专利摘要:
Fibre cement material, which contains organic fibres,is used as an additional raw material for the production of cement clinker. The cement clinker is produced in a system which comprises a cyclone tower (11) and a rotating drum kiln (15). The cyclone tower (11) comprises cyclones (1-5) and a pre-calciner unit (10) wherein fuel is combusted to feed the cyclone tower with heat. The raw clinker meal is passed through the cyclone tower to preheat it. By the combustion of the fuel in the pre- calciner unit (10) a hot zone is produced in the cyclone tower wherein the raw clinker meal is calcined. In order to be able to add larger amounts of the fibre cement material without causing a too high total organic carbon content of the exhaust gasses and/or without causing depositions of organic matter onto the inner walls of the cyclone tower (11), the organic fibre cement material is added in a dry powdered form in said hot zone, in particular in the pre-calciner unit (10) to be heated in less than 5 seconds to a temperature of at least 800°C.
公开号:AU2013213556A1
申请号:U2013213556
申请日:2013-01-28
公开日:2014-09-04
发明作者:Joris SCHOON;Luc Van Der Heyden
申请人:CBR CEMENTBEDRIJVEN NV;Cimenteries CBR Cementbedrijven NV SA;Redco N V SA;
IPC主号:C04B7-24
专利说明:
WO 2013/110810 PCT/EP2013/051577 USE OF ORGANIC FIBRE CEMENT AS A RAW MATERIAL IN THE PRODUCTION OF CEMENT CLINKER FIELD OF THE INVENTION 5 The present invention in general relates to the production of cement clinker wherein use is made of fibre cement material, which contains organic fibres, as a raw material in addition to the conventional raw materials which are used for the production of cement clinker. The cement clinker is produced in a system which 10 comprises a cyclone tower and a rotating drum kiln. The cyclone tower comprises heat exchanging cyclones and a pre-calciner unit wherein fuel is combusted to feed the cyclone tower with heat. The rotating drum kiln is heated by means of further fuel which produces a flame at the end of the rotating drum kiln. The raw clinker meal is passed through the 15 cyclone tower to preheat it. By the combustion of the fuel in the pre calciner unit a hot zone is produced in the cyclone tower wherein the raw clinker meal is heated to a temperature of at least 8000C in order to calcine the raw clinker meal. The heated and calcined raw clinker meal is fed from the cyclone tower into the rotating drum kiln wherein the raw 20 clinker meal is further heated to be molten and the molten raw clinker meal is subsequently cooled to produce the cement clinker. BACKGROUND In June 2005, the World Business Council for 25 Sustainable Development defined 5 Key Performance Indicators within the Cement Sustainability Initiative [J.S. Damtoft et al.]. These indicators cover various subjects like energy reduction and an increasing use of alternative raw materials, as well as the reduction of C0 2 -emissions that is becoming a key issue in the sustainable development of most 30 companies [H. Mikulcic et al.]. The high temperatures needed to obtain optimal reactivity in clinker kilns, typically about 1500 OC, are highly energy-consuming. The raw clinker meal is in particular to be molten WO 2013/110810 PCT/EP2013/051577 -2 partially to provide a liquid phase wherein sintering processes take place. In the current processes, the required energy is delivered by burning both traditional and alternative hydrocarbon fuels as well as and recovered fuel materials. Despite the significant C0 2 -emmissions related to the 5 combustion of these fuel materials, C0 2 -emissions are mainly generated by the use of limestone as the main raw material for clinker. Limestone, primarily consisting of CaCO 3 , will release C02 during decarbonation, delivering CaO as main constituent of alite (3CaO-SiO 2 ), belite (2CaO-SiO 2 ), aluminate (3CaO-Al 2
O
3 ) and ferrite (4CaO-Al 2
O
3 -Fe 2
O
3 ) 10 which are the major clinker phases. The use of alternative fuels based on recycled energy-rich materials or energy-rich non-marketable by-products of e.g. chemical processes is already well established in the cement industry. For example, US 5614016 (F.L. Smidth & Co A/S, Denmark,1997) and 15 US 2007/0122762 Al (Buzzi Unicem, USA, 2007) disclose the use of several kinds of waste materials which are substantially completely combustible and exothermic, preferably tires and plastics, mixed with the raw material feed and fed into a pre-calcining stage of a cement clinker production process. 20 On the other hand, the use of alternative raw materials based on recovered materials as replacement for limestone is less frequently implemented. Nevertheless, the replacement of limestone could minimize the effects of quarrying and improve the environmental impact by energy reduction as well as the reduction of C02 emission, by 25 acting as a non-carbonate CaO source. US2005/0066860 Al (T.J. Logan et al. USA, 2005) discloses the use of a mixture of organic waste material (preferably sewage sludge) and mineral by-products (preferably a coal combustion by-product such as fly ash, bottom ash, fluidized bed ash, boiler ash and 30 flue gas desulfurization by-products) in a cement manufacturing process, both as a fuel and combined with the raw material feed to the kiln. The inorganic material content is about 25 to 75 weight%. The mixture is used WO 2013/110810 PCT/EP2013/051577 -3 as a raw material feed in an amount of 10 to 50 weight% based on the total weight of the raw material feed. A fibre cement material is not mentioned, nor a method of production of a cement clinker. The use of fibre cement material, wherein the 5 fibres don't comprise organic fibres but asbestos fibres, in the production of cement clinker is disclosed in the article "Cement-bound asbestos products successfully disposed of and recycled in the clinker burning process", ZKG International, Bauverlag BV., Getersloh, DE, vol. 48, no. 11, 1 January 1995. Shredded asbestos cement sheets were fine-ground 10 to particle sizes corresponding to a cement raw meal. The asbestos cement meal was injected in the flame of a rotary kiln through the inner pipe of a multi-channel burner in a quantity corresponding to an input of 2% of the raw meal feed to a kiln plant. Due to the very high temperature of more than 16000C, the asbestos components were destructed. 15 Moreover, no asbestos fibres could be detected in the exhaust gas dust. A drawback of such a destruction method is that the heat exchanging properties of the cyclone tower are not used to preheat the asbestos cement material resulting in higher energy requirements of the kiln, especially when larger amounts of asbestos fibres would be used. 20 Indeed, at the flame of the rotary kiln a certain maximum temperature should be achieved in the clinker production process whilst the addition of relatively cold asbestos cement in this zone of the kiln reduces the temperature in that maximum temperature zone. In order to avoid fine milling of the fibre cement 25 material, in particular asbestos cement material, WO 98/02392 proposes to only crush the fibre cement material in order to obtain a coarser granulate which can be fed via the inlet feed end into the rotary kiln. Due to the high temperature of about 8000C at this inlet, no non-destroyed asbestos fibres were exhausted from the kiln. 30 A method, wherein organic fibre cement material is used as a raw material in the production of cement clinker in a cement manufacturing process as a supplemental source of raw material WO 2013/110810 PCT/EP2013/051577 -4 up to 2 weight% of the total weight of the meal, has been disclosed in Global Cement Magazine, October 2010, pp. 12-16. It is described that the fibre cement material is fed into a hopper from where it is fed into the feeder of a raw clinker meal mill, i.e. it is mixed with and processed along 5 with the conventional clinker meal. At said concentration of 2 weight%, it was concluded that the quality of the clinker still met all quality requirements, especially in terms of amounts of Al, Si, Ca and Fe, and to a lesser extent Mg, K, Na and S, and the emissions to the atmosphere at the kiln's chimney still met all emission limiting values as required by the 10 exploitation permit. An advantage of this method is that by adding to organic fibre cement waste material to the raw clinker materials before grinding them to produce the raw clinker meal, the organic fibre cement material is also preheated in the cyclone tower (which is heated by the kiln gas evacuated from the rotary kiln to recuperate the heat thereof) so 15 that the fibre cement waste material is added, in the same energy efficient way as the other raw materials, to the inlet at the top of the heat exchanging cyclone tower. The current application discloses however the effects of using large amounts of recuperated organic fibre cement 20 materials as alternative raw material for Portland clinker production and further describes possible boundary conditions and/or limitations. In particular adding larger amounts of organic fibre cement material either to the raw clinker meal feed or directly into the rotary kiln appeared to produce organic compounds which increase the total organic carbon 25 (TOC) content of the exhaust gasses from the clinker production installation and/or which may be deposited onto the inner walls of the cyclone tower (pre-heater). DESCRIPTION OF THE INVENTION 30 It is the object of the invention to provide a method for the production of cement clinker in a cement manufacturing process using organic fibre cement as a supplemental source of raw WO 2013/110810 PCT/EP2013/051577 -5 material, such that a cement clinker can be made based on more than 2 weight% of organic fibre cement material relative to the total weight of the raw material feed (= raw clinker meal and organic fibre cement material), without imparting neither the quality of the clinker, nor the emissions to 5 the atmosphere and without causing clogging/pollution of the cyclone tower. The inventors have now found that organic fibre cement can be used as a supplemental raw material for cement clinker production, in particular Portland cement clinker production, 10 wherein the cement clinker is produced in a system comprising a cyclone tower with heat exchanging cyclones and with a pre-calciner unit wherein fuel is combusted to feed the cyclone tower with heat and a rotating drum kiln which has at least one feed end and which is heated by means of further fuel. In this system the raw clinker meal is passed through the 15 cyclone tower to preheat it, the fuel is combusted in said pre-calciner unit to produce a hot zone in the cyclone tower wherein the raw clinker meal is heated to a temperature of at least 8000C to calcine it, the heated and calcined raw clinker meal is fed from the cyclone tower via the feed end of the rotating drum kiln into this rotating drum kiln wherein the raw 20 clinker meal is further heated to be molten and the molten raw clinker meal is subsequently cooled to produce the cement clinker. In order to enable the use of larger amounts of organic fibre cement material as supplemental raw material, in particular amounts of more than 2 weight% of fibre cement material relative to the total weight of the raw material 25 feed, the present inventors have found that the organic fibre cement material should be added to the raw clinker meal in the hot zone produced by the combustion in the pre-calcining unit and should be heated in this hot zone in less than 5 seconds to a temperature of at least 800 OC. 30 The organic fibre cement material is preferably added in a dry powdered form. In the present specification the term "dry" means that the material should at least be relatively dry, i.e. it should be WO 2013/110810 PCT/EP2013/051577 -6 at least air dry or it should comprise in particular less than 15 wt.%, more particularly less than 10 wt.% of water (not including the physically bonded water but not the chemically bonded water), based on the total weight of the material. At least 90 wt.% of the particles of the powdery 5 fibre cement material should preferably have a size smaller than 500 pm, preferably smaller than 200 pm and most preferably smaller than 100 pm (so that at least 90 wt.