专利摘要:
A method in a user equipment (121) for determining a transport block size is provided. The transport block size is used by the user equipment (121) in receiving downlink data transmissions from a network node (110) on an enhanced Control CHannel, eCCH. The user equipment (121) and the network node (1 10) are comprised in a telecommunications system (100). The user equipment (121) has access to a table of predetermined transport block sizes. The user equipment (121) may calculate an indicator Ν
公开号:AU2012369247A1
申请号:U2012369247
申请日:2012-06-11
公开日:2014-08-28
发明作者:Jung-Fu Cheng;Mattias Frenne;Johan FURUSKOG;Havish Koorapaty;Daniel Larsson
申请人:Telefonaktiebolaget LM Ericsson AB;
IPC主号:H04L1-00
专利说明:
WO 2013/119158 PCT/SE2012/050627 1 USER EQUIPMENT, NETWORK NODE AND METHODS THEREIN FOR DETERMINING A TRANSPORT BLOCK SIZE IN DOWNLINK TRANSMISSIONS IN A TELECOMMUNICATIONS SYSTEM 5 TECHNICAL FIELD Embodiments herein relate to a network node, a user equipment and methods therein. In particular, embodiments herein relate to determining a transport block size of downlink transmissions in a telecommunications system. 10 BACKGROUND In today's radio communications networks a number of different technologies are used, such as Long Term Evolution (LTE), LTE-Advanced, Wideband Code Division Multiple Access (WCDMA), Global System for Mobile communications/Enhanced Data rate for GSM Evolution (GSM/EDGE), Worldwide Interoperability for Microwave Access 15 (WiMax), or Ultra Mobile Broadband (UMB), just to mention a few possible technologies for radio communication. A radio communications network comprises radio base stations providing radio coverage over at least one respective geographical area forming a cell. The cell definition may also incorporate frequency bands used for transmissions, which means that two different cells may cover the same geographical area but using different 20 frequency bands. User equipments (UE) are served in the cells by the respective radio base station and are communicating with respective radio base station. The user equipments transmit data over an air or radio interface to the radio base stations in uplink (UL) transmissions and the radio base stations transmit data over an air or radio interface to the user equipments in downlink (DL) transmissions. 25 Long Term Evolution (LTE) is a project within the 3rd Generation Partnership Project (3GPP) to evolve the WCDMA standard towards the fourth generation (4G) of mobile telecommunication networks. In comparisons with third generation (3G) WCDMA, LTE provides increased capacity, much higher data peak rates and significantly improved latency numbers. For example, the LTE specifications support downlink data peak rates 30 up to 300 Mbps, uplink data peak rates of up to 75 Mbit/s and radio access network round-trip times of less than 10 ms. In addition, LTE supports scalable carrier bandwidths from 20 MHz down to 1.4 MHz and supports both Frequency Division Duplex (FDD) and Time Division Duplex (TDD) operation. LTE technology is a mobile broadband wireless communication technology in 35 which transmissions are sent using orthogonal frequency division multiplexing (OFDM), WO 2013/119158 PCT/SE2012/050627 2 wherein the transmissions are sent from base stations, also referred to herein as network nodes or eNBs, to mobile stations, also referred to herein as user equipments or UEs. The transmission OFDM splits the signal into multiple parallel sub-carriers in frequency. A basic unit of transmission in LTE is a Resource Block (RB) which in its most 5 common configuration comprises 12 subcarriers and 7 OFDM symbols in one time slot. A unit of one subcarier and 1 OFDM symbol is referred to as a resource element (RE), as shown in Figure 1. Thus, an RB comprises 84 REs. Accordingly, a basic LTE downlink physical resource may thus be seen as a time frequency grid as illustrated in Figure 1, where each Resource Element (RE) corresponds 10 to one OFDM subcarrier during one OFDM symbol interval. A symbol interval comprises a cyclic prefix (cp), which cp is a prefixing of a symbol with a repetition of the end of the symbol to act as a guard band between symbols and/or facilitate frequency domain processing. Frequencies for subcarriers having a subcarrier spacing Af are defined along an z-axis and symbols are defined along an x-axis. 15 In the time domain, LTE downlink transmissions are organized into radio frames of 10 ms, each radio frame comprising ten equally-sized sub-frames, #0 - #9, each with a Tsunrame= 1 ms of length in time as shown in Figure 2. Furthermore, the resource allocation in LTE is typically described in terms of resource blocks, where a resource block corresponds to one slot of 0.5 ms in the time domain and 12 subcariers in the 20 frequency domain. Resource blocks are numbered in the frequency domain, starting with resource block 0 from one end of the system bandwidth. An LTE radio sub-frame is composed of multiple RBs in frequency with the number of RBs