专利摘要:
A bridge construction 100 on a waterway supported by a plurality of pillars 130 is disclosed. The bridge construction 100 comprises a first deck 102 having a rail track 108 and a central arch structure 110, wherein the rail track 108 configured to provide access to a plurality of interconnected wagons 106 and a pathway 112 formed along either side of the rail track 108 configured to provide access to a pedestrian and a cyclist. A second deck 104 comprising a plurality of containers 114 configured to provide an access for utilities selected from at least one of a hotel, a residence, a hospital, a police station, a prison, a museum, an educational zone, a business zone, an exhibition zone, a 10 conference hall and a market zone. A water surface 116 comprises an integrated power system 118, an incineration system 122 and a floating platform 124. The bridge further comprises a lighting system 136 configured to enhance the aesthetic appearance of the bridge.
公开号:DK201600571A1
申请号:DKP201600571
申请日:2016-09-29
公开日:2018-02-05
发明作者:Jonna Colding Henriksen
申请人:Big Stream Bridge Dev Ivs;
IPC主号:
专利说明:

<1θ> DANMARK <1°> DK 2016 00571 A1 <12> PATENTANSØGNING
Patent- og
Varemærkestyrelsen (51)
Int.CI.: E 01 D 18/00 (2006.01)
E 01 D 4/00(2006.01) (21) Ansøgningsnummer: PA 2016 00571 (22) Indleveringsdato: 2016-09-29 (24) Løbedag: 2016-09-29 (41) Aim. tilgængelig: 2018-02-05 (71) Ansøger: Big Stream Bridge Development IVS, Amalievej 14, 4760 Vordingborg, Danmark (72) Opfinder: Jonna Colding Henriksen, Amalievej 14, Masnedsund, 4760 Vordingborg, Danmark (74) Fuldmægtig: InnovatorLAB v/Marcus Reinholdt Pedersen, Ibstrupvænget 2, 2.th., 2820 Gentofte, Danmark (54) Benævnelse: A Bridge Construction (57) Sammendrag:
A bridge construction 100 on a waterway supported by a plurality of pillars 130 is disclosed. The bridge construction 100 comprises a first deck 102 having a rail track 108 and a central arch structure 110, wherein the rail track 108 configured to provide access to a plurality of interconnected wagons 106 and a pathway 112 formed along either side of the rail track 108 configured to provide access to a pedestrian and a cyclist. A second deck 104 comprising a plurality of containers 114 configured to provide an access for utilities selected from at least one of a hotel, a residence, a hospital, a police station, a prison, a museum, an educational zone, a business zone, an exhibition zone, a 10 conference hall and a market zone. A water surface 116 comprises an integrated power system 118, an incineration system 122 and a floating platform 124. The bridge further comprises a lighting system 136 configured to enhance the aesthetic appearance of the bridge.
Fortsættes ...
DK 2016 00571 A1
100 o
DK 2016 00571 A1
A BRIDGE CONSTRUCTION
BACKGROUND
Currently, an urban development and planning process plays a major role in the economic significance of a location in a state. The urban development factor depends on commercial and marketing activities. Therefore, a strategic planning is required to build a system that concentrates on a land-use planning, road and rail transportation planning, and an economic development. Nowadays most of the government and state authorities devises strategies to improve the infrastructure inside the city limits to boost the economic significance of the place. However, this led to the development of skyscrapers, and new streets to get access to various utilities, which in turn increases the road traffic and congestion as well as the land value.
There have been many attempts to provide solutions to improve the environment, business status and transportation away from the city limits and at the same time giving an experience of using all the utilities at the same place. However, most of the attempts have their own limitations like lack of coordination among the utilities, cumbersome set up, expensive funding and so on. A prior art reference US 5655244 A discusses about a super long bridge with an automatic transporting system wherein individually controllable trucks and transportation lane configured to provide access to the public. However, this disclosure does not provide additional utilities such as a hotel, a hospital, a museum and so on. Furthermore, it includes more limitations like lack of power supply for the transportation unit and other purposes.
Hence, there is a long felt but unresolved need for an infrastructure system at one place such as a historic bridge located on a waterway to provide a plurality of utilities such as transportation, business zone, entertainment zone, market zone and so on to give the public an enthralling experience of an integrated mini-society at one place.
SUMMARY OF THE INVENTION
DK 2016 00571 A1
According to the present invention, a bridge construction on a waterway supported by a plurality of pillars is disclosed. The bridge construction comprises a first deck configured to have a rail track and a central arch structure, wherein the rail track configured to provide access to a plurality of interconnected wagons. A pathway is formed along either side of the rail track configured to provide access to a pedestrian and a cyclist. A second deck comprises a plurality of containers is configured to provide an access for utilities selected from at least one of a hotel, a residence, a hospital, a police station, a prison, a museum, an educational zone, a business zone, an exhibition zone, a conference hall and a market zone.