% of these particles pass through a sieve having openings of this size). In this application, it will further be shown that 10 organic fibre cement material is an interesting candidate for recycling, even at amounts over 50 weight% relative to the weight of the total feed, and that it can be used as supplemental raw material for clinker production, in particular Portland cement clinker production. The expected reduction of C02 emission as well as the potential energy gains 15 should have a positive effect on the sustainability of cement clinker production, in particular Portland cement clinker production. DETAILED DESCRIPTION OF THE INVENTION The present invention will now be described in 20 detail with regard to specific embodiments of the invention. It is understood that the described embodiments are intended only as illustrative examples and, therefore, that the invention is not limited thereto. According to a first aspect, the invention 25 relates to a method for the production of cement clinker in a system which comprises a cyclone tower followed by a rotating drum kiln. The cyclone tower comprises a number of cyclones (usually at least 4 or even at least 5) and a pre-calciner unit wherein fuel is combusted to feed the cyclone tower with heat (in addition to the heat supplied by the gas 30 coming from the rotating drum kiln and/or from the clinker cooling device, in particular from a grate cooler) to calcine the raw clinker meal at least partially. The rotating drum kiln has at least one feed end and is heated WO 2013/110810 PCT/EP2013/051577 -7 by means of further fuel producing a flame at the outlet end of the rotating drum kiln. In this clinker production method raw clinker meal is passed through said cyclone tower to preheat this clinker meal so that the size of the rotating drum kiln, and the energy requirements, can be reduced 5 considerably compared to systems without a pre-heater, in particular compared to so-called wet kilns or long dry kilns. By the combustion of said fuel in the pre-calciner unit a hot zone is moreover produced in the cyclone tower wherein the raw clinker meal is heated to a temperature of at least 8000C to calcine it. This calcination embraces at least a 10 decarbonation of the carbonates in the raw clinker meal so that preferably at least 90% of the carbonates in the raw clinker meal are decarbonated (converted into C02 and in the corresponding oxides). Since the decarbonation of the carbonates in the raw clinker meal requires a lot of energy, the provision of such a pre-calciner enables to further reduce the 15 length and energy requirements of the rotating drum kiln. The heated and calcined raw clinker meal which is heated and calcined in the cyclone tower is fed from this cyclone tower via the feed end of the rotating drum kiln into this rotating drum kiln. In this kiln, the raw clinker meal is further heated to be molten, more particularly in the liquid zone of the kiln where 20 the raw clinker meal is in a liquid phase wherein sintering processes take place, and the molten raw clinker meal is subsequently cooled to produce the cement clinker. The clinker production systems which comprise a pre calciner unit as in the method of the present invention comprises are so called calciner kilns which may be in line calciner (ILC) kilns or separate 25 line calciner (SLC) kilns. According to the invention, a fibre cement material containing organic fibres (i.e. an organic fibre cement material) is added in the hot zone which is produced by the combustion in the pre calciner unit to said raw clinker meal and is heated in this hot zone in less 30 than 5 seconds to a temperature of at least 8000C. By such a quick heating to such a high temperature, as will be demonstrated later, the organic material will rapidly (i.e. within seconds) decompose and be WO 2013/110810 PCT/EP2013/051577 -8 converted into C02 without the emission of undesirable amounts of total organic carbon (TOC). Within the context of the present application, when referring to organic fibre cement material or to fibre cement material 5 which comprises organic fibres, reference is made to a wide variety of composite materials comprising at least (i) Portland cement, typically a CEM I Portland cement, (ii) some mineral filler such as limestone flour and optionally a fine pozzolan, for example condensed silica fume (hereafter (i) + (ii) is called the inorganic material content of fibre cement 10 material), and (iii) a organic fibres or a mixture of several types of organic fibres, typically cellulose, polyvinyl alcohol (PVA) and polypropylene (PP) fibres (hereafter called the organic material content of the fibre cement material). Cellulose is the most common organic 15 compound on earth. About 33% of all plant matter is cellulose. The primary structure of cellulose is a linear polymer linked together by B 1,glycosidic connections. Polymerization degree can vary between 6000 and 8000 monomers but will decrease in fibre cement to a polymerization degree of 2000 by the presence of alkali from the Portland cement. For 20 the thermal decomposition mechanism of cellulose, there is no conclusive evidence to be found, but it's certain that four components are released : anhydrocellulose, tar (volatile components e.g. levoglucosan), Char (carbonized solid components) and gases (CO, CO 2 and CH 4 ). The decomposition reaction mechanism of Broido-Shafizadeh is generally 25 accepted as the most likely mechanism. The formation of each of the 4 components is influenced by the decomposition atmosphere, the heating rate, presence of alkali, etc. Polyvinyl Alcohol (PVA) has under inert atmosphere two distinctly different temperatures where weight loss 30 occurs during heating. The temperatures are affected by the heating rate but by extrapolation to a heating rate of 0 0 C/min, the temperatures can be established at 380 0 C for the first weight loss peak and 470 0 C for the WO 2013/110810 PCT/EP2013/051577 -9 second. In the first step, the dehydration of PVA will occur and high molecular weight single chain polyenes will be formed by chain cut / depolymerisation reactions what could already generate small quantities of acetaldehyde, acetone and furan. In the second step, an excess of 5 decomposition reactions will occur that liberate large quantities of acetaldehyde, acetic acid, acetone and furan and also by Diels-Alder cyclisation reactions, aromatic compounds can be formed (e.g. benzene). The decomposition mechanism of PP is very complex and varies greatly depending on the degree of polymerization, the decomposition 10 atmosphere, the heating rate, the polymer structure (isotactic, syndiotactic, atactic), etc. A long list of possible volatile degradation products could already be formed below a temperature of 150 OC. Furthermore chain cut / depolymerisation reactions will generate all kinds of polyenes who will by reducing polymerisation degree become volatile 15 and will be liberated in the gas stream of the kiln. It was found that thermal decomposition products from cellulose, PVA and PP are not completely degraded when they reach volatility at low temperature when they are introduced, e.g. mixed with the common raw material feed (the meal), and will be picked 20 up by the gas stream coming from the opposite end of the cement kiln. This causes blockage of the cyclone tower and generates an excess of the Total Organic Carbon emission limits at the chimney, especially in the preferred embodiments of the method of the present invention wherein fibre cement material is added in an amount of at least 2 wt.%, preferably 25 of at least 5 wt.% and more preferably of at least 10 wt.%, based on the total weight of raw clinker meal and fibre cement material. A solution to this problem was found to add the fibre cement raw material directly in the hot zone generated by the combustion in the pre-calciner unit to the raw clinker meal. In the method 30 of the present invention, cement clinker is produced in a system comprising a cyclone tower with cyclones and with a pre-calciner unit wherein fuel is combusted to feed the cyclone tower with heat and a WO 2013/110810 PCT/EP2013/051577 -10 rotating drum kiln which has at least one feed end and which is heated by means of further fuel. Raw clinker meal is passed through said cyclone tower to preheat it, said fuel is combusted in said pre-calciner unit to produce a hot zone in the cyclone tower wherein the raw clinker meal is 5 heated to a temperature of at least 8000C to calcine it, the heated and calcined raw clinker meal is fed from the cyclone tower via the feed end of the rotating drum kiln into this rotating drum kiln wherein the raw clinker meal is further heated to be molten and the molten raw clinker meal is subsequently cooled to produce the cement clinker. In 10 accordance with the present invention, the fibre cement material containing organic fibres is added in said hot zone to said raw clinker meal and is heated in said hot zone in less than 5 seconds to a temperature of at least 8000C Due to the high temperature in this hot zone of 15 the cyclone tower the fibre cement material is heated in this hot zone in less than 5 seconds (in particular 1 to 5 second), or even preferably in less than 2 seconds, to a temperature of at least 8000C. More preferably, the fibre cement material is heated in the hot zone to a temperature of at least 9000C, and this in particular also in less than 5 seconds or even in 20 less than 2 seconds. In this way, a nearly complete thermal degradation of the organic material in the fibre cement is obtained in a few seconds, for example 1 to 10 seconds. The organic matter is thus nearly completely thermally degraded and converted into C02 without the emission of significant amounts of TOC. Typically, using the method 25 according to the invention, at least 85 % of the organic material present in the fibre cement material is converted into C02 in the cyclone tower, in particular in the pre-calciner unit thereof, during those 1 to 5 seconds at a temperatures of at least 800 C. It is important that the amount of TOC remains within the emission limits as set by the law where the cement 30 clinker process plant is operated. In an advantageous embodiment, the fibre cement material is added in the pre-calciner unit itself to the raw clinker WO 2013/110810 PCT/EP2013/051577 - 11 meal. Due to the combustion of the fuel in this pre-calciner unit, the fibre cement material is very quickly heated to the required high temperature in this pre-calciner unit. In a further advantageous embodiment, the 5 fibre cement is added in a dry powdered form in said hot zone to said raw clinker material. Preferably, a rising gas stream is generated in the cyclone tower wherein the fibre cement material is dispersed in said dry powdered form. In practice a rising gas stream is generated in 10 the cyclone tower by means of one or more induced draft fans (ID fans) provided at the top of the cyclone tower. The fibre cement material which is supplied in a dry powdered form in this cyclone tower is thus finely dispersed in this gas stream thus ensuring an almost instantaneous heat transfer and thus a quick heating of the fibre cement material. In practice, 15 the flow of gas through the cyclone tower is controlled in such a manner that the gas contained in he rising gas stream passing through the pre calciner unit has a retention time of at least 2 seconds, preferably of at least 3 seconds, in this pre-calciner unit. In view of the quick decomposition of the organic matter in the powdery fibre cement material, 20 no or nearly no organic compounds will be exhausted from the cyclone tower by the gas stream passing therethrough. The flow rate of this gas stream is quite high since the raw clinker meal has to be kept suspended by this gas stream in the cyclone tower. Organic compounds produced by the decomposition of organic matter is thus quite quickly removed by this 25 gas stream so that a quick complete decomposition is required to avoid too high TOC values in the exhaust gases. A further advantage of dispersing the fibre cement material in the rising gas stream is that an intensive mixing with the raw clinker meal is achieved. A homogeneous material flow will thus 30 enter the rotary kiln, ready for the clinkering process, even when relatively large amounts of fibre cement material is added. When adding to fibre cement material to the rotary kiln, it would not be mixed so WO 2013/110810 PCT/EP2013/051577 -12 efficiently with the raw clinker meal so that the clinker forming chemical reactions would not take place correctly or at least not optimally. Moreover, the fibre cement material would not be heated quickly enough to the required high temperature so that organic compounds would be 5 produced which would be evacuated very quickly by the large draft of gases which are removed by the ID fan(s) out of the kiln. In modern kilns, which have low energy requirements, the raw clinker meal is always preheated in a cyclone tower and the rotating drum kiln is only heated by one flame at the end thereof. Feeding the organic fibre material at this 10 high temperature end of the rotating drum kiln to achieve a quick decomposition of the organic matter is not an appropriate solution as it would increase the energy requirements of the kiln, especially when larger amounts of organic fibre materials are used (since there in no preheating of these materials so that they lower the temperature of the 15 maximum temperature zone of the kiln), as it would be difficult to achieve the required intensive mixing of the raw materials and as by the short residence time of the fibre cement material in the kiln not all of the required chemical/physical conversions may have been achieved to obtain a high quality clinker material. 20 The fibre cement material is preferably lifted by the rising gas stream, in particular when this powdery fibre cement material is fed to a riser duct. When a fine particle is introduced in such a rising gas stream, there are in principle 2 forces acting on this particle. One is FG, the gravity force, and the other is FW, the dynamic lifting 25 force. The critical rising gas velocity, in which the particle will be lifted, can be calculated as follows; V= (4 x g x dp x pp / 3 x cw X PL )112 g =gravity force (9,815 m/s 2 ) dp = particle diameter in (m) 30 Pp = particle density (kg/m 3 ) Cw = friction factor based on the shape factor of particles PL = gas density in riser duct (m/s).