determining the bandwidth of the system and two slots in time, as shown 25 in Figure 3. Furthermore, the two RBs in a sub-frame that are adjacent in time may be denoted as an RB pair. Downlink transmissions are dynamically scheduled in the current downlink subframe. This means that, in each subframe, the network node transmits control information about to which UEs data is transmitted, and upon which resource blocks the 30 data is transmitted. This control signalling is typically transmitted in the first 1, 2, 3 or 4 OFDM symbols in each subframe denoted the control region. In Figure 3, for example, a downlink system with 1 out of 3 possible OFDM symbols as control signalling is illustrated. The dynamic scheduling information is communicated to the UEs via a Physical Downlink Control CHannel (PDCCH) transmitted in the control region. After successful 35 decoding of a PDCCH, the UE performs reception of the Physical Downlink Shared WO 2013/119158 PCT/SE2012/050627 3 CHannel (PDSCH) or transmission of the Physical Uplink Shared CHannel (PUSCH) according to a pre-determined timing specified in the LTE specification. Furthermore, LTE uses Hybrid-ARQ (HARQ). That is, after receiving DL data in a 5 subframe, the UE attempts to decode it and reports to the network node an Acknowledgement (ACK) or a Non-Acknowledgement (NACK) if the decoding was successful or not successful. This is performed via the Physical Uplink Control CHannel (PUCCH). In case of an unsuccessful decoding attempt, the network node may retransmit the erroneous data. 10 Similarly, the network node may indicate to the UE an Acknowledgement (ACK) or a Non-Acknowledgement (NACK) if the decoding of the PUSCH was successful or not successful via the Physical Hybrid ARQ Indicator CHannel (PHICH). The DL Layer-1/Layer 2 (L1/L2) control signalling transmitted in the control region 15 comprises the following different physical-channel types: - The Physical Control Format Indicator CHannel (PCFICH). This informs the UE about the size of the control region, e.g. one, two, or three OFDM symbols for system bandwidths larger than 10 RBs and two, three or four OFDM symbols for system bandwidths equal to 10 RBs or smaller. There is one and only one 20 PCFICH on each component carrier or, equivalently, in each cell. - The Physical Downlink Control CHannel (PDCCH). This is used to signal DL scheduling assignments and UL scheduling grants. Each PDCCH typically carries signalling for a single UE, but can also be used to address a group of UEs. Multiple PDCCHs can exist in each cell. 25 - The Physical Hybrid-ARQ Indicator CHannel (PHICH). This is used to signal hybrid-ARQ acknowledgements in response to UL-SCH transmissions. Multiple PHICHs can exist in each cell. These physical channels are organized in units of Resource Element Group (REG), which comprises four closely spaced resource elements. The PCFICH occupies four 30 REGs and a PHICH group occupies three REGs. An example of control channels in an LTE control region, assuming a system bandwidth of 8 RBs, is shown in Figure 4. Physical Downlink Control CHannel (PDCCH) The PDCCH is used to carry Downlink Control Information (DCI), such as, e.g. 35 scheduling decisions and power-control commands. More specifically, the DCI comprises: WO 2013/119158 PCT/SE2012/050627 4 - Downlink scheduling assignments. These may comprise PDSCH resource indication, transport format, hybrid-ARQ information, and control information related to spatial multiplexing (if applicable). A downlink scheduling assignment also comprises a command for power control of the PUCCH used for transmission 5 of hybrid-ARQ acknowledgements in response to downlink scheduling assignments. - Uplink scheduling grants. These comprise PUSCH resource indication, transport format, and hybrid-ARQ-related information. An uplink scheduling grant also comprises a command for power control of the PUSCH. 10 - Power-control commands for a set of UEs, which may serve as a complement to the commands comprised in the scheduling assignments/grants. As multiple UEs may be scheduled simultaneously, on both DL and UL, there must be a possibility to transmit multiple scheduling messages within each subframe. Each 15 scheduling message is transmitted on a separate PDCCH, and consequently there are typically multiple simultaneous PDCCH transmissions within each cell. To accommodate multiple UEs, LTE defines so-called search spaces. The search spaces describe the set of CCEs which the UE is supposed to monitor for scheduling assignments/grants relating to a certain component carrier. A UE has multiple search spaces, namely, UE-specific 20 search spaces and the common search space. Fast link adaptation to a fading channel condition is used in radio communication network to enhance system throughput capacity, as well as, user experience and quality of services. An important factor in the working of fast link adaptation is the timely update 25 of channel conditions that is fed back from the receiver