In an embodiment, the bridge construction further comprises a water surface wherein an integrated power system is configured to provide power to the utilities of the first deck and the second deck. An incineration system is also configured to heat the water and a floating platform is set up to have a rescue area accessed via a maritime staircase operably attached to the first deck of the bridge. The floating platform could be used selectively as a bathing island, or a swimming pool.
In another embodiment, the central arch structure of the bridge is disclosed. The central arch structure comprises a plurality of arches made from a transparent material. The arches are configured to have a plurality of steel frames and spans to provide the structural stability of the central arch structure with the bridge. In different embodiments, a lighting system is implemented in the bridge construction, which enhances the aesthetic appearance of the bridge.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 exemplarily illustrates a schematic diagram of a bridge construction on a waterway supported by pillars, incorporating the aspects of the present invention.
DK 2016 00571 A1
FIG. 2 exemplarily illustrates an exploded view of a container configured to be attached to a second deck of the bridge, incorporating the aspects of the present invention.
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 exemplarily illustrates a schematic diagram of a bridge construction 100 on a waterway supported by a plurality of pillars 130. The bridge construction 100 comprises a first deck 102 configured to have a rail track 108 and a central arch structure 110, wherein the rail track 108 configured to provide access to a plurality of interconnected wagons 106. A pathway 112 is formed along either side of the rail track 108 configured to provide access to a pedestrian and a cyclist. The bridge construction 100 comprises a second deck 104 configured to have a plurality of containers 114 to provide an access for utilities selected from at least one of a hotel, a residence, a hospital, a police station, a prison, a museum, an educational zone, a business zone, an exhibition zone, a conference hall and a market zone. The water surface 116 of the bridge construction 100 comprises an integrated power system 118 configured to provide power to the utilities of the first deck 102 and the second deck 104, at least one incineration system 122 to heat the water and a floating platform 124 configured to have a rescue area accessed via a maritime staircase 126 operably attached to the first deck 102 of the bridge construction 100.
In an embodiment as shown in FIG. 1, the central arch structure 110 of the bridge construction 100 comprises a plurality of arches made from a transparent material. Preferably, the arches are covered with a glass material to enhance the artistic appearance of the central arch structure 110 in the bridge as well as to withstand the wind and impact of storm birds. Further, the floor of the arches is also configured to have a transparent material so that a person could view the structure below with ease. The central arch structure 110 further comprises a plurality of steel frames and spans configured to provide the structural stability of the central arch structure 110 with the bridge. In an exemplary embodiment, the central arch structure 110 comprises three arches with steel frames and spans covered by the glass material.
DK 2016 00571 A1
In an embodiment as shown in FIG. 1, the floating platform 124 is deployed during the bridge construction. The floating platform 124 could be used as rescue area, and deployed juxtaposed to the first deck 102 of the bridge via the maritime staircase 126 operably attached therein. In an exemplary embodiment, the maritime staircase 126 could be deployed and connected to the floating platform 124 during a critical situations encountered by the user or swimmers. For example, if the person dives into the water from one of the decks, in case if he is unable to swim or save himself, the maritime staircase 126 person could be deployed to rescue the person in time. In other embodiments, the floating platform 124 is configured to implement as the bathing island with eyelashes, and enclosed swimming area with much comfort, which could also be accessed from the bridge via maritime stairs 126.
In another embodiment according to FIG. 1, the bridge construction 100 comprises a lighting system, which enhances the aesthetic appearance of the bridge. The lighting system 136 comprises a tone lighting arrangement with desired colors covering the decks (102 & 104), central arch structure 110, pillars 130, and other sections of the bridge to highlight the bridge construction 100 especially during night. The lighting system 136 for the second deck allows the user to access various utilities by enhancing the visibility and appearance of all the utilities during both day and night time. The plurality of pillars 130 and pliers supports the bridge construction 100 on the waterway is configured to allow a ship 134 to pass through the structure. Optionally, one or two platforms can be provided under the bridge for safety and maintenance purpose. Further, a magnifying glass 132 is configured to be attached to one of the containers 114 to give the user an enhanced view of the city infrastructure from the bridge itself.
Referring to FIG. 1, the first deck 102 and second deck 104 of the bridge construction 100 on the waterway supported by a plurality of pillars 130 is illustrated.
