a respective one of said portions (75) of said primary layer (70), - winding said carbon fibre string (800) around said inner primary layer (70) and second surface portions of said tubes (10, 15, 20), to form said outer primary layer, - curing said resin to bond said inner and outer primary layers (70, 80) to each other and to said surface portions of said tubes (10, 15, 20), - before or after said curing removing said core device (100).
[7] 7. The method of the previous claim, comprising the step of longitudinally displacing said supply (W) back and forth relative to said core device
DK 2019 70672 A1 12 (100) during said winding, for said carbon fibre string to cross over portions thereof previously laid out during said winding.
[8] 8. The method of claim 6 or 7, wherein said fixture (400) with said core device (100) is rotated for said winding, said carbon fibre string being simultaneously unwound from said supply (W), said carbon fibre string (800) being dipped into said liquid resin to apply a coating thereon.
[9] 9. The method according to any of claims 6-8, wherein one spacer de- vice (200) is positioning in each of said recesses (110, 120, 130).
[10] 10. The method according to any of the previous claims 6-9 wherein a slip agent is applied to said spacer device(s) (200) and to said recesses (110, 120, 130).
类似技术:
公开号 | 公开日 | 专利标题
KR20180008886A|2018-01-24|Construction of pipes
US4106797A|1978-08-15|Reinforced fitting construction
US20140378896A1|2014-12-25|Balloon for treatment of stenosis and method for manufacturing the balloon
US4923081A|1990-05-08|Storage tanks with fabricated support ribs
ES2394397T3|2013-01-31|A method of applying a vacuum bag around a fuselage tube made of composite material to polymerize
KR20160003673A|2016-01-11|Inflatable medical balloons with continuous fiber wind
US4243457A|1981-01-06|Method of molding pipe joints of reinforced resin
JP2012513910A|2012-06-21|Connection method for connecting structural elements made of composite material to a tube
DK201970672A1|2021-05-20|A carbon fibre structure, and a method for forming the carbon fibre structure
US6746737B2|2004-06-08|Hollow composite body and its manufacturing process
KR101948367B1|2019-02-14|Construction of pipes
JPH07178838A|1995-07-18|Shuttering tube for concrete column and its production
US4684423A|1987-08-04|Method fabricating a collapsible mandrel structure to be used in manufacturing reinforced hollow tanks
JP2001503503A|2001-03-13|Reinforced plastic container
US3106940A|1963-10-15|Manufacture of filament wound articles having reinforcement for openings formed therein
FR2720795A1|1995-12-08|Straight bars for transmitting longitudinal forces based on reinforced composite materials.
JP3488191B2|2004-01-19|Reinforcing method for the root of concrete electric pole
JP2005024095A5|2007-07-12|
JP6033793B2|2016-11-30|Belt-clamped annular pressure vessel and method of making the same
JP2009533221A5|2010-06-03|
US20160377148A1|2016-12-29|Methods of coupling a flywheel rim and a shaft
JP5715232B2|2015-05-07|Method for manufacturing an arm with a composite material comprising a transverse bearing configured to receive a fixed or rotating shaft
EP0647751A2|1995-04-12|Braided airbeams and method of making the same
JP3401000B2|2003-04-28|Method of manufacturing variable rigidity line and related members
JP2011098475A|2011-05-19|Method for producing reducer made of fiber-reinforced resin
同族专利:
公开号 | 公开日
WO2021083960A1|2021-05-06|
DK180480B1|2021-05-20|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题

AU2759167A|1968-09-23|1970-04-09|JAMES LANDRETH and MILTON EUGENE DOWNING DAVID JAMES HENDRY|Agricultural boom spray|
FR2595270B1|1986-03-07|1989-03-03|Evrard Ets|AGRICULTURAL SPRAYING RAMP|
FR2643831B1|1989-03-03|1991-10-18|Evrard Ets|IMPROVEMENTS ON SPRAYER RAMPS, ESPECIALLY IN AGRICULTURE|
GB2335669B|1998-03-26|2002-08-28|Philip Rudolph Enos|Structural truss|
GB0426944D0|2004-12-08|2005-01-12|Airbus Uk Ltd|A trussed structure|
US8347572B2|2011-04-19|2013-01-08|Lockheed Martin Corporation|Lightweight beam structure|
US9404249B2|2012-01-18|2016-08-02|Adc Acquisition Company|Ultra light fiber placed truss|
US9839211B2|2014-08-11|2017-12-12|Deere & Company|Segmented boom system for work vehicle|
DE102015110696A1|2015-07-02|2017-01-05|Carbofibretec Gmbh|Field sprayer and sprayer arm in mixed construction|
JP6737244B2|2017-06-28|2020-08-05|井関農機株式会社|Work vehicle|
US10806105B2|2017-10-04|2020-10-20|Deere & Company|System of integrated passageways in a carbon fiber boom and method thereof|
法律状态:
2021-05-20| PAT| Application published|Effective date: 20210501 |
2021-05-20| PME| Patent granted|Effective date: 20210520 |
优先权:
申请号 | 申请日 | 专利标题
DKPA201970672A|DK180480B1|2019-10-30|2019-10-30|Carbon fiber construction and a method of forming the carbon fiber construction|DKPA201970672A| DK180480B1|2019-10-30|2019-10-30|Carbon fiber construction and a method of forming the carbon fiber construction|
PCT/EP2020/080287| WO2021083960A1|2019-10-30|2020-10-28|A carbon fibre structure, and a method for forming the carbon fibre structure|
[返回顶部]