to the transmitter. The feedback may take on several related forms, such as, e.g. a signal to noise ratio (SNR), a signal to interference and noise ratio (SINR), a received signal level (e.g. power or strength), supportable data rates, supportable combination of modulation and coding rates, supportable throughputs, etc. The information may also pertain to entire frequency bands, 30 as in W-CDMA systems, or specific portions of it as made possible by systems based OFDM such as the LTE system. These feedback messages may generally be referred to as a Channel Quality Indicator (CQI). In DL data operations in LTE, the CQI messages are fed back from the UE to the network node to assist the transmitter in the network node in the decision of radio 35 resource allocation. The feedback information may, for example, be used to determine WO 2013/119158 PCT/SE2012/050627 5 transmission scheduling among multiple receivers; to select suitable transmission schemes, such as, e.g. the number of transmit antennas to activate; to allocate appropriate amount of bandwidth; and to form supportable modulation and coding rate for the intended receiver in the UE. 5 In UL data operations in LTE, the network node may estimate the channel quality from the Demodulation Reference Symbols (DRS) or Sounding Reference Symbols (SRS) transmitted by the UEs. The range of a CQI message in LTE is shown in the CQI message table of Figure 5. This table is the table 7.2.3-1 present in the standard specification 3GPP TS 36.213 10 "Physical Layer Procedures". This CQI message table has been specifically designed to support Modulation and Coding Scheme (MCS) adaptation over wide-band wireless communication channels. The transition points from a lower-order modulation to a higher order modulation have been verified with extensive link performance evaluation. These specific transition points between different modulations thus provide a guideline for well 15 adjusted system operation. Based on the CQI message from a UE, a network node may choose the best MCS to transmit data on the PDSCH. The MCS information is conveyed to the selected UE in a 5 bit "modulation and coding scheme" field (I,cs ) of the DCI, as shown in the MCS table of 20 Figure 6. The MCS field Ites signals to the UE both the modulation Q, and the transport block size (TBS) index I,,s. In conjunction with the total number of allocated RBs, the TBS index ITS further determines the exact transport block size used in the PDSCH transmission. The last three MCS entries are for HARQ retransmissions and, hence, the TBS remains the same as the original transmission. 25 The specific TBSs for different number of allocated radio blocks are defined and listed for the single layer transmission case in the TBS table 7.1.7.2.1-1, i.e. a large 27x110 table, in the standard specification 3GPP TS 36.213 "Physical Layer Procedures". However, these TBSs are designed to achieve spectral efficiencies matching the CQI 30 messages. More specifically, the TBSs are selected to achieve the spectral efficiencies shown in the table of Figure 7. Note that the CQI message table in Figure 5 and, consequently, the MCS table of Figure 6, are both designed based on the assumption that 11 OFDM symbols are available for PDSCH transmission. This means that when the actual number of available WO 2013/119158 PCT/SE2012/050627 6 OFDM symbols for PDSCH is different than 11, the spectral efficiency of the transmission will deviate from the spectral efficiencies shown in the table of Figure 7. Enhanced Control Channel (eCCH) 5 Transmission of a Physical Downlink Shared CHannel (PDSCH) to UEs may use REs in RB pairs that are not used for control messages or RS. Further, the PDSCH may either be transmitted using the UE-specific reference symbols or the CRS as a demodulation reference, depending on the transmission mode. The use of UE-specific RS allows a multi-antenna network node to optimize the transmission using pre-coding of 10 both data and reference signals being transmitted from the multiple antennas so that the received signal energy increases at the UE. Consequently, the channel estimation performance is improved and the data rate of the transmission could be increased. In LTE Release 10, a Relay Physical Downlink Control CHannel is also defined and denoted R-PDCCH. The R-PDCCH is used for transmitting control information from 15 network node to Relay Nodes (RN). The R-PDCCH is placed in the data region, hence, similar to a PDSCH transmission. The transmission of the R-PDCCH may either be configured to use CRS to provide wide cell coverage, or RN specific reference signals to improve the link performance towards a particular RN by precoding, similar to the PDSCH with UE-specific RS. The UE-specific RS is in the latter case used also for the R-PDCCH 20 transmission. The R-PDCCH occupies a number of configured RB pairs in the system bandwidth and is thus frequency multiplexed with the PDSCH transmissions in the remaining RB pairs, as shown