WO 2013/110810 PCT/EP2013/051577 -13 The fibre cement material is ground preferably to such a small particle size that the particles will be lifted in the rising gas stream, in particular flow from the riser duct towards the bottom cyclones. In a preferred embodiment, the fibre cement 5 material which is dispersed in a dry powdery form in the gas stream in the cyclone tower is removed from this gas stream by means of at least one of the heat exchanging cyclones and is supplied by this heat exchanging cyclone to the feed end of the rotating drum kiln. In a further preferred embodiment, oxygen is 10 supplied to the cyclone tower in such an amount that after the calcination (i.e. the decarbonation) of the raw clinker meal and the combustion of said fuel in the cyclone tower, the rising gas stream contains at least 2 vol.% and preferably at least 3 vol.% of oxygen. This ensures a substantially complete combustion of the fuel and also a substantially 15 complete decomposition of the organic matter contained in the organic fibre cement material. The organic fibre cement material is not a fuel but it is a raw material. It has indeed an inorganic material content of at least 80 dry weight %, preferably at least 85 dry weight % and more 20 preferably at least 90 dry weight %, based on the total dry weight of the fibre cement material. Although the fibre cement material has only a quite small organic matter content which can produce energy when it is decomposed by an exothermic reaction, it was found that the produced 25 amount of energy is higher than the amount of energy required to decarbonate the fibre cement material as it contains, in contrast to the conventional raw clinker materials, only a small amount of carbonates (produced by the natural carbonation of the cement materials). Consequently, it was found that this organic fibre material can be 30 effectively added to the higher temperature zone of the cyclone tower (at the downstream end thereof) without increasing the energy requirements of this cyclone tower. On the contrary, less energy is required. Moreover, WO 2013/110810 PCT/EP2013/051577 - 14 by feeding the fibre cement material at the bottom part of the cyclone tower, less raw clinker meal has to be fed at the top thereof so that a smaller gas stream is required reducing the ID fan power consumption and thus the energy requirements per ton clinker produced. In some 5 cases, where the ID fan is the limiting factor, a higher kiln-output can be achieved. According to one embodiment of the invention, the fibre cement materials are fibre cement sheets. Although typically between 4 mm and 6 mm, fibre cement sheets may have a range of 10 sizes. Sheets are the common products manufactured using fibre cement, commonly used as roofing slates and facade products, such as corrugated fibre cement sheets, fibre cement roofing slates, and medium or high density fibre cement boards. According to one embodiment, the fibre 15 cement materials are fibre cement sheets produced by Hatschek technology. The sheet formation principle in the so-called Hatschek machine resembles very much the principle of an old wet paper making machine. By means of a rotating sieve, thin layers of material (ca. 0.3 mm) are picked up from an aqueous suspension of cement, fibres, fillers 20 and water (ca. 80 to 120 g solids/ I of slurry), making up the fibre cement slurry. Usually, a Hatschek machine contains 3 to 4 sieves mounted in series. Fibre cement composites with varying thicknesses can be made by winding of several layers of these 3 to 4 monolayers holding composites on a so-called forming drum. The fresh sheet is optionally 25 post-compressed to densify or is optionally passed through a moulding station in order to make corrugated sheets or accessory fibre cement products.-The products harden by normal hydration of Portland cement at ambient pressure, hereafter indicated by "air-curing" or by means of hydrothermal calcium-silicate reactions, further indicated by "autoclaving". 30 Except for the crystalline portlandite, the products formed by normal hydration mainly concern calcium silicates with predominantly amorphous or cryptocrystalline nature. In the case of autoclaving, the calcium silicate WO 2013/110810 PCT/EP2013/051577 -15 reactions brought about in an atmosphere of saturated steam at 7 to 10 bar mainly lead to crystalline phases next to some less crystalline and even some XRD-amorphous materials. Most commonly used CaO sources are Portland cement and hydrated lime. Quartz is the preferred 5 SiO 2 source, but the silica present in the Portland cement also participates in the reactions. Using the method according to the invention, it is now possible to use much higher amounts of fibre cement material in the raw material as a feed for the production of cement clinker than the 10 amounts disclosed in the prior art. It was demonstrated that amounts as high as about 52 weight%, based on the total weight of the raw material feed could be used without imparting the quality of the clinker, especially in terms of amounts of Al, Si, Ca and Fe, and to a lesser extent Mg, K, Na and S, while the emissions to the atmosphere at the kiln's chimney still 15 met all emission limiting values as required by the exploitation permit. Hence, according to one embodiment, an amount of fibre cement material is used ranging between 0.001 and 80 weight%, preferably, between 1 and 20 weight%, relative to the total weight of the raw material feed. 20 In the following, the cement clinker manufacturing process will be described briefly. Cement clinker is manufactured by blending limestone (CaCO 3 ) with clay and other mineral ingredients such as sand and iron to create a raw material feed (meal). After being preheated and pre-calcined in a cyclone tower, the raw 25 material feed is introduced into a rotating drum kiln. A rotating drum kiln is basically a rotating cylinder lined with heat-resistant bricks. The raw material feed is fed into the higher, elevated or "cold" end of the kiln, typically at a temperature of about 800 0C. As the kiln slowly rotates, the raw material feed tumbles down towards the lower of "hot" end of the kiln 30 where a flame is burning, fed by classical energetic materials, such as coal, oil, petroleum coke, natural gas or energetically rich waste materials such as waste paints, solvents, tires and plastics, typically at a WO 2013/110810 PCT/EP2013/051577 -16 temperature of about 1450 OC. When passing through the cyclone towere and during its descend through the rotating drum kiln, gradually, the physical and chemical properties are altered, one of which is the calcination of the limestone (e.g. conversion of limestone into lime (CaO), 5 liberating C02) and the calcined mixture is molten. The smelt is cooled as it exits the kiln and precipitates as clinker. Subsequently, clinker is finely ground, often with a small amount of gypsum, to produce cement. Basically, there are two types of cement clinker manufacturing processes : the wet process and the dry process. 10 In the wet process, raw material in a powdered or granular form is blended with water to produce an aqueous slurry which is pumped directly into the cold end of the rotating drum kiln (there is no pre-heater cyclone tower). The slurrying process helps homogenizing the material. The wet process is the most energy-intensive because the water must be 15 evaporated out of the slurry. In the dry process the raw material is fed into the kiln in a relatively dry powdered or granular form. Basically, there are three embodiments of the dry process, using either a pre-heater unit or a pre-calciner unit in front of a rotating kiln, or a long dry kiln. A pre-heater 20 unit features a tower of heat-exchanging cyclones. The raw material is fed into the pre-heater unit in a dry powdered form to achieve a temperature of at least 800 0C where it is pre-heated by the hot exit gases exiting of the upper end of the rotating kiln, before the raw material enters the rotating kiln. A pre-calciner unit is similar to a pre-heater unit, 25 except that in the cyclone tower a separate combustion is provided which promotes further calcination of the raw material at a temperature of at least 800 C. In a long dry kiln, dry raw material is fed directly into the upper end of the rotating drum kiln. Such a long dry kiln is provided with a mid-kiln feed opening, usually used to feed fuel to the kiln at a 30 temperature of at least 800 OC. The invention is also related to a method for the production of cement clinker in a system comprising a heated rotating WO 2013/110810 PCT/EP2013/051577 -17 drum kiln having at least one feed end for receiving a raw material feed, wherein fibre cement material, which comprises organic fibres, is introduced into said feed end of said kiln. The system further comprises a pre-calciner unit having an inlet end and an outlet end communicating 5 with the feed end of the kiln, the pre-calciner operable to partially or fully calcinate a raw material feed passing from the inlet end of the pre calciner unit into the feed end of the kiln. In this method, the fibre cement material is introduced into the pre-calciner unit in a hot zone which is at a temperature of at least 8000C. The fibre cement material is thus added to 10 the raw material feed in the pre-calciner unit. Advantageously, the fibre cement material is heated up to the temperature of said hot zone in 1 to 5 seconds, preferably in less than 2 seconds. Preferably, the fibre cement material is 15 introduced into said pre-calciner unit is a dry powdered form. The invention will now be substantiated using experiments. The following figures are referred to: LIST OF FIGURES 20 Figure 1: CaO [weight%] in function of SiO 2 [weight%] without Loss of Ignition (950 0C) of Air-cured Fibre cement materials. The arrow marks the selected Air-cured Fibre cement sample ARM/RS/S7. 25 Figure 2: CaO [weight%] in function of SiO 2 [weight%] without Loss of Ignition (950 OC) of Autoclaved Fibre cement materials. The arrows mark the selected Autoclaved Fibre cement samples ARM/HD/S8 and ARM/MD/S5. 30 WO 2013/110810 PCT/EP2013/051577 -18 Figure 3: Evolution of the Composition of Air-cured Fibre cement Roofing Slates produced in Eternit Kapelle o/d Bos (Belgium). 5 Figure 4: Increasing clogging Levels in function of SO 3 [weight%] and Cl [weight%] of Hot Clinker Meal. Figure 5: Circulation diagram of volatiles by gas and HCM stream (X=[S0 3 ], [CI], [Na 2 O], [K 2 0] of the HCM). 10 Figure 6: TGA/DTA analysis of Air-cured Fibre cement Roofing Slates (RS). Figure 7: TGA/DTA analysis of Autoclaved High Density Fibre 15 cement materials (HD). Figure 8: Compositions, H 2 0 weight%, Decarb E and gross calorific values + net calorific values of the organic fibres of cold clinker meals for CBR Lixhe and the used Air-cured Fibre 20 cement Roofing Slate ARM sample (ARM/RS/S7). Figure 9: Compositions, H 2 O weight%, Decarb E and gross calorific values + net calorific values of the organic fibres of cold clinker meals for CBR Antoing and the used autoclaved 25 High Density Fibre cement ARM sample (ARM/HD/S8). Figure 10: Endothermal dehydration energies for Portland based cement pastes. 30 Figure 11: Integral calculation of the CO and CO 2 measurement graphs of air-cured and autoclaved samples measured by
MS.
WO 2013/110810 PCT/EP2013/051577 -19 Figure 12: GC-MS measurement from bottom to top at 3900C, 5000C and 8000C (air cured). Figure 13: GC-MS measurement from bottom to top at 3900C, 5000C 5 and 8000C (autoclaved). Figure 14: Schematic representation of an in-line calciner kiln. As appears from the above description, the method of the present invention is to be performed in a kiln which 10 comprises a pre-calciner unit creating the hot zone wherein the fibre cement material is to be added to the raw clinker meal. Such kilns are most advantageous from the point of view of energy consumption and enable the most efficient use of the organic fibre cement materials, also in quite large relative amounts thereof. 15 In practice there are different types of cement clinker installations which comprise a pre-calciner unit, namely In-Line Calciners (ILC) and Separate Line Calciners (SLC). More particularly, the present invention can be applied to so-called pre-heater kilns, air through calciners, inline calciners, inline calciners with burning chamber and air 20 separate calciners. Such installations are well known to the skilled person so that only as an example an in-line calciner will be described shortly hereinafter. As illustrated schematically in Figure 14, an in line calciner comprises a number of cyclones, in this case five cyclones 1 25 to 5 connected by means of four riser ducts 6 to 9, and a pre-calciner unit 10 forming together a heat exchanging cyclone tower 11. By means of an induced draft fan (ID fan) in the exhaust pipe 12, a rising gas stream is generated in the cyclone tower 11. The raw clinker meal is normally introduced in the riser duct 6 between the second cyclone 2 and the first 30 cyclone 1. After having passed the cyclone tower 11 the heated and at least partially calcined (decarbonated) raw clinker meal is led via a kiln feed pipe 13 to the feed end 14 of the rotating drum kiln 15. Since it has WO 2013/110810 PCT/EP2013/051577 - 20 passed the pre-calciner unit 10, wherein a temperature in the range of 870 - 9000C is generated, the degree of calcination of the material introduced in the rotating drum kiln 15 is between 90 and 95%. The material is then transported through the kiln 15 by the combination of the 5 kiln inclination and the rotating movement thereof. At the end of the rotating drum kiln 15 a burner is provided producing a flame with air supplied through this burner in the kiln as indicated by arrow 19. As the material approaches the flame, the material temperature rises and clinkerisation occurs. Upon leaving the kiln, the material discharges onto 10 a grate cooler 16 where it exchanges heat with secondary air so as to be cooled to produce the cement clinker. In the present specification, the term pre calciner unit 10 has to be understood as including not only the actual pre calciner vessel but also the riser duct leading towards the last cyclone 5 15 before the rotating drum kiln 15 since it forms one volume with the cavity of the actual pre-calciner vessel and a same high calcining temperature prevails therein so that the material passing through the pre-calciner vessel is further calcined in the riser duct part of the pre-calciner unit 10. In order to heat this pre-calciner unit 10, and to generate a rising gas 20 stream therein, combustion gases produced by the combustion in the rotating drum kiln 15, i.e. kiln gas which has a temperature of about 10000C, is guided through the kiln riser duct 17 to the bottom of the pre calciner unit 10. Moreover, tertiary air, heated in the grate cooler 16 to a temperature of about 750 - 9000C, is also guided, by a tertiary air duct 25 18, to the pre-calciner unit 10. This tertiary air enters the pre-calciner unit 10 tangentially to create a moderate swirl ensuring an effective mixing of fuel, raw meal and gas. The temperature in the pre-calciner unit 10 is further controlled by means of a burner supplied with fuel and with primary air. The air for combustion of the fuel in the pre-calciner unit thus 30 consists of kiln gas, tertiary air from the cooler and fuel conveying/atomising air supplied through the pre-calciner burner in the pre-calciner unit as indicated by arrow 20. About 55 to 60% of the fuel is WO 2013/110810 PCT/EP2013/051577 - 21 supplied to the pre-calciner burner whilst the remaining amount of fuel (40 to 45%) is supplied to the kiln burner. In the method of the present invention, organic fibre cement material is added, in a dry powdered form, to the raw clinker 5 meal. The organic cement fibre is added to this raw clinker meal in a hot zone in the cyclone tower where the organic fibre material is heated quickly, in less than 5 seconds, to a temperature of at least 8000C. The organic cement fibre is preferably added in the pre-calciner unit 10, more particularly in the vessel 1 0a of the pre-calciner unit 10 or in the riser duct 10 10b of this pre-calciner unit 10 leading from this vessel towards a final cyclone. In this way, it is dispersed in the rising and swirling gas stream in the pre-calciner unit and an instantaneous heat transfer is achieved. Heating is moreover accelerated by the high temperature of the fuel which is combusted in the pre-calciner unit. In fact, the organic fibre 15 material passes the combustion zone of this fuel so that it is heated, in less than 5 seconds or even in less than 2 seconds, to a temperature of at least 9000C. Instead of feeding the organic fibre cement material directly into the pre-calciner unit 10, it can also be fed therein via 20 the kiln riser duct 17. In fact, by the rising gas stream in this kiln riser duct 17, the organic fibre cement powder is immediately carried along into the pre-calciner unit 17 where it is added, in the hot zone within the pre calciner unit 10, to the raw clinker meal. 25 EXPERIMENTAL 1 Materials and Methods 1.1. Classic Raw Materials (CRM) As representative CRM, materials are selected that 30 are used at a daily base in three reference clinker factories. These factories are CBR Antoing (CRM/Ant) and CBR Lixhe (CRM/Lxh) in Belgium and ENCI Maastricht (CRM/Maa) in the Netherlands, all WO 2013/110810 PCT/EP2013/051577 - 22 belonging to the Heidelberg Benelux group. From each of these three grey Portland clinker factories, four of their most important CRM were collected, more specifically those that act as the main sources of the four critical metal oxides in clinker: CaO, SiO 2 , A1 2 0 3 and Fe 2
O
3 . CBR Antoing 5 uses two kinds of limestone : Rich (CFM/Ant/CR) and Poor (CFM/Ant/CP). These act as CaO and SiO 2 sources. CBR Lixhe uses Tufa (CFM/Lxh/Tu) and Loam (CFM/Lxh/Lo), ENCI Maastricht a typical Marl (CFM/Lxh/Ma) and Sabulous Clay (CFM/Lxh/SC) as CaO and SiO 2 source respectively. All 3 factories use Fly Ash (CFM/Ant,Lxh,Maa/FA) as 10 A1 2
O
3 source and an artificially produced Fe 2
O
3 source (CFM/Ant,Lxh,Maa/IC). All four of the CRM from each clinker factory were sampled at three different instances. To generate representative samples, the separate samples from each factory were homogenised. These representative samples were grinded for 2 minutes in a 15 Siebtechnic disc mill to obtain sufficient fineness to perform analytical testing. The average chemical analysis of the limestones, as measured by XRF is presented in Table 1. Table 1: Average Chemical analysis of the Limestones of CBR Antoing 20 (Ant), CBR Lixhe (Lxh) and ENCI Maastricht (Maa) in weight%. CRM CRM/Ant/PL CRM/Ant/RL CRM/Lxh/Tu CRM/Maa/Ma CaO 42.9 50.1 51.8 50.8 SiO 2 15.1 6.4 4.7 7.1 A1 2
O
3 2.2 0.9 0.4 0.8 Fe 2
O
3 0.9 0.4 0.3 0.4
K
2 O 0.68 0.21 0.07 0.13 Na 2 O 0.25 0.25 0.02 0.20
SO
3 0.90 0.57 0.09 0.21 MgO 1.1 0.9 0.7 0.8 Cl - - 0.011 LOI 975 0 C (0 2 ) 35.04 40.18 42.03 40.18 WO 2013/110810 PCT/EP2013/051577 - 23 1.2. Alternative Raw Material (ARM): Fibre cement The fibre cement materials used for this investigation were taken from four different production lines, corresponding with two roofing products, Corrugated fibre cement Sheets (ARM/CS) and fibre cement Roofing 5 Slates (ARM/RS), and two facade products, Medium Density fibre cement boards (ARM/MD) resp. High Density fibre cement boards (ARM/HD). The roofing products concern air-cured products whereas the facade products are autoclaved. The air-cured products have very similar formulations and contain synthetic reinforcement fibres (Polyvinyl Alcohol 10 and Polypropylene), process fibre (cellulose), Portland cement, pozzolanic and inert filler. The corrugated sheets (ARM/CS) contain twice as much pozzolanic filler as the slates (ARM/RS). The final corrugated sheet density amounts to values between 1.45 and 1.50 g/cm 3 . In case of the slates, the density is about 1.85 g/cm 3 . The autoclaved products 15 mainly contain cellulose reinforcement and cellulose process fibres, Portland cement, quartz flour and some stabilizing agent. Furthermore, they each contain some product-specific additional functional mineral filler(s). The product's final density amounts to respectively 1.30 and 1.85 g/cm 3 for Medium Density fibre cement boards (ARM/MD) and High 20 Density fibre cement boards (ARM/HD) respectively. For each ARM source, material was recovered at 24 different points of time spread over 6 months after which they were 2 by 2 homogenised. After crushing in a Retsch cutting mill those samples were ground for 1 minute in a Siebtechnic disc mill to obtain sufficient fineness. For each of the 4 types 25 of fibre cement product, the average chemical analysis determined by XRF of the 12 samples is presented in Table 2.