The first deck 102 of the bridge is deployed with a rail track 108 to enable the rail transportation through the central arch structure 110 of the bridge. One or two wagons
106 are deployed on the rail track 108, which is configured to move, and connect to any
DK 2016 00571 A1 other existing rail network in the state. Optionally, the wagons 106 are configured to stay intact on the rail track so that it provides access to a hospital, a security station and an emergency vehicle. The middle arch of the central arch structure 100 comprises ropes on the floor, which may be loosened when the wagons moves along the rail track 108. Further, the bridge construction 100 according to the present invention provides a set of wagons 106 to act as a backdrop house, a dining car, a sleeping car, an exhibition vehicle, etc. on the bridge. However, the configuration of wagons 106 on the first deck 102 of the bridge gives an appearance of trains running on the bridge that stands on the waterway. A roadway path 112 is also constructed along the sides of the rail track 108 on the first deck 102 to give access to the pedestrians and cyclists for commuting purpose. In some embodiments, wagons 106 are configured to assist disabled people for extended usage. The integrated power system 118 provides power to the wagons 106 of the rail system.
As shown in FIG. 2, the containers 114 are configured to provide an access for utilities in the bridge construction 100 on the waterway. The containers 114 are arranged in the second deck 104 of the bridge to provide access for multiple utilities such as the hotel, the residence, the hospital, the police station, the prison, the museum, the educational zone, the business zone, the exhibition zone, the conference hall and the market zone. The utilities are divided into three zones: a zone-1 providing access for education and delighting zone, a zone-2 providing access for conference halls and market square and a zone-3 providing access for hotels, profession and promotional activities. Therefore, the bridge acts as a point of source for several facilities to give the user an experience of mini society. In addition to the wagons 106 on the first deck 102, the containers 112 in the second deck 104 also provides emergency and police unit for user safety and convenience. In different embodiments, a plurality of operational departments and modern minimalistic residential are configured to be arranged on the second deck 104 to serve multiple purposes. The bridge is located in the banks and the hotels are fitted to give east and west views, and if the iron plates are replaced by the transparent materials, the user in the bridge can see through at a distance in sunlight and also providing light and views of people inside the room shaped container. The containers 114
DK 2016 00571 A1 are mounted and arranged under the roadway 112 of the first deck 102 providing additional stability to the structure.
In preferred embodiments, as shown in FIG. 1, the bridge further comprises integrated power system 118 configured to provide power to the utilities of the first deck 102 and the second deck 104 of the bridge. The integrated power system 118 comprises a power source selected from at least one of a water turbine and a solar panel 120. The water turbines are installed in nearby places of the bridge so that the power generated can be easily transferred to the utility system for usage. Further, the solar panels 120 are implemented to arrange on a plurality of predetermined positions of the second deck 104. The water turbines 118 and solar panels 120 acts as the integrated power source to supply power to all the utilities of the bridge. The bridge also comprises the incineration system 122 to treat the waste materials for additional power generation, which could be used to supply power to many applications such as heating the water and so on. Optionally, a water purification system is configured to provide drinking water requirements to the utilities of the bridge.
The bridge construction 100 enables promoting 'Blue and green' environmental policies of the state and as it comprises power, heating, lighting and waste incineration, it can be modeled as a mini-society. The operation of the bridge allows for minimum transport of things and helps to promote recycling of energy from consumption locally. The architectural expression of the bridge gives an appealing vison when viewed from far away in the sunlight from the West. Being away from the land, the bridge still accommodates residential, overnight guests, liberal business, exhibitions, experience orientated activities, and museums. The lighting arrangement 136 for the bridge gives a historically unique impression for the place when viewed during the night. The bridge provides access to pure drinking water, where needs and consumption of water is achieved on the bridge itself without having access to the land. The combustion of waste by the incineration system 122 provides additional power capability for the utilities in the bridge. Overall, the bridge developments act as a historic achievement enabling industrialism development in the state, and acts as a ship with several facilities on the sea.
DK 2016 00571 A1
The foregoing examples have been provided merely for the purpose of explanation and are in no way to be construed as limiting of the present concept disclosed herein. While the concept has been described with reference to various embodiments, it is understood that the words, which have been used herein, are words of description and illustration, rather than words of limitation. Further, although the concept has been described herein with reference to particular means, materials, and embodiments, the concept is not intended to be limited to the particulars disclosed herein; rather, the concept extends to all functionally equivalent structures, methods and uses, such as are within the scope of the appended claims. Those skilled in the art, having the benefit of the teachings of this specification, may affect numerous modifications thereto and changes may be made without departing from the scope and spirit of the concept in its aspects.
DK 2016 00571 A1
权利要求:
Claims (10)
[1] 1. A bridge construction 100 on a waterway supported by a plurality of pillars 130, the bridge construction 100 comprising:
a first deck 102 comprising:
a rail track 108 and a central arch structure 110, wherein the rail track 108 configured to provide access to a plurality of interconnected wagons 106;
a pathway 112 formed along either side of the rail track configured to provide access to a pedestrian and a cyclist;
a second deck 104 comprising:
a plurality of containers 114 configured to provide an access for utilities selected from at least one of a hotel, a residence, a hospital, a police station, a prison, a museum, an educational zone, a business zone, an exhibition zone, a conference hall and a market zone;
a water surface 116 comprising:
an integrated power system 118 configured to provide power to the utilities of the first deck 102 and the second deck 104.
at least one incineration system 122 configured to heat the water and
DK 2016 00571 A1 a floating platform 124 configured to have a rescue area accessed via a maritime staircase 126 operably attached to the first deck 102 of the bridge.