in Figure 8. Figure 8 shows a downlink sub-frame showing 10 RB pairs and transmission of 3 R-PDCCH, that is, red, green or blue, of size 1 RB pair each. The R-PDCCH does not 25 start at OFDM symbol zero to allow for a PDCCH to be transmitted in the first one to four symbols. The remaining RB pairs may be used for PDSCH transmissions. In LTE Release 11 discussions, attention has turned to adopt the same principle of UE-specific transmission as for the PDSCH and the R-PDCCH for enhanced control 30 channels, that is, including PDCCH, PHICH, PBCH, and Physical Configuration Indication CHannels (PCFICH). This may be done by allowing the transmission of generic control messages to a UE using such transmissions to be based on UE-specific reference signals. This means that precoding gains may be achieved also for the control channels. Another benefit is that different RB pairs may be allocated to different cells or different 35 transmission points within a cell. Thereby, inter-cell interference coordination between WO 2013/119158 PCT/SE2012/050627 7 control channels may be achieved. This frequency coordination is not possible with the PDCCH, since the PDCCH spans the whole bandwidth. Figure 9 shows an enhanced PDCCH (ePDCCH) which, similar to the CCE in the PDCCH, is divided into multiple groups (eREG) and mapped to one of the enhanced 5 control regions. However, it should be noted that the relation between ePDCCH, eREGs and REs is not yet determined in the 3GPP standard. One option could be that the relation between ePDCCH and eREGs/REs are to be similar to that as for PDCCH, i.e. that one ePDCCH is divided into one or multiple eCCE(s) corresponding to 36 REs, which in turn is divided into 9 eREGs each comprising 4 REs. Another option may be to have 10 one eCCE corresponding to up to 36 REs, and wherein each eREG corresponds to 18 REs. According to yet another option, it may be decided that the eCCE should correspond to even more than 36 REs, such as, e.g. 72 or 74. That is, Figure 9 shows a downlink sub-frame showing a CCE belonging to an ePDCCH that is mapped to one of the enhanced control regions, to achieve localized 15 transmission. Note that, in Figure 9, the enhanced control region does not start at OFDM symbol zero, to accommodate simultaneous transmission of a PDCCH in the sub-frame. However, as was mentioned above, there may be carrier types in future LTE releases that do not have a PDCCH, in which case the enhanced control region could start from OFDM 20 symbol zero within the sub-frame. Time Division Duplex (TDD) Transmission and reception from a UE may be multiplexed in the frequency domain, in the time domain or in a combination of the two domains, such as, e.g. the half 25 duplex FDD. Figure 10 shows an illustration of Frequency Division Duplex (FDD) and Time Division Duplex (TDD). Frequency Division Duplex (FDD) implies that DL and UL transmissions take place in different, sufficiently separated, frequency bands, while Time Division Duplex (TDD) implies that DL and UL transmissions take place in different, non-overlapping time slots. 30 Thus, TDD may operate in an unpaired spectrum, whereas FDD requires a paired spectrum. Typically, the structure of the transmitted signal is organized in the form of a frame structure. For example, LTE uses ten equally-sized subframes of length 1 ms per radio frame as illustrated in Figure 2 and 11.
WO 2013/119158 PCT/SE2012/050627 8 As shown in the upper part of Figure 11, in case of FDD operation, there are two carrier frequencies; one carrier frequency for UL transmission ( Ft ) and one carrier frequency for DL transmission (FDL ). At least with respect to the UE, FDD may either be full duplex or half duplex. In the full duplex case, a UE may transmit and receive 5 simultaneously, while in half-duplex operation, the UE cannot transmit and receive simultaneously. However, it should be noted that the network node is capable of simultaneous reception or transmission, e.g. receiving from one UE while simultaneously transmitting to another UE. In LTE, a half-duplex UE is monitoring or receiving in the DL except when explicitly being instructed to transmit in a certain subframe. 10 As shown in the lower part of Figure 11, in case of TDD operation, there is only a single carrier frequency, and UL and DL transmissions are always separated in time and also on a cell basis. As the same carrier frequency is used for UL and DL transmission, both the network node and the UEs need to switch from transmission to reception and vice versa. An important aspect of any TDD system is to provide the possibility for a 15 sufficiently large guard time, where neither DL nor UL transmissions occur. This is required in order to avoid interference between UL and DL transmissions. For LTE, this guard time is provided by special subframes, e.g. subframe #1 and, in some cases, subframe #6. These are then split into three parts: a downlink part (DwPTS), a guard period (GP), and an uplink part (UpPTS). The