WO 2013/110810 PCT/EP2013/051577 - 24 Table 2: Average chemical analysis of the fibre cement materials in weight% Corrugated Fibre cement Autoclaved High Autoclaved Medium Fibre ARM Roofing Density Fibre Density Fibre cement cement Slates cement Boards Boards Sheets ARM/CS ARM/RS ARM/HD ARM/MD CaO 51.24 52.14 28.55 25.01 SiO 2 18.85 18.42 44.2 51.06 A1 2 0 3 2.80 3.55 5.95 4.95 Fe 2 0 3 2.52 3.15 2.37 1.74
K
2 0 0.37 0.28 0.22 0.15 Na 2 0 0.20 0.17 0.06 0.12 S03 1.87 1.35 0.69 0.61 MgO 1.38 1.57 0.59 0.71 TiO 2 0.25 0.43 0.34 0.38
P
2 0 5 0.44 0.31 0.16 0.18 CI 0.03 0.01 0.01 0.01 LOI 9750C 19.65 18.11 16.13 14.83 (02) Ctotai 3.94 4.10 3.66 3.44 Stotai 0.86 0.66 0.33 0.31 The mutual relationship between the CaO and the SiO 2 content is 5 graphically illustrated in Figures 1 and 2 for the air-cured and autoclaved products respectively. Figure 3 illustrates how the compound composition of the roofing slates (air-cured) applied at the fibre cement plant from which the samples for this study were taken, has evolved through the years since the change-over to non-asbestos products. Based on Figure 10 3, we may conclude that fibre cement product-selective recycling will generate an alternative raw material with a low chemical variation over time.
WO 2013/110810 PCT/EP2013/051577 - 25 1.3. Testing of raw materials, clinker and cement properties To prepare the different CCM compositions, all raw materials were crushed in advance in a Siebtechnic Disc mill. The calculated dosage to 5 achieve 500 g of CCM were brought together in a vessel used for the analysis of the micro-Deval abrasion resistance. This procedure was used to homogenise as good as possible the raw meal before it was thermally treated in a kiln. Before sintering, the different CCM compositions were first granulated on granulation plates (5 mm holes). 10 The sintering was performed in an electric high temperature static kiln (Carbolite BLF1800) to 14500C at a constant heating rate (10 0 C/min). The Hot Clinker Meals (HCM) were maintained for 1h at 14500C after which they were immediately air-cooled to room temperature by open air to form the final clinker. XRF analyses were performed on a Philips 15 PW2404 in accordance with EN 197-2 to chemically characterise the classic (CRM) and alternative raw materials (ARM), all cold clinker meals (CCM) and final clinkers. For the analysis of the total C and S, a Leco CS230 was used. A Netzsch STA 449F3 was used to evaluate by TGA/DTA measurement all the CRM and selected ARM as well as all the 20 CCM compositions on their thermal decomposition mechanism as also on the energy required during their heating up to 14500C and were performed in an atmosphere of 5 V% 02 and 95 V% N 2 which corresponds with the typical V% 02 in the atmosphere of a clinker kiln. A Mettler Toledo Star TGA/DTA was used to evaluate the same materials in 25 a pure N 2 gas atmosphere, as also to evaluate by TGA/DTA the cement pastes described in Paragraph 3.2 in an atmosphere of 5 V% 02 and 95 V% N 2 . As heating rate, 10 0 C/min was chosen for both devices which gave the best resolution for evaluation of the graphs. Of course, an industrial clinker process will exhibit a much higher heating rate, e.g. 30 600 0 C/min in a cyclone tower, most probably resulting in other reaction products for heating rate sensitive compounds like the organic fibres in the ARM. XRD analyses were performed on a Bruker D8 ADVANCE WO 2013/110810 PCT/EP2013/051577 - 26 refined by Rietveld method to mineralogically characterise all the final clinkers. These analyses were only performed on the Final Clinkers. An IKA Calorimeter system C7000 was used to measure the gross calorific values of the CCM and the selected fibre cement ARM in accordance 5 with ISO 1928. A Mettler Toledo Star DSC was used to determine the required energy for the liberation of chemically bound H 2 0 on the cement pastes described in Paragraph 3.2. Four pastes were made out of 450 g CEM I type cement and W/C ratios of 0.25, 0.30, and 0.35. To obtain the paste with the lowest W/C ratio (0.18), a paste with a W/C ratio of 0.21 10 was made, which was subsequently filtered off in view of obtaining a still lower W/C ratio. The pastes were stored for 28 days at 20 ± 1 0 C hermetically wrapped in plastic and were afterwards dried at 105 0 C at the respective curing times that had been selected. For the analysis of the formed volatiles after thermal degradation of the organic fibres in fibre 15 cement ARM, a Varian GC (3900) - MS (Saturn 21 OOT) was used and for the formed gases, a MS Balzers Quadstar 422. 2 Theory/Calculation 20 2.1. Chemical and Mineraloqical limitations of each reference clinker and clinker kiln For each clinker factory, the chemical and mineralogical data of the clinkers produced in the first 6 months of 2011, was used to define the reference clinker of each clinker factory (Table 3).
WO 2013/110810 PCT/EP2013/051577 - 27 Table 3: The average chemical composition of the reference clinker of each clinker factory in weight% Clinker Antoing Lixhe Maastricht Average Average Average CaO 65.90 65.87 64.92 SiO 2 21.42 21.42 20.40 A1 2 0 3 4.44 4.84 5.01 Fe 2
O
3 2.61 3.65 3.52
K
2 0 0.74 0.57 0.47 Na 2 O 0.21 0.30 0.34 S03 1.21 0.51 0.92 MgO 1.70 2.01 2.08 Cl 0.068 0.017 0.020 CaO free 1.46 0.55 2.33 LSFMgO 98.24 98.19 98.20 C3A 7.35 6.65 7.33 LiqSimple 19.18 22.73 22.97 To prevent undesirable effects on both the clinker production process as 5 well as on the clinker quality and to remain within the framework of the cement standards, chemical and mineralogical limits specific for each clinker factory were defined and used to evaluate the feasibility of applying fibre cement as an alternative raw material (Table 4).
WO 2013/110810 PCT/EP2013/051577 - 28 Table 4: Chemical and mineralogical limitations on the final clinker in weight% Clinker Antoing Lixhe Maastricht Cl x < 0.08 x < 0.08 x < 0.08
SO
3 x < 1.4 x < 1.2 x < 1.1 Na 2 Oeq x < 1.2 x < 1.2 x < 1.2 MgO x < 4.0 x < 4.0 x < 4.0 DoS-level 80.0 < x < 120.0 80.0 < x < 120.0 80.0 < x < 120.0 LSFMgO 98.5 < x < 98.5 98.5 < x < 98.5 98.5 < x < 98.5
C
3 A 7.4 < x < 7.4 6.7 < x < 6.7 7.3 < x < 7.3 LiqSimple 19.2 < x < 19.2 22.7 < x < 22.7 23.0 < x < 23.0 5 One of possible problems in a clinker kiln concerns clogging of material on the sides of the kiln, by which the smooth operation of the clinker kiln can be disturbed. This explains why the SO 3 , Na 2 Oeq and Cl contents of the clinkers produced in the three reference clinker factories have to meet even stricter limits than those required in order to be in line with the 10 cement standards.