[2] 2. The bridge construction of claim 1, wherein the floating platform 124 is configured to use selectively as a bathing island and a swimming pool.
[3] 3. The bridge construction of claim 1, wherein the central arch structure 110 comprises a plurality of arches made from a transparent material.
[4] 4. The bridge construction of claim 1, wherein the central arch structure 110 comprises a plurality of steel frames and spans configured to provide structural stability of the central arch structure 110.
[5] 5. The bridge construction of claim 1, further comprising a lighting system 108 configured to enhance the aesthetic appearance of the bridge.
[6] 6. The bridge construction of claim 1, wherein the plurality of pillars 130 supporting the bridge is configured to allow one or more ships 134 to pass through the bridge.
[7] 7. The bridge construction of claim 1, further comprises a water purification system configured to provide drinking water to the utilities of the bridge.
[8] 8. The bridge construction of claim 1, wherein the integrated power system 118 comprises a power source selected from at least one of a water turbine and a solar panel.
[9] 9. The bridge construction of claim 1, wherein the solar panels 120 are configured to arranged on a plurality of predetermined positions of the second deck 104.
DK 2016 00571 A1
[10] 10. The bridge construction of claim 1, wherein the wagon 106 is configured to provide access for at least one of a hospital, a security station and an emergency vehicle.
DK 2016 00571 A1
类似技术:
公开号 | 公开日 | 专利标题
US7866910B2|2011-01-11|Community intermodal transit system
CN202830734U|2013-03-27|Multifunctional gallery bridge
DK179211B1|2018-02-05|A Bridge Construction
CN102839599A|2012-12-26|Multifunctional corridor bridge
CN103696352B|2016-04-27|A kind of people&#39;s car separation dual-channel ecofallows commercial gallery bridge
Nuessgen2015|Urban Ropeways in Europe
CN203613447U|2014-05-28|Human and vehicle separated double-channel ecological leisure commercial covered bridge
CN203613448U|2014-05-28|Ecological-leisure commercial gallery bridge
Agustin et al.2014|The Application Of Sustainable Urban Street Concept In A. Yani Surabaya Street Corridor Arrangement To Improve The Quality Of Corridor Environment
Geng2012|The Construction of Public Leisure Space of Beijing-Hangzhou Grand Canal Hangzhou Section
Barrera-Fernández et al.2020|Tourist transformation of ports. cases from spain and UK
Da Fonseca2008|Footbridges in Portugal
Corcoran et al.2013|A river runs through them
El Din et al.2017|Strengthening Alexandria Urban Fabric by planning urbanism’s walkable area
Marcus et al.2010|Architectural Knowledge and Complex Urban Space
Hadi et al.2021|The percentage of humanization in the main walkway of the old city of Najaf, using GIS technique
Kempa et al.2019|Assessment of Inland Passenger Water Navigation in Bydgoszcz-Torun Functional Area and its Development Concept
Simeoni et al.2004|Narragansett Bay High Speed Ferry Network Phase 1–Site Selections and Site Designs
Paul2015|Ibom Cargo Seaport Terminal, Ibaka: A Study Of Passenger Circulation And Safety
Yamada2005|Minatomirai Line—Introduction to Stations
Petkar et al.2012|Urban Design Guidelines along BRT Route
Chan2001|The Next Generation of Singapore’s Public Space: The New Downtown
Chen et al.2012|The Interior Design Study on Modern Underground Stations in Europe Countries
Hall2013|Aquarama Terminal
Lai2011|Bridge the border: A border crossing complex across the Johor Strait
同族专利:
公开号 | 公开日
DK179211B1|2018-02-05|
EP3301224A1|2018-04-04|
DK179211B9|2018-04-16|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题

KR20130000636A|2011-06-23|2013-01-03|오승용|Bridge integrated building|
DE202015002676U1|2015-04-09|2015-05-13|Pfanner Schutzbekleidung Gmbh|System for overbuilding a highway or the like|
法律状态:
2019-04-14| PBP| Patent lapsed|Effective date: 20180929 |
优先权:
申请号 | 申请日 | 专利标题
DKPA201600571A|DK179211B9|2016-09-29|2016-09-29|A Bridge Construction|DKPA201600571A| DK179211B9|2016-09-29|2016-09-29|A Bridge Construction|
EP17193630.5A| EP3301224A1|2016-09-29|2017-09-28|A bridge construction|
[返回顶部]