remaining subframes are either allocated to 20 UL or DL transmission. TDD allows for different asymmetries in terms of the amount of resources allocated for UL and DL transmission, respectively, by means of different UL and DL configurations. As shown in Figure 12, there are seven different configurations in LTE. It should be noted that a DL subframe may mean either a DL subframe or the special 25 subframe. The LTE system has been designed to support a wide range of operation modes comprising the FDD and the TDD modes. Each of these modes may also operate with normal cyclic prefix (CP) lengths for typical cell sizes or with extended CP lengths for 30 large cell sizes. To facilitate DL to UL switching, some special TDD subframes are configured to transmit user data in the DwPTS with shortened duration. Furthermore, in the LTE system, available resources may be dynamically appropriated between control information and user data information. For example, the radio resource in a normal subframe is organized into 14 OFDM symbols. The LTE 35 system may dynamically use {0, 1, 2, 3) OFDM symbols or {0, 2, 3, 4) OFDM symbols in WO 2013/119158 PCT/SE2012/050627 9 case of very small system bandwidths to transmit control information. As a result, the actual number of OFDM symbols available for data transmission is 14, 13, 12, 11 or 10. A summary of the number of available OFDM symbols for PDSCH transmission in different operation modes is given in the table of Figure 13. 5 As previously mentioned, the CQI message table in Figure 5 and, consequently, the MCS table of Figure 6, are both designed based on the assumption that 11 OFDM symbols are available for PDSCH transmission. As shown in the table in Figure 13, there are many cases where the actual resource available for transmission does not match this 10 assumption. Thus, this assumption may lead to mismatch problems when the actual number of OFDM symbols available for PDSCH deviates from the assumed 11 OFDM symbols, which consequently will reduce data throughput. SUMMARY 15 It is an object of embodiments herein to provide increased data throughput in a telecommunications system. According to a first aspect of embodiments herein, the object is achieved by a method in a user equipment for determining a transport block size. The transport block 20 size is used by the user equipment in receiving downlink data transmissions from a network node on an enhanced Control CHannel, eCCH. The user equipment and the network node are comprised in a telecommunications system. The user equipment has access to a table of predetermined transport block sizes. The user equipment calculates an indicator N, based on the total number of PRBs allocated to the downlink data 25 transmission NR, and based on an PRB offset valueOR or a PRB adjustment factor Ap. . Then, the user equipment determines the transport block size from the table of predetermined transport block sizes based on at least the calculated indicator N,,. According to a second aspect of embodiments herein, the object is achieved by a 30 user equipment for determining a transport block size. The transport block size is used by the user equipment in receiving downlink data transmissions from a network node on an enhanced Control CHannel, eCCH. The user equipment and the network node are comprised in a telecommunications system. The user equipment has access to a table of predetermined transport block sizes. The user equipment comprises a processing circuitry WO 2013/119158 PCT/SE2012/050627 10 configured to calculate an indicator NR based on the total number of PRBs allocated to the downlink data transmission N,,, and based on an PRB offset valueOR or a PRB adjustment factor AR. The processing circuitry is further configured to determine the transport block size from the table of predetermined transport block sizes based on at 5 least the calculated indicator N, . According to a third aspect of embodiments herein, the object is achieved by a method in a network node for determining a transport block size. The transport block size is used by the network node in transmitting downlink data transmissions to the user 10 equipment on an enhanced control channel, eCCH. The network node and the user equipment are comprised in a telecommunications system. The network node has access to a table of predetermined transport block sizes. The network node calculates an indicator NR based on the total number of PRBs allocated to the downlink data transmission N,., and based on an PRB offset value O,, or a PRB adjustment 15 factor A,. Then, the network node determines the transport block size from the table of predetermined transport block sizes based on at least the calculated indicatorN, . According to a fourth aspect of embodiments herein, the object is achieved by a network node for determining a transport block size. The transport block size is used by 20 the network node in transmitting downlink data transmissions to the user equipment on an enhanced control channel, eCCH. The network node and the user equipment are comprised in a telecommunications system. The network node has access to a table of predetermined transport block sizes. The network node comprises a processing circuitry configured to calculate an indicator NpR8 based on the total number of PRBs allocated to 25 the downlink data transmission N , and on an PRB offset value OPRB, or a PRB adjustment factor A,.. The processing circuitry is further configured to determine the transport block size from the table of predetermined transport block sizes based on at least the calculated indicator N, . 