SO
3 [weight%] is the general form to describe all SO42- [weight%] present in clinker or cement. S042- can occur mineralogically in Portland clinker in different forms with their own specific solubility and will be particularly present in the alite (C 3 S) and belite (C 2 S) phases. SO 3 will generally be 15 formed after oxidation of S compounds in a clinker kiln. High concentrations of S are often present in pet coke fuel where contents up to 3 to 6 weight% are commonly found. When taking into account their respective dosages in the raw meal mixture, also limestone, clay or blast furnace slag, used as raw materials, can bring significant levels of S or 20 SO 3 in clinker, like can be noted in Table 1. In an alkali-rich environment, mainly installed by Na and K from the raw materials, these sulphates can be found particularly in the form of alkali sulphates. If no sufficient SO 3 content is available to combine all Na and K into sulphates, the majority WO 2013/110810 PCT/EP2013/051577 - 29 of the free alkali will be built into the Belite phase. The free alkali will increase viscosity of the melt and decrease the formation of Alite. Also an excess of alkali emitted to the gas phase of a clinker kiln by its high volatility, will make that clogging phenomena will appear faster. This 5 could lead to faster wear of the refractory bricks. However when the amount of SO 3 strongly exceeds the amount that can be bound by the alkali, CaSO 4 will be formed, whereas in the case of a moderate excess of SO 3 several other forms of alkali sulphates will dominate like arcanite, aphihitalite, thenardite and calcium langbeinite. In addition an imbalance 10 between alkali and SO 3 could damage the furnace process and have negative influences on the clinker quality and by that on the final cement hydration. Like described above, a stoichiometric balance is imposed, expressed as the so called DoS value calculated by equation (1) using the chemical analysis of the final clinker. 15 DoS = 77.41-SO 3 / (Na 2
O+K
2 0-0.658) (1) DoS levels between 80 to 120 weight% are recommended and therefore implemented in the three factories. For this reason these DoS levels will 20 be retained in all simulations presented in this work. Increasing levels of Cl as well as SO 3 have increasing levels in the gas phase of a clinker kiln increase clogging and therefore disturbed process. As shown in Figure 4, based on the Cl [weight%] and SO 3 [weight%] present in the Hot Clinker Meal (HCM) the risk for kiln clogging/coating can be evaluated, and 25 classified (Little Coating, Frequent Cleaning Required, Bypass Advisable). Each factory is different with regard to its clinker raw meal materials and technical installations. How these differences work out on the Cl and SO 3 (and alkaline) content of final clinker is described by the so-called enrichment factor (E). Further, levels of Cl and SO 3 can be 30 lowered by the presence of a bypass installation () which allows for higher content of Cl and SO 3 of the Hot Clinker Meal (HCM). These considerations are described in Figure 5 and by the linear equation (2) WO 2013/110810 PCT/EP2013/051577 - 30 which will be used in the simulation program described in paragraph 2.3. [X]HCM = [X]CCM + Ex - [X]HCM - Px- Ex - [X]HCM = [X]CCM / [1 - ExE- (1 - $x)] (2) 5 (X=CI, SO 3
,K
2 0 or Na 2 O) Based on this assumption, limits on Cl and SO 3 can be set for the Final Clinker. If exceeded, this will result in disturbances in the function of the kiln. The introduction of fibre cement materials will not markedly change the Cl content of the kiln feed because the Cl content of fibre cement 10 ARM is very low and in line with the other CRM. Actually, Cl is especially brought in by fuel materials such as waste oils, tires, plastics, animal meals, etc. In the present investigation the fuel mix is not adapted. So instead of putting a limitation on a parameter in that SO 3 and Cl are taken into account, the requirement by which "safe" combinations of SO 3 and Cl 15 contents are guaranteed can be simplified to a SO 3 limitation (max) on the raw meal as listed for each clinker factory in Table 4. These SO 3 limitations were derived from Figure 4 by using equation (2) for SO 3 and Cl with the specific E and P factors of each clinker kiln and the average Cl of each reference clinker (Table 2). With respect to the mineralogy of the 20 final clinker, limits are defined for the following 3 parameters: C 3 A, Lime Saturation Factor (LSF) and the liquid phase (LiqSimple) [5]. The limits on these mineralogical limits are actually merely chemical limitations related to the contents of the 4 most important metal oxides in the clinker (CaO, SiO 2 , A1 2
O
3 and Fe 2
O
3 ). The LSFMgO governs the ratio of alite 25 and belite and concerns a refined version of the normal Lime Saturation Factor, by the fact that it holds a correction for the incorporation of MgO in C 3 S. In equation (3) also the presence of free lime is taken into account. 30 LSFMgO 100 - (CaO CaOfree+0.75-MgO)/(2.8-SiO 2 +1.18-Al 2
O
3 +0.65-Fe 2
O
3 ) (3) WO 2013/110810 PCT/EP2013/051577 -31 The approximative calculation of the C 3 A content is done by a commonly known Bogue calculation described in equation (4).
C
3 A = (2.650-Al 2
O
3 -1.692-Fe 2
O
3 ) (4) 5 The composition of the liquid at 14500C is to a high extent governed by the ratio of A1 2 0 3 to Fe 2
O
3 . In the simulations of the present study the combined influence of these 2 components is expressed by means of a parameter defined by the simplified equation (5). 10 LiqSimple = (3-Al 2
O
3 +2.25-Fe 2
O
3 ) (5) By limiting the-three above parameters for the final clinker, the 4 metal oxides are sufficiently anchored within a safe zone for each factory. Actually, in the present study, the 3 parameters were each given fixed, 15 but factory dependent, values as displayed in Table 4. Also MgO has to be monitored because of its limitation within the cement standards. Though this parameter was not critical in this investigation as levels were very low. 20 2.2. Emissions and energy consumption The diversity of compounds that the organic materials of fibre cement can liberate by heating them up to 1450 0C makes it almost impossible to quantify these compounds completely. With thermogravimetric analysis (TGA) / differential thermal analysis (DTA), gas chromatography-mass 25 spectrometry (GC-MS) and mass spectrometry (MS) measurements, an effort is made to analyse the organic compounds formed after thermal degradation at specific temperatures. A specific test setup was designed to heat the selected fibre cement samples as fast as possible up to a specific temperature. The selection of the temperatures considered for 30 these tests resulted from the evaluation of the TGA/DTA analyses and the literature study on the decomposition of the organic fibres present in the fibre cement ARM. In this specific test a quartz reactor is loaded with WO 2013/110810 PCT/EP2013/051577 - 32 400 mg of sample under a gas flow of 95 V% He and 5 V% 02 connected to a GC-MS to measure the volatiles with a high molecular weight and to a MS to measure the gases with a low molecular weight. The recipient was preheated to heat up the sample as fast as possible to the selected 5 temperature after which, over a period of 5 minutes, all gases and volatiles generated, were measured. The heating rate as well as the V% 02 in the surrounding gas flow was set to be comparable with those present in a real clinker kiln. The knowledge of the amount as well as the nature of these volatiles and gases is important in view of the 10 determination of the ideal point of introduction of the fibre cement ARM in the clinker kiln. Because organic compounds are present in the fibre cement ARM and an additional energetic benefit is expected from the reduced endothermic decarbonation part, it is interesting to comparatively evaluate the energy necessary to heat the classic cold clinker meal up to 15 1450 0C, with that necessary for doing the same but with alternative cold clinker meal. TGA/DTA and calorimetric measurements were performed to give an idea of this possible energetic gain. On the other hand, the presence of chemically bound H 2 0 in the fibre cement ARM also implies loss of energy while heating. The energy required to liberate the 20 chemically bound H 2 0 is not so easy to quantify because of a variety of hydration products that are generated upon the hydration of cement. By performing DSC analyses on cement pastes with different W/C ratios like those described in paragraph 1.3., an effort is made to estimate the required energy to liberate the chemically bound H 2 0. The pastes are 25 made with the CEM I cement presently used at the fibre cement plant from that the fibre cement production waste for this study was taken to produce fibre cement. 2.3. Different clinker feed calculations and preparations 30 Of each factory, a simulation program based on linear equations calculated raw meal compositions (CCM/Ant,Lxh,Maa/Ref) in line with the chemical and mineralogical requirements listed in Table 4. These WO 2013/110810 PCT/EP2013/051577 - 33 compositions indicated as Classic cold Clinker Meals (CCM) are very close to the compositions actually used in these factories. The composition of the raw materials was merely adjusted to obtain the mineralogical settings, but without taking into account the ashes of the 5 fuels that will actually be used to heat up the clinker meal. The compositions of these classic Cold Clinker Meals are presented in Table 5. Table 5: Compositions of the different clinkers made to be fed to the 10 Static Kiln. CRM+ARM Quantity CRM+ARM Quantity CRM+ARM Quantity (weight%) (weight%) (weight%) CRM/Ant/CP 55.25 CRM/Lxh/Tu 79.44 CRM/Maa/Ma 84.38 CRM/Ant/CR 37.50 CRM/Lxh/Li 6.63 CRM/Maa/SC 2.90 CCM/Ant/Ref CRM/Ant/FA 6.38 CCM/Lxh/Ref CRM/Lxg/FA 12.34 CCM/Maa/Ref CRM/Maa/FA 11.02 CRM/Ant/IC 0.87 CRM/Lxh/IC 1.59 CRM/Maa/IC 1.70 ARM/HD/S8 0.00 ARM/RS/S7 0.00 ARM/MD/S5 0.00 Sum 100.00 Sum 100.00 Sum 100.00 CRM/Ant/CP 0.00 CRM/Lxh/Tu 38.52 CRM/Maa/Ma 81.89 CRM/Ant/CR 79.08 CRM/Lxh/Li 0.00 CRM/Maa/SC 0.00 CRM/Ant/FA 7.03 CRM/Lxh/FA 9.32 CRM/Maa/FA 10.33 COM/Ant/EC CCM/Lxh/FC CCM/Maa/FC CRM/Ant/IC 0.61 CRM/Lxh/IC 0.53 CRM/Maa/IC 1.77 ARM/HD/S8 13.28 ARM/RS/S7 51.63 ARM/MD/S5 6.01 Sum 100.00 Sum 100.00 Sum 100.00 Furthermore alternative compositions were calculated with the same program and limits, aiming at the maximisation of the use of the fibre 15 cement ARM. These alternative Cold Clinker Meals compositions are also presented in Table 5. The chemical analyses of the limestone in Table 1 show that the limestone of Antoing have a high SO 3 content, by which that kiln already operates close to the S0 3 -limit (Table 4) in the routine condition. Therefore it's not realistic to increase the S0 3 -content WO 2013/110810 PCT/EP2013/051577 - 34 of the Hot Clinker Meal (HCM) of Antoing any further. After simulation, it is clear that the introduction of Air-cured ARM increases the S0 3 -content of the Hot Clinker Meal (HCM) because of its higher level of SO 3 compared with that of the CRM of CBR Antoing. Unlike Air-cured ARM, 5 the use of Autoclaved ARM lowers the SO 3 in the HCM since its S03 content is lower than that of the two types of limestone used by CBR Antoing. Clogging phenomena should logically decrease by the lower S03 content of the HCM. Therefore, it was chosen to maximise the Autoclaved ARM with the highest CaO [weight%] namely Autoclaved 10 High Density Fibre cement Boards (ARM/HD) in the CCM/Ant/FC as presented in Table 5. The limestone used by CBR Lixhe has a S content that is much lower than the limestone of Antoing. Also the S feed by the fuel mix is limited. Therefore the S0 3 -content of the HCM is not as critical as the one of CBR Antoing. An increase of the SO 3 [weight%] could 15 therefore be accepted. By maximisation of the air-cured ARM in the CCM/Lxh/FC, the SO 3 [weight%] of the simulated final clinker was increased to 0.73 weight% which was still below the maximum of 1.2 weight% (Table 4) that is allowed for and in line with the limits set for the DoS factor. It should be noted that in the simulated final clinker, the fuel 20 mix was not taken in account. Performed simulations with the typical fuel mix of CBR Lixhe showed an SO 3 increase of about 0.25 weight% which still is sufficiently below the maximum limit. The limestone or marl used by ENCI Maastricht contains a higher S content than the limestone or tufa used by CBR Lixhe. Also the used fuel mix brings more S to the HCM 25 compared to the fuel mix of CBR Lixhe. All this results in a higher SO 3 [weight%] in the reference clinker of ENCI Maastricht compared to the reference Clinker of CBR Lixhe (Table 3). Also the maximum allowed