30 When the actual number of OFDM symbols for the downlink data transmissions on an eCCH deviates from the assumed 11 OFDM symbols, the number of suitable modulation and coding schemes (MCSs) generating suitable code rates for the downlink WO 2013/119158 PCT/SE2012/050627 11 data transmissions will be significantly smaller. By including a PRB offset value O", or PRB adjustment factor Am , in the determining of the transport block size as described above, the user equipment avoids unsuitable modulation and coding schemes. This enables a better scheduling of the downlink data transmissions on the eCCH, since 5 unsuitable code rates, which e.g. may cause the downlink data transmissions to fail and be in need of being retransmitted, is avoided. Hence, a way of increasing data throughput in a telecommunications system is achieved. 10 BRIEF DESCRIPTION OF THE DRAWINGS The above and other features and advantages of the embodiments will become readily apparent to those skilled in the art by the following detailed description of exemplary embodiments thereof with reference to the accompanying drawings, wherein: 15 Figure 1 is a schematic block diagram of a LTE downlink physical resource, Figure 2 is a schematic overview depicting radio frames, Figure 3 is a schematic overview depicting a DL sub-frame, Figure 4 is a schematic overview depicting control channels in an LTE control region, 20 Figure 5 shows a 4-bit CQI message table for LTE, Figure 6 shows a modulation and TBS index table (MCS table) for LTE PDSCH, Figure 7 shows a table depicting spectral efficiency for LTE with 11 OFDM symbols for PDSCH, Figure 8 is a schematic overview depicting a DL sub-frame comprising a relay 25 control channel, Figure 9 is a schematic overview depicting a DL sub-frame comprising a CCE belonging to a ePDCCH, Figure 10 is a schematic overview depicting Frequency Division Duplex (FDD) and Time Division Duplex (TDD), 30 Figure 11 is a schematic overview depicting a frame structure in time and frequency for LTE in case of Frequency Division Duplex (FDD) and Time Division Duplex (TDD), Figure 12 is a schematic overview depicting different configurations for LTE in case of Time Division Duplex (TDD), WO 2013/119158 PCT/SE2012/050627 12 Figure 13 shows a table depicting the available number of OFDM symbols for PDSCH for different operation modes in LTE, Figure 14 shows a table depicting the code rate with different number of OFDM symbols for the PDSCH in LTE FDD or TDD non-special subframes, 5 Figure 15 shows a table depicting the code rate with different number of OFDM symbols for the PDSCH in LTE TDD special subframes, Figure 16 is a schematic block diagram illustrating embodiments in a telecommunications system, Figure 17 is a flowchart depicting embodiments of a method in a user equipment, 10 Figure 18 is a flowchart depicting embodiments of a method in a network node, Figure 19 is a schematic block diagram of embodiments of a network node, Figure 20 is a schematic block diagram of embodiments of a user equipment. DETAILED DESCRIPTION 15 The figures are schematic and simplified for clarity, and they merely show details which are essential to the understanding of the embodiments, while other details have been left out. Throughout, the same reference numerals are used for identical or corresponding parts or steps. 20 As part of the developing the embodiments described herein, a problem will first be identified and discussed. In some scenarios, it has been noticed that one way to deal with the obvious mismatch of OFDM symbols in TDD special subframes has been introduced into the standard specification 3GPP TS 36.213 "Physical Layer Procedures". 25 Normally, for a downlink subframe, the user equipment first calculates the total number of allocated PRBs. The total number of allocated PRBs is based on the PRB resource allocation comprised in the downlink control and the procedure provided in the standard specification 3GPP TS 36.213 "Physical Layer Procedures". The total number of allocated PRBs is denoted NP. 30 Then, the transport block size (TBS) is determined by using Np = NM as the column indicator in the TBS Table 7.1.7.2.1-1 in the standard specification 3GPP TS 36.213 "Physical Layer Procedures". The column indicator indicates which column in the TBS table to look in when determining the TBS. Here, however, if the transport block is transmitted in DwPTS of the TDD special 35 subframe in the frame structure, the TBS is instead determined by the UE by using WO 2013/119158 PCT/SE2012/050627 13 Na := max [N x 0.75J, 1} as the column indicator for which column to use in the TBS Table 7.1.7.2.1-1 in the 5 standard specification 3GPP TS 36.213 "Physical Layer Procedures". Unfortunately, this does not fully address the mismatch problems when the actual number of OFDM symbols available for PDSCH deviates from the assumed 11 OFDM symbols, which consequently will reduce data throughput. 10 This is shown by the tables of Figures 14-15. Figure 14 shows the code rate with different number of OFDM symbols for the PDSCH in LTE FDD or TDD non-special subframes, i.e. for a normal downlink subframe. Figure 15 shows the code rate with different number of OFDM symbols for the PDSCH in LTE TDD special subframes, e.g. DwPTS. 15 According to one aspect, it has been observed from the tables of Figures 14-15 that the code rate becomes excessively high when the actual number of OFDM symbols for PDSCH is substantially less than the assumed 11 symbols. These cases are indicated by the areas 141, 151 in the tables of Figures 14-15. Since the user equipment will not be able to decode such high code rates, transmissions based on these indicated MCSs will 20 fail and retransmissions will be needed. According to another aspect, it has also been observed that with the mismatch of radio resource assumption, code rates for some of the MCSs deviate out of a suitable range for the wideband wireless system. Based on extensive link performance evaluation, the CQI message table in Figure 5 has been designed based on that the code rates for 25 QPSK and 16QAM should not be higher than 0.70, and that the code rates for 16QAM and 64QAM should not be lower than 0.32 and 0.40, respectively. As indicated by the areas 142, 152 in the tables of Figures 14-15, in some cases, some of the MCSs will result in a sub-optimal, or less suitable, code rate. According to a further aspect, it has also been observed that in the case of eCCH, 30 a certain number of PRBs are allocated to carry the eCCH. In a low-load scenario, the network node may also schedule a single user equipment to allow peak data rate service for the user equipment. Since the eCCH for this user equipment may occupy at least one PRB, the user equipment cannot be allocated of all downlink PRBs. Since the LTE specifications allow the use of the largest TBS only in conjunction with allocating all 35 downlink PRBs to the user equipment, peak data rate services cannot be provided if an WO 2013/119158 PCT/SE2012/050627 14 eCCH is deployed. It may therefore be seen that, in the prior art, when the actual number of OFDM symbols for PDSCH deviates from the assumed 11 OFDM symbols, data throughput will be reduced. 5 Hence, when the actual number of OFDM symbols for the downlink data transmissions on an eCCH deviates from the assumed 11 OFDM symbols, the number of suitable modulation and coding schemes (MCSs) generating suitable code rates for the downlink data transmissions will be significantly smaller. Thus, in these cases, the transport block sizes normally selected by the user equipment based on the total number 10 of PRBs allocated to a downlink data transmission may cause unsuitable modulation and coding schemes (MCSs) to be selected and used for the downlink data transmission. Using such unsuitable modulation and coding schemes may, for example, generate such high code rates in the downlink data transmissions that the downlink data transmissions will fail and retransmissions be needed. This will reduce data throughput in the 15 telecommunications system. Advantageously, since data throughput is reduced when downlink data transmissions are based on these unsuitable or sub-optimal code rates, the scheduling implementation in the network node and in the user equipment described in at least some 20 of the embodiments herein avoids using any of the MCSs indicated in the areas 151, 152, 161 and 162 shown in the tables of Figures 14-15 for the indicated number of OFDM symbols in its downlink data transmissions. This is performed by instead including a PRB offset value OR, or PRB adjustment factor A,, in the determining of the transport block size. This means that the 25 user equipment avoids these unsuitable modulation and coding schemes, which e.g. may cause the downlink data transmissions to fail and be in need of being retransmitted. Thus, a better scheduling of the downlink data transmissions on the eCCH is enabled, achieving an increasing data throughput in the telecommunications system. 30 It should also be noted that some of the embodiments described herein advantageously avoids complicating the operations of the scheduling algorithms in the network node. This is because some of the unsuitable MCSs that are avoided are located in the middle of the MCS index range. This is otherwise known to complicate the operations of the scheduling algorithms in the network node.