SO
3 [weight%] is lower than that of CBR Antoing. The SO 3 [weight%] could therefore not be changed significantly what automatically suggests 30 the use of Autoclaved ARM. In the case of ENCI Maastricht, the Autoclaved ARM are still quite high in SO 3 [weight%] compared to the used limestone or marl. This differentiates the use of autoclaved ARM in WO 2013/110810 PCT/EP2013/051577 - 35 this plant from that in the CBR Antoing. Because the Autoclaved ARM from Autoclaved Medium Density Fibre cement Boards (ARM/MD) were the lowest in SO 3 [weight%], they were maximised in the CCM/Maa/FC like presented in Table 5. 5 3 Results and discussion 3.1. Chemical analysis The Chemical analyses of the CRM, ARM and CCM are presented in Tables 1, 2 and 6, that of the final Clinkers in Table 10. 10 Table 6: Chemical analysis of the Cold Clinker Meals (CCM) fed to the static kiln in weight% CCM CCM/Ant/Ref CCM/Ant/FC CCM/Lxh/Ref CCM/Lxh/FC CCM/Maa/Ref CCM/Maa/FC CaO 43.48 44.63 45.26 47.92 44.79 44.85 SiO 2 14.00 13.56 12.01 14.03 12.83 12.71 A1 2 0 3 2.89 2.72 2.90 3.35 3.09 3.05 Fe 2
O
3 1.84 1.80 2.72 2.65 2.42 2.40
K
2 0 0.59 0.33 0.41 0.32 0.39 0.34 Na 2 O 0.11 0.10 0.13 0.12 0.13 0.13
SO
3 0.48 0.41 0.24 0.81 0.28 0.29 MgO 1.10 0.94 0.88 1.18 0.97 0.96 TiO 2 0.16 0.26 0.21 0.29 0.20 0.21
P
2 0 5 0.12 0.12 0.15 0.23 0.09 0.10 CI 0.02 0.02 0.04 0.04 - LOI 9750C(02) 34.89 34.79 34.75 28.61 34.51 34.68 Ctotai 8.98 8.89 8.82 6.66 8.79 8.76 Stotal 0.36 0.25 0.09 0.36 0.15 0.16 WO 2013/110810 PCT/EP2013/051577 - 36 Table 10: Chemical analysis and Bogue calculations of the Final Clinkers produced in a static kiln Clinker CI/Ant/Ref CI/Ant/FC CI/Lxh/Ref CI/Lxh/FC CI/Maa/Ref CI/Maa/FC CaO (weight%) 65.90 66.71 66.28 65.61 66.18 66.44 SiO 2 (weight%) 22.27 22.72 21.93 21.53 21.39 21.56 A1 2 0 3 (weight%) 4.14 3.97 4.40 4.77 4.54 4.45 Fe 2 0 3 (weight%) 3.02 2.79 4.21 3.81 3.98 3.99
K
2 0 (weight%) 0.59 0.24 0.21 0.25 0.33 0.29 Na 2 0 (weight%) 0.17 0.14 0.20 0.20 0.21 0.19
SO
3 (weight%) 0.89 0.44 0.12 0.58 0.36 0.29 MgO (weight%) 1.73 1.48 1.28 1.7 1.52 1.44 TiO 2 (weight%) 0.25 0.39 0.30 0.40 0.30 0.3
P
2 0 5 (weight%) 0.21 0.20 0.24 0.33 0.17 0.16 Cl (weight%) n.a. n.a. n.a. n.a. n.a. n.a. LOI 975 0 C (02) (weight%) 0.48 0.39 0.39 0.33 0.48 0.45 DoS-factor 123.42 114.33 27.47 123.18 65.24 58.95 Alite (C 3 S) 66.84 68.19 67.52 65.92 70.61 70.97 Belite (C 2 S) 13.44 13.71 11.95 12.01 8.07 8.29 Aluminate (C 3 A) 5.86 5.80 4.54 6.20 5.30 5.04 Ferrite (C 4 AF) 9.19 8.49 12.81 11.59 12.11 12.14 The average analyses of the CRM were as expected and were therefore 5 directly used in the simulation program. The analyses of the ARM were evaluated by sorting them by source and plotting them in Figures 2 and 3 by their respective CaO and SiO 2 without L.O.I. since that is the way how the ARM will be fed to the HCM. From Figures 2 and 3, it is clear that Air cured ARM are very similar regardless of their source whereas the 10 different Autoclaved ARM were chemically totally different. From each source, three samples were selected based on their L.O.I. namely the one with the lowest and highest L.O.I. and the one closest to the average L.O.I. of the specific source. For each source, the chemical analysis of the ARM closest to the average L.O.I. was used in the simulation WO 2013/110810 PCT/EP2013/051577 - 37 program as also these samples were used as source for the experimental production of the different alternative clinker feed (Table 5). Furthermore the GC-MS and MS analysis were performed on these samples. The chemical analysis of the CCM in Table 6 and that of the Final Clinker in 5 Table 10 shows that the mass percentages of the used ARM and CRM were properly assessed by the simulation program. The calculated CCM which are presented in Table 5, generate specific mass percentages for the 4 critical metal oxides that after decarbonation and sintering at 14500C, give a chemical analysis similar to that of the targeted reference 10 Clinker as presented in Table 3. The chemical influence on possible mineralogical differences between the Clinker based on the CRM and the Clinker partly produced with the ARM should therefore be minimal. 3.2. TGA/DTA analysis 15 TGA/DTA analyses of the CRM are quite straightforward. The Limestone, Tufa and Marl have an endothermal decarbonation area between 700 and 900 0 C which is quantified in Table 7. Table 7: TGA/DTA evaluation of all the used Classic Raw Materials 20 (CRM) of CBR Antoing, CBR Lixhe and ENCI Maastricht Total Total Intrinsic Decarb E Decarb CRM Inorg 002 Organic+H 2 0 CaCO 3 CO MO [aMI0 a0 CaO MgO [Ca.Mg]CO3 CaCO 3 E TGA XRF XRF J/g Mat Meas TGA Meas TGA Der Meas Meas XRF Der pVs/mg TGA (weight%) (weight%) (weight%) (weight%) (weight%) (weight%) Mat DTA Der CRM/Ant/RL 39.9 1.0 90.8 50.09 0.9 90.8 226.2 1618 CRM/Ant/PL 34.9 1.2 79.4 42.87 1.1 78.9 219.4 1415 CRM/Ant/IC 4.8 4.0 11.0 6.20 0.3 11.7 28.5 196 CRM/Ant/FA 0.0 4.7 0.0 6.20 1.6 13.5 0.0 0 CRM/Lxh/Tu 39.5 3.4 89.8 51.75 0.7 92.2 251.8 1601 CRM/Lxh/Li 4.2 3.1 9.6 5.63 0.8 11.6 37.8 171 CRM/Lxh/IC 6.2 3.1 14.2 10.70 1.1 20.7 31.2 252 CRM/Lxh/FA 0.0 6.0 0.0 10.65 1.4 20.0 0.0 0 CRM/Maa/Ma 40.0 1.1 91.0 50.78 0.8 91.7 255.1 1622 WO 2013/110810 PCT/EP2013/051577 - 38 CRM/Maa/SC 1.1 1.99 2.6 2.70 0.3 5.3 12.2 46 CRM/Maa/IC 4.1 1.1 9.4 18.40 1.4 32.0 6.6 167 CRM/Maa/FA 0.0 4.0 0.0 18.38 1.8 31.4 0.0 0 A good match is found between XRF analysis and the C02 loss by TGA/DTA by comparing the CaCO 3 [weight%] derived from TGA analysis and the intrinsic [Ca,Mg]CO 3 [weight%] derived from XRF analysis. This 5 indicates that Ca is almost completely present as CaCO 3 . The decarbonation energy (Decarb E)of CaCO 3 can be derived from the known reaction enthalpy of 1782 kJ/kg for CaCO 3 and CaCO 3 [weight%] derived from TGA analysis. As can be noted in Table 7, the calculated decarbonation energies derived from the TGA relate in the same way as 10 the decarbonation energies (pVs/mg) measured by DTA. A gain of mass is measured at about 12800C indicating oxidation of sulphides. Loam and sabulous clay also show a small but distinct quantifiable decarbonation area between 650 and 8000C (Table 7). Here, a deviation between the CaCO 3 [weight%] derived from TGA analysis and [Ca,Mg]CO 3 [weight%] 15 derived from XRF analysis is seen, indicating that not all Ca and Mg are present in a carbonated form. Whereas the Decarb E of CaCO 3 can be derived from the TGA/DTA analysis rather easily, the quantification of the loss of H 2 0 (i.e. the amount of chemically bound water) is less easy. Assuming that there is no or only negligible amount of organic material 20 present in loam or sabulous clay, the changes registered in the TGA which are normally attributed to the combined loss of organics and H 2 0, may be considered to be mainly due to the evaporation of chemically bound H 2 0. The Fe 2
O
3 sources are more difficult to evaluate due to the fact that they mostly concern artificially made raw materials, derived from 25 waste. In inert atmosphere, the loss of mass is 2 times bigger than in the presence of 5v% 02 what indicates that the Fe 2
O
3 sources perform oxidation reactions while heating. Comparison of the TGA/DTA curves under inert and oxidative atmosphere also indicates the areas were oxidation takes place: a first time between 700 and 9000C and a second WO 2013/110810 PCT/EP2013/051577 - 39 time between 12000 and 13000C. Also nicely visible is the exothermal oxidation of FeO to Fe 2
O
3 starting from about 2800C because FeO is thermodynamically unstable below 5750C. TGA/DTA curves of the CRM/Lxh/IC and CRM/Maa/IC show small decarbonation reactions that 5 can be quantified in the same way as for the other CRM (Table 7). The fly ashes have an opposite behaviour in the two atmospheres, with a bigger loss of mass in oxidative than in inert atmosphere indicating the presence of organic material. The mass loss in inert atmosphere indicates the formation of organic volatiles in absence of 02. Because fly ash is a 10 material which has had already a thermal treatment at high temperatures, no decarbonation-related mass losses are detected (Table 7). Because there is a loss of organic volatiles and C02 visible in the whole temperature range between 4000C and 14500C under inert and oxidative atmosphere, the presence of char is indicated. TGA/DTA analyses of the 15 fibre cement materials (Table 8) give a lot of information on their raw materials and how they will behave when thermally degraded up to 14500C. Table 8: TGA/DTA evaluation of all the used Alternative Raw Materials 20 (ARM) coming from fibre cement. Anorg Total Total Intrinsic Decarb Decarb E ARM CO2 Organic+H 2 0 CaCO3 CaO MgO [Ca.Mg]CO 3 E CaCO3 CaCO 3 TGA XRF XRF pVs/mg Meas TGA Meas TGA Der Meas Meas XRF Der Mat J/g Mat (weight%) (weight%) (weight%) (weight%) (weight%) (weight%) DTA TGA Der ARM/CS/S2 7.1 11.1 16.1 52.09 1.54 70.99 14.6 287 ARM/CS/S3 9.6 12.7 21.9 49.99 1.36 70.22 22.5 389 ARM/CS/S5 10.0 13.5 22.7 50.86 1.64 71.53 41.5 405 ARM/RS/S3 7.7 9.8 17.5 52.55 1.62 71.81 26.9 312 ARM/RS/S7 8.2 11.0 18.7 51.89 1.52 71.41 33.6 334 ARM/RS/S9 7.9 11.6 17.9 52.20 1.56 71.53 32.9 319 ARM/HDB/S8 0.6 16.1 1.4 28.20 0.67 42.32 5.3 25 WO 2013/110810 PCT/EP2013/051577 -40 ARM/HDB/S9 0.5 16.8 1.1 28.62 0.59 42.67 9.7 20 ARM/HDB/S11 0.5 15.8 1.2 28.53 0.67 42.68 8.6 21 ARM/MDB/S5 0.3 14.3 0.6 24.83 0.79 38.28 4.8 11 ARM/MDB/S6 0.3 14.5 0.6 25.24 0.75 38.73 5.2 10 ARM/MDB/Sl1 0.2 16.6 0.6 25.12 0.59 38.35 4.2 10 The TGA peaks of the autoclaved ARM show the absence of limestone filler which is present for maximum 15 weight% in the air-cured materials. This makes it possible to quantify the C02 part coming from the limestone 5 filler of the air-cured products. Nicely visible is also the two-step degradation starting at 4800C of PVA, present at about 1.7 - 1.9 weight% in the air-cured materials in Figure 6 and the absence of PVA in the hydro-thermally hardened materials like plotted in Figure 7. This indicates that reaction products of PVA will be formed when heated. Also perfectly 10 quantifiable is the mass loss of the char that is generated by the thermal degradation of Cellulose between 8000C and 1000 C (Figures 7 and 8). The presence of char in the TGA/DTA analysis of the ARM, confirms the Broido-Shafizadeh reaction mechanism and therefore indirectly, the presence of levoglucosan. Furthermore, TGA/DTA coupled with XRF 15 analysis makes it possible to calculate the C02 fraction originating from [Ca,Mg](C0 3
)
2 and the associated energy consumption of each raw material presented in Tables 7 and 8. Unfortunately the gain in energy by the decomposition of organic components and the loss of energy coming from the decomposition of chemically bound H 2 0 is not quantifiable by 20 the performed analysis by TGA/DTA. By comparing the TGA/DTA analyses of the raw materials and the Cold Clinker Meals (CCM), the reduction of C02 emission as well as the associated energy gain by the lowered endothermal decarbonation can be quantified like presented in Table 9.
WO 2013/110810 PCT/EP2013/051577 -41 Table 9: TGA/DTA evaluation of the Reference Cold Clinker Meals of CBR Antoing, CBR Lixhe and ENCI Maastricht Decarb Decarb Decarb Decarb CCM Anorg Organic CaCO 3 Anorg CaCO3 E E E E C02 +H 2 0 C02 Der Der CaCO 3 CaCO3 CaCO3 CaCO 3 Der Der Mat TGA TGA Meas TGA Der TGA TGA Meas pVs/mg pVs/mg J/g J/g Meas (weight%) (weight%) Meas (weight%) Mat Mat DTA Mat Mat (weight%) DTA FM TGA TGA FM CCM/Ant/Ref 34.0 0.6 77.3 34.3 78.0 213.4 206.3 1378 1390 CCM/Ant/FC 29.7 4.8 67.6 31.7 72.1 190.5 179.7 1205 1284 CCM/Lxh/Ref 32.5 0.5 73.9 31.8 72.2 189.3 203.0 1318 1287 CCM/Lxh/FC 16.9 9.3 38.4 19.5 44.3 105.9 115.3 685 800 CCM/Maa/Ref 34.2 0,0 77.7 33.9 77.0 219.3 215.7 1385 1373 CCM/Maa/FC 33.3 1.2 75.8 32.9 74.7 199.7 209.3 1350 1332 This is done by calculating the decarbonation energies of CaCO 3 out of 5 the TGA/DTA analysis of the CCM and calculating the decarbonation energies derived of the TGA/DTA analysis of the raw materials taking in account the calculated compositions of Table 5. The fact that these two totally separated calculations gave a comparable result, proofs that the interpretation of the TGA/DTA analyses were objective as well as correct 10 and could therefore be used to evaluate the CO 2 reduction as well as the gain in Decarb E by the use of the ARM. 3.3. XRD Analysis The XRD analyses of the final clinkers are presented in Table 11 and 15 show different weight percentages than those calculated by Bogue equations out of the chemical analysis of the final Clinker presented in Table 10.
WO 2013/110810 PCT/EP2013/051577 - 42 Table 11: Mineralogical analysis by XRD of the Final Clinkers produced in a static kiln in weight% Clinker Cl/Ant/Ref CI/Ant/FC CI/Lxh/Ref CI/Lxh/FC CI/Maa/Ref CI/Maa/FC Alite (C 3 S) 64.52 64.50 65.04 62.72 71.33 70.58 Belite (C 2 S) 19.73 20.61 14.93 17.61 8.56 9.79 Aluminate 1.79 2.58 3.68 1.56 4.64 4.22 Ferrite (C 4 AF) 12.86 11.23 15.87 17.61 14.89 14.53 Free Lime 0.23 0.51 0.23 0.28 0.35 0.75 Periclase 0.39 0.19 0.18 0.22 0.23 0.13 Arcanite 0.32 0.20 0.07 - - Like stated in paragraph 3.1, the chemical analyses were in the line of the 5 expected and in the line of the average values of the clinkers produced in the first 6 months of 2011 on the 3 factory sites like presented in Table 3. The difference between the C 3 A and the C 4 AF measured with XRD and the corresponding values calculated with the Bogue equations stems from the method itself. The Bogue equations indeed are merely 10 estimations which describe the phases formed when perfect clinker production conditions could be achieved. The XRD analysis indicates the actual mineralogical composition as it appears in the real clinker itself. Though, in view of the evaluation of the possible influence of the ARM on the mineralogy of the clinkers a reliable and objective comparison of the 15 Classic Clinkers with the Alternative Clinkers can be done by any of these methods. For the kilns of CBR Antoing and ENCI Maastricht, it can be noted that the 13.28 weight% dosed Autoclaved High Density Fibre cement Boards ARM (Antoing) or the 6.01 weight% dosed Autoclaved Medium Density Fibre cement Boards ARM (Maastricht) had no 20 significant influence on the mineralogy of the clinker (Tables 10 and 11). In case of the CBR Lixhe kiln, it can be noted that the alite [weight%] of the alternative clinker (CI/Lxh/FC) is lower compared to the classic clinker (CI/Lxh/Ref) for XRD analyses and Bogue calculations. Because the difference in alite [weight%] between CI/Lxh/Ref and CI/Lxh/FC is bigger 25 by XRD analysis ( - 2.32 weight%) than by Bogue calculation (-1.6 weight%) , it may be concluded that the difference in alite [weight%] doesn't originate from a small difference in the chemical composition of WO 2013/110810 PCT/EP2013/051577 - 43 both clinkers only. In fact, this difference indicates that most probably, for equal chemistry, there still would be an influence of the air-cured ARM on the mineralogy of the alternative clinker. From Table 10, it can be noted that the alternative clinkers of CBR Lixhe were quite high in SO 3 5 compared to the reference clinker, but lower than calculated with the simulation program (Table 4). The same can be remarked for the clinkers of CBR Antoing where both the reference as well as the alternative clinkers were high in SO 3 but lower than calculated. Also the alkali contents of all clinkers were lower than simulated. It can be noted that 10 some of the DoS-factors (1) were out of equilibrium: both clinkers of CBR Antoing were still between the limits as also the alternative clinkers of CBR Lixhe but all clinkers of ENCI Maastricht and especially the classic clinker of CBR Lixhe had a DoS-factor that was too low. Like described in paragraph 2.1., an excess of alkali will decrease the viscosity of the melt 15 by which the alite formation is increased. The reason for these deviations lies in the fact that the static kiln has other enrichment factors (2) than the real clinker kilns that were simulated by the simulation program like described in paragraph 2.1. In fact, the enrichment factors of a static kiln will be much lower than those of the real clinker kilns. There is no gas 20 stream flowing in the opposite direction of the hot clinker meal (HCM) stream towards colder regions in the clinker kiln allowing alkali and SO 3 to return to the HCM flow like described in Figure 5. Also the ratio between the gas volume above the HCM mass and the HCM mass itself is much bigger than in the real clinker kilns. Because the alkali have a higher 25 volatility at 14500C than SO 3 , they will be much lower in content in a static kiln and also SO 3 [weight%] will be lowered significantly. The decreased alite formation of the alternative clinker of Lixhe by the use of air-cured ARM, could therefore be explained by a difference in DoS-factor influence by the higher SO 3 [weight%], brought in by the air-cured ARM 30 and at the other hand the influence of the static kiln on the volatility of
SO
3 and alkali. In case of the real clinker kiln of CBR Lixhe with the real enrichment factors, the difference in alite formation could possibly be WO 2013/110810 PCT/EP2013/051577 - 44 decreased. If the difference in DoS-factor would still be present, it could be countered by an adapted fuel mix. The conclusion after the evaluation of the XRD analysis is therefore that the use of fibre cement ARM doesn't influence greatly the chemical and mineralogical quality of the produced 5 alternative clinker if compared with the use of Classic Raw Materials. 3.4. Estimation of the influence on energy consumption: Calorimetric evaluation As indicated in paragraph 3.2, the decarbonation energies were 10 calculated and presented in Tables 8 and 9. These decarbonation energies together with the different gross calorific values of the CCM (paragraph 1.3.) and the selected fibre cement ARM determined by calorimetric analysis, were plotted in Figures 10 and 11. The average dry starting compositions of the four types of ARM give us the ratio between 15 the 3 types of organic fibres in the air-cured ARM: cellulose, PVA and PP. In the autoclaved ARM, only cellulose is used as organic fibre. Unfortunately, these dry starting compositions could not be revealed. The TGA/DTA analysis of the selected ARM, made it possible to divide the loss of ignition between 100 0 C and 1000 0 C in a decarbonation part and 20 an organic / chemically bound H 2 0 part. Because the decarbonation part concerns C0 2 , the part of the total C (Table 6) related to CO 2 can be calculated, revealing the C [weight%] related to the organic fibre(s). By the molecular mass of each organic fibre and the average ratio between the three types of organic fibres in the air-cured ARM, the weight% of the 25 organic fibres in the ARM can be calculated. The total weight% of these organic fibres reveals, by using the organic / chemically bound H 2 0 part measured by TGA/DTA, the chemically bound H 2 0. The weight% of the organic fibres and chemically bound H 2 0 in the alternative CCM can be deduced from the used weight% of ARM (Table 5) and were plotted in 30 Figures 8 and 9. Cellulose has a net calorific value of about 17520 J/g, PolyVinylAlcohol (PVA) of about 21310 J/g, and Polypropylene (PP) of about 42660 J/g. The net calorific values of the CCM and the selected WO 2013/110810 PCT/EP2013/051577 - 45 ARM generated out of the calculated weight% and the net calorific values of the organic fibres were plotted in Figures 8 and 9. It could be noted that the gross calorific values of the CCM and the used fibre cement samples are similar to the sum of the energies. This proofs that the 5 calculations that were performed to determine the weight% of the organic fibres and therefore also the chemically bound H 2 0 in the ARM and CCM, are representative for their compositions. We could estimate that the corrugated fibre cement sheets on average consists out of 7.8 weight% chemically bound H 2 0, the fibre cement roofing Slates out of 6.5 10 weight%, the medium density fibre cement boards out of 8.4 weight% and the high density fibre cement board out of 9.5 weight%. The Portland cement [weight%] in the ARM could be calculated by using the average dry starting compositions and the chemically bound H 2 0 [weight%] of the ARM which revealed the total paste [weight%] present in the ARM. The 15 ratio chemically bound H 2 0 / paste [weight%] present in the selected ARM are 8.7 weight% for the roofing slate sample (ARM/RS/S7) , 23.8 weight% for the high density fibre cement plate sample (ARM/HD/S8) and 20.4 weight% for the medium density fibre cement plate sample (ARM/MD/S5). Like presented in paragraph 1.2, the autoclaving 20 production process will create the ideal circumstances to hydrate completely the cement, explaining the high chemically bound H 2 0 [weight%]. These circumstances are not present in the air-cured production process which results in much lower chemically bound H 2 0 [weight%]. In both production processes, other raw materials of the dry 25 starting compositions like silica fume and wollastonite could form, in small quantities, hydration productions (paragraph 1.2). Like stated by Alarcon Ruiz, the chemically bound H 2 0 will be liberated between 1000C and 5500C. Three major decomposition reactions will take place liberating
H
2 0: the decomposition of gypsum, ettringite and a part of the 30 carboaluminate hydrates between 1100C and 1700C, the loss of chemically bound H 2 0 from the decomposition of the C-S-H and the other part of carboaluminate hydrates between 1800C and 3000C and finally WO 2013/110810 PCT/EP2013/051577 - 46 the dehydroxylation of portlandite between 4500C and 5500C. Two distinct endothermal energies could be distinguished out of the TGA/DTA analysis measured between 300C and 6000C on cement pastes, like described in paragraph 1.3.. The first between 1500C and 2500C and the 5 second between 4000C and 5000C. Also by TGA/DTA, the cement [weight%] and the chemically bound H 2 0 [weight%] could be determined for each cement paste. The endothermal energies required to evaporate the chemically bound H 2 0 were estimated by performing DSC analyses on these same cement pastes. These energies were subtracted with the 10 calculated heat capacities of the available Portland cement [weight%] in the cement pastes and were plotted in Figure 10 in function of the ratios chemically bound H20 / paste. The specific heat constant for Portland cement is 0.84 KJ/Kg/K. A good linearity was found. By using the ratio chemically bound H 2 0 / paste [weight%] determined for the selected 15 ARM, the energies necessary to perform these decomposition reactions in the selected ARM and alternative CCM were calculated by regression out of Figures 8 and 9. Nicely visible is the significant energy gain coming from the lowered endothermal Decarb E. There will also be a balance, in favour of the first, between the energy coming from the exothermal 20 decomposition energies of the organic fibres and the energy loss coming from the decomposition of the chemically bound H 2 0. It can safely be stated that energy gain due to the lowered endothermal Decarb E (Table 9) will be fully recuperated with a possible small recovery of the exothermal decomposition energy of the organic fibres. 25 3.5. GC-MS and MS analyses Two of the selected fibre cement ARM, ARM/RS/S7 and ARM/HD/S8 were heated up in three separated tests from room temperature to 3900C, 5000C and 8000C. These temperatures were reached within a period of 3 30 minutes. The generated volatiles and gases were collected for 5 minutes from the moment the samples were being heated up after which they were inserted in a GC-MS and a MS for analysis. By comparing the WO 2013/110810 PCT/EP2013/051577 - 47 integral calculation of the CO and C02 measurement graphs coming from the MS presented in Figure 11, it is clear that the formation of the low molecular CO and C02 gases by thermal degradation of the air-cured and autoclaved ARM increases by higher maximum degradation 5 temperatures like for thermal decomposition of cellulose. Although these calculations could be seen as arbitrary, they can objectively be used to compare the formation of CO and C02 gases of the three separated tests (3900C, 5000C and 8000C). Also the formation as well as the variety of the high molecular volatiles, measured by GC-MS, will increase when the 10 maximum degradation temperature of autoclaved ARM is increased to 8000C like demonstrated in Figure 12 and 13. Similar on what was found in literature on the thermal decomposition of cellulose, the total formation of high molecular volatiles increases when the maximum degradation temperature was increased from 3900C to 5000C. According to the 15 Broido-Shafizadeh mechanism, levoglucosan should be generated in high quantities. Unfortunately, the spectrum of levoglucosan was not detected in any of the six GC-MS measurements. Although the glass piping was isolated, there was a brown deposition towards the GC-MS. We suspect that this deposition descends from the levoglucosan. The 20 pyrolytic behaviour of levoglucosan at 400 0C results in a vapour phase and a liquid/solid phase. In the vapour phase, levoglucosan will be converted to non-condensable gases (mainly CO and C02), while char and other condensable low molecular weight products were formed in the liquid/solid phase. This could explain the absence of levoglucosan in the 25 GS-MS analysis. The GC-MS measurements of the air-cured ARM samples differ from those of the autoclaved ARM samples due to the presence of PVA and PP and the lower [weight%] of cellulose. Acetaldehyde should be generated above 4200C by thermal degradation of PVA. The big variety of generated volatiles prevents the identification 30 of acetaldehyde in the GC-MS measurements of the air-cured ARM. Although it was not possible to distinguish in a qualitative and quantitative way the different high molecular volatiles by GC-MS, this specific test WO 2013/110810 PCT/EP2013/051577 - 48 proofs that introducing the fibre cement ARM in large quantities by the cold side of the clinker kiln is a bad idea. Even when the clinker kiln is quite modern an has a cyclone tower to heat up the CCM within minutes to 8000C, it may be that a lot of generated volatiles return by the gas 5 stream to colder regions of the cyclone tower causing clogging if returned to their solid state or worse be emitted by the chimney causing an exceeding of the emission limits. The deposition in the glass tubing is a perfect example to endorse this statement. Therefore large quantities of fibre cement ARM should be introduced at a hot point like a pre-calciner 10 or pre-heater where it will be heated up in seconds to 9000C which will ensure a complete thermal degradation of the organic fibres. 4 Conclusions As could be noted in the different paragraphs, fibre cement recycled 15 materials is an interesting alternative raw material for Portland clinker production. It was shown that compared to a situation where pure limestone is used in the cold clinker meal, an inorganic C02 emission reduction as well as a decarbonation energy gain is possible. Furthermore, it was demonstrated that the chemistry and mineralogy of 20 the final clinkers were not influenced significantly by the use of the fibre cement materials. Because of its compositional constancy, and by that its chemical stability, fibre cement is a valid raw material. However, when used in practice, these materials should be introduced at a hot point in the process, e.g. using a pre-calciner unit or a pre-heater unit, to ensure 25 full thermal degradation of the organic fibres for physical and chemical reasons, like to avoid clogging of the filter system and exceeding organic volatile emissions levels. The potential energy loss by skipping the cyclone tower as energetically most profitable way of heating, should be minimal because the biggest energy consuming reaction in these 30 cyclones, the decarbonation of CaCO 3 , will almost not be present in fibre cement ARM. The possible energy gain for use of fibre cement versus limestone, coming from the exothermal degradation of organic WO 2013/110810 PCT/EP2013/051577 - 49 compounds as also coming from the lowered decarbonation energy, were quantified. Together with the estimated energy consumption needed for the liberation of chemically bound H 2 0, it was shown that using fibre cement as raw material for clinker production lowers the total required 5 energy compared to the use of classic raw materials, without compromising neither on physical, chemical nor mineralogical properties. It should, together with the already available alternative fuels and raw materials, be considered as a way to get in line with the Cement Sustainability Initiative.
权利要求:
Claims (16)
[1] 1. A method for the production of cement clinker in a system comprising a cyclone tower (11) with cyclones (1-5) and with a pre-calciner unit (10) wherein fuel is combusted to feed the cyclone tower 5 (11) with heat and a rotating drum kiln (15) which has at least one feed end (14) and which is heated by means of further fuel, in which method raw clinker meal is passed through said cyclone tower (11) to preheat it, said fuel is combusted in said pre-calciner unit (10) to produce a hot zone in the cyclone tower (11) wherein the raw clinker meal is heated to a 10 temperature of at least 8000C to calcine it, the heated and calcined raw clinker meal is fed from the cyclone tower (11) via the feed end (14) of the rotating drum kiln (15) into this rotating drum kiln (15) wherein the raw clinker meal is further heated to be molten and the molten raw clinker meal is subsequently cooled to produce the cement clinker, 15 characterised in that a fibre cement material containing organic fibres is added in said hot zone to said raw clinker meal and is heated in said hot zone in less than 5 seconds to a temperature of at least 8000C.
[2] 2. A method according to claim 1, characterised in that 20 the fibre cement material is added in the pre-calciner unit (10) to the raw clinker meal.
[3] 3. A method according to claim 1 or 2, characterised in that the fibre cement is added in a dry powdered form in said hot zone to said raw clinker material. 25
[4] 4. A method according to claim 3, characterised in that a rising gas stream is generated in the cyclone tower (11) wherein the fibre cement material is dispersed in said dry powdered form.
[5] 5. A method according to claim 4, characterised in that said rising gas stream passes the pre-calciner unit (10), the gas 30 contained in said rising gas stream having a retention time in the pre calciner unit (10) of at least 2 seconds, preferably of at least 3 seconds. WO 2013/110810 PCT/EP2013/051577 - 51
[6] 6. A method according to claim 4 or 5, characterised in that the fibre cement material is removed from the rising gas stream by means of one of said cyclones (5) and is supplied by this cyclone (5) to the feed end (14) of the rotating drum kiln (15). 5
[7] 7. A method according to any one of the claims 4 to 6, characterised in that oxygen is supplied to said cyclone tower (11) in such an amount that after the calcination of the raw clinker meal and the combustion of said fuel in the cyclone tower (11), the rising gas stream contains at least 2 vol.% and preferably at least 3 vol.% of oxygen. 10
[8] 8. A method according to any one of the claims 1 to 7, characterised in that the fibre cement material is heated up in less than 2 seconds to said temperature of at least 8000C.
[9] 9. A method according to any one of the claims 1 to 8, characterised in that the fibre cement material has an inorganic material 15 content of at least 80 dry weight %, preferably at least 85 dry weight % and more preferably at least 90 dry weight %, based on the total dry weight of the fibre cement material.
[10] 10. A method according to any one of the claims 1 to 9, characterised in that the fibre cement material comprises fibre cement 20 sheets, preferably produced by Hatschek technology, which is milled into said dry powdery form.
[11] 11. A method according to any one of the claims 1 to 10, characterised in that said fibre cement material is added in an amount of at least 2 wt.%, preferably of at least 5 wt.% and more preferably of at 25 least 10 wt.%, based on the total weight of raw clinker meal and fibre cement material.
[12] 12. A method according to any one of the claims 1 to 11, characterised in that said fibre cement material is heated in said hot zone to a temperature of at least 9000C, in particular in less than 5 seconds, 30 more particularly in less than 2 seconds.
[13] 13. A method for the production of cement clinker in a system comprising a heated rotating drum kiln (15) having at least one WO 2013/110810 PCT/EP2013/051577 - 52 feed end (14) for receiving a raw material feed, wherein fibre cement material, which comprises organic fibres, is introduced into said feed end (14) of said kiln (15), characterised in that 5 said system further comprises a pre-calciner unit (10) having an inlet end and an outlet end communicating with the feed end (14) of the kiln (15), the pre-calciner (10) operable to partially or fully calcinate a raw material feed passing from the inlet end of the pre-calciner unit (10) into the feed end (14) of the kiln (15), the method further comprising the step of 10 introducing the fibre cement material into the pre-calciner unit (10) in a hot zone which is at a temperature of at least 8000C.
[14] 14. A method according to claim 13, characterised in that the fibre cement material is added to said raw material feed in the pre calciner unit (10).
[15] 15 15. A method according to claim 13 or 14, characterised in that the fibre cement material is heated up to the temperature of said hot zone in 1 to 5 seconds, preferably in less than 2 seconds.
[16] 16. A method according to any one of the claims 13 to 15, characterised in that the fibre cement material is introduced into said 20 pre-calciner unit (10) is in a dry powdered form.
类似技术:
公开号 | 公开日 | 专利标题
Bye1999|Portland cement: composition, production and properties
Chatterjee2011|Chemistry and engineering of the clinkerization process—Incremental advances and lack of breakthroughs
Habert2014|Assessing the environmental impact of conventional and ‘green’cement production
CN105217986B|2018-03-13|With the method for novel dry-process rotary kiln line processing waste gypsum producing building land plaster
CN111233356B|2021-04-06|Method and system for preparing sulphoaluminate cement from all solid waste of aluminum ash pretreatment
US6439139B1|2002-08-27|Method for recycling building materials
Schoon et al.2012|Waste fibrecement: An interesting alternative raw material for a sustainable Portland clinker production
AU2013213556B2|2016-02-25|Use of organic fibre cement as a raw material in the production of cement clinker
US10294152B2|2019-05-21|Method for producing a pozzolanic or latent-hydraulic cement clinker substitute
US20040157181A1|2004-08-12|Method for manufacturing cement clinker
CN105110666B|2017-11-17|The method that the discarded object produced using calcium carbide prepares clinker
US7107916B2|2006-09-19|Method for recycling building materials
CN211770962U|2020-10-27|System for preparing sulphoaluminate cement by using all solid wastes of aluminum ash pretreatment
US10759696B2|2020-09-01|Cement kiln fuel treatment
CN104003633A|2014-08-27|Preparation method of silicate clinker and cement and rotary kiln for preparing silicate clinker
AU2009326594B2|2014-11-27|Process for producing cement or cement substitutes
JP4946186B2|2012-06-06|Method for producing cement clinker
Sadek et al.2014|Blended cement utilizing ceramic wall tiles waste
US20140178271A1|2014-06-26|Cement Clinker Production with Low Emissions
JP2020142934A|2020-09-10|Manufacturing method of cement
Reno et al.2016|AN OVERVIEW OF INDUSTRIAL WASTES AS FUEL AND MINERALIZER IN THE CEMENT INDUSTRY
Ghosh et al.2022|Fundamentals of Cement Chemistry, Operations, and Quality Control
Mut et al.2014|Sulfur Release during alternative fuels combustion in cement rotary kilns
Abdelgader et al.2022|Cement kiln dust
WO2018059715A1|2018-04-05|Process enabling the use alternative fuels with high chlorine content in clinker production
同族专利:
公开号 | 公开日
EP2807128B1|2019-03-27|
PT2807128T|2019-06-28|
HRP20191006T1|2019-10-04|
PL2807128T3|2020-03-31|
PE20142104A1|2014-12-20|
AU2013213556B2|2016-02-25|
CL2014001933A1|2014-11-03|
CO7020901A2|2014-08-11|
ZA201405080B|2015-12-23|
ES2732217T3|2019-11-21|
EP2807128A1|2014-12-03|
UA113196C2|2016-12-26|
EA025760B1|2017-01-30|
LT2807128T|2019-09-25|
US20140366779A1|2014-12-18|
US9926229B2|2018-03-27|
HUE044987T2|2019-12-30|
SI2807128T1|2019-10-30|
RS59216B1|2019-10-31|
WO2013110810A1|2013-08-01|
EA201491415A1|2014-12-30|
DK2807128T3|2019-07-01|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题
IN159327B|1982-09-02|1987-05-02|Smidth & Co As F L||
US5096692A|1989-06-29|1992-03-17|Ek Roger B|Mineralogical conversion of asbestos waste|
TW337517B|1993-06-03|1998-08-01|Smidth & Co As F L|Method and plant for manufacturing cement clinker|
DE4330551A1|1993-09-09|1995-03-16|Werner Prof Dr Rammensee|Process for the environmentally tolerable disposal of mineral fibres and substances containing mineral fibres and their conversion into materials of value|
PT850205E|1996-07-15|2001-01-31|Eternit Ag|ELIMINATION PROCESS OF RESIDUAL FIBER PRODUCTS|
US20050066860A1|2003-09-25|2005-03-31|Logan Terry J.|Use of organic waste/mineral by-product mixtures in cement manufacturing processes|
JP4628773B2|2004-12-22|2011-02-09|住友大阪セメント株式会社|Organic sludge treatment method and treatment apparatus|
US7361014B2|2005-11-15|2008-04-22|Buzzi Unicem Usa, Inc.|Injection of waste-derived materials into pre-calcining stage of a clinker production system|CN103396020B|2013-08-13|2014-08-06|尹无忌|Method for using waste concrete as active admixture in cement production|
US10343941B2|2017-06-16|2019-07-09|Owens-Brockway Glass Container Inc.|Glass batch material and process for making glass|
EP3456695B1|2017-09-13|2020-11-11|Dow Global Technologies LLC|Waterborne coating composition|
法律状态:
2016-06-23| FGA| Letters patent sealed or granted (standard patent)|
2019-10-17| PC| Assignment registered|Owner name: ETEX SERVICES NV Free format text: FORMER OWNER(S): CIMENTERIES CBR; REDCO |
2020-08-27| MK14| Patent ceased section 143(a) (annual fees not paid) or expired|
优先权:
申请号 | 申请日 | 专利标题
EP12152942||2012-01-27||
EP12152942.4||2012-01-27||
PCT/EP2013/051577|WO2013110810A1|2012-01-27|2013-01-28|Use of organic fibre cement as a raw material in the production of cement clinker|
[返回顶部]