WO 2013/119158 PCT/SE2012/050627 15 Another advantage of some embodiments described herein is that they allow peak data rates to be achieved in an LTE system configured with eCCHs. A further advantage of some embodiments described herein is that they further allow fine-tuning of code rates to achieve a better system performance. 5 Figure 16 depicts a telecommunications system 100 in which embodiments herein may be implemented. The cellular communications system 100 is a wireless communication network such as an LTE, WCDMA, GSM network, any 3GPP cellular network, or any cellular network or system. 10 The telecommunications system 100 comprises a network node 110, which may be a base station. The network node 110 serves a cell 115. The network node 110 may in this example e.g. be an eNB, an eNodeB, or a Home Node B, a Home eNode B, a femto Base Station (BS), a pico BS or any other network unit capable to serve a user equipment 15 or a machine type communication device which are located in the cell 115 in the telecommunications system 100. A user equipment 121 is located within the cell 115. The user equipment 121 is configured to communicate within the telecommunications system 102 via the network 20 node 110 over a radio link 130 when the user equipment 121 is present in the cell 115 served by the network node 110. The user equipment 121 may e.g. be a mobile terminal, a wireless terminal, a mobile phone, a computer such as e.g. a laptop, a Personal Digital Assistant (PDA) or a tablet computer, sometimes referred to as a surf plate, with wireless capability, a device equipped with a wireless interface, such as a printer or a file storage 25 device or any other radio network unit capable of communicating over a radio link in a telecommunications system. Embodiments of a method in the user equipment 121 will now be described with reference to the flowchart depicted in Figures 17. The flowchart in Figure 17 describes a 30 method in the user equipment 121 for determining a transport block size. The transport block size is used by the user equipment 121 in receiving downlink data transmissions from the network node 110 on an enhanced Control CHannel, eCCH. The user equipment 121 and the network node 110 are comprised in a telecommunications system 100. The user equipment 121 has access to a table of predetermined transport block sizes. The WO 2013/119158 PCT/SE2012/050627 16 table of predetermined transport block sizes may, for example, be the TBS table 7.1.7.2.1 1 in the standard specification 3GPP TS 36.213 "Physical Layer Procedures". Figure 17 is an illustrating example of exemplary actions or operations which may be taken by a user equipment 121. It should be appreciated that the flowchart diagram is 5 provided merely as an example and that the user equipment 121 may be configured to perform any of the exemplary actions or operations provided herein. It should be appreciated that the actions or operations illustrated below are merely examples, thus it is not necessary for all the actions or operations to be performed. It should also be appreciated that the actions or operations may be performed in any combination or 10 suitable order. The flowchart in Figure 17 comprises the following actions, and may also be implemented for any of the above and below mentioned embodiments or in any combination with those. Action 1701 15 In this optional action, the user equipment 121 may determine a condition. The presence of the condition triggers the calculating of an indicator, e.g. the indicator NP described in Action 1703. In other words, the user equipment 121 may determine a condition to trigger the calculation of a modulated transport block size. This means that the user equipment 121 may determine a condition, a presence of said condition 20 triggering the calculating of the indicator N,,,B. In some embodiments, the condition may be that the user equipment 121 receives communications and/or a communication request on an eCCH from the network node 110. The eCCH may here be located in a user equipment-specific search space. In some embodiments, the user equipment 121 may determine a transport block size according to 25 actions described below, when the user equipment 121 receives the downlink eCCH in the UE-specific search space. According to these embodiments, this means that the user equipment 121 may optionally not determine a transport block size according to actions described below, when it receives the downlink eCCH in the common search space. In some embodiments, the condition may be that the user equipment 121 receives 30 a request from the network node 110 to calculate the modulated transport block size. It should be noted that the calculation of the modulated transport block size may be considered as determining or obtaining the modulated transport block size. Action 1702 WO 2013/119158 PCT/SE2012/050627 17 This is an optional action. The user equipment 121 may here receive a PRB offset value OPRB, or a PRB adjustment factor APRB. Alternatively, the user equipment 121 may be configured with values for the PRB offset value OPaB, or the PRB adjustment factor APRB 5 In some embodiments, the user equipment 121 may receive the PRB offset value OPRB, or the PRB adjustment factor A, , before the user equipment 121 starts to receive downlink data transmissions on the eCCH from the network node 110. In some embodiments, the user equipment 121 may receive the PRB offset value OR, or the PRB adjustment factor APRB , in an RRC message comprised in a 10 downlink transmission from the network node 110 scheduled in a Physical Downlink Control CHannel, PDCCH. This means that the PRB offset value(s) ORB or the PRB adjustment factor(s) APRB may be configured with Radio Resource Control (RRC) signalling. In other words, the user equipment 121 may retrieve computational parameters. In 15 some embodiments, the user equipment 121 may retrieve the computational parameters from the received request, communication request or communication from the network node 110. This means that the communication request may comprise the PRB offset value OPRB, or the PRB adjustment factor APR . In some embodiments, the user equipment 121 may retrieve the computational parameters using downlink eCCHs. In some 20 embodiments, different user equipments 121 may be configured with different PRB offset values OPaB or different the PRB adjustment factors APRB via dedicated control signalling. In some embodiments, the PRB offset value(s) OPRB or PRB adjustment factor(s) AR may also be given by a fixed value(s) in the user equipment 121. The fixed values of the PRB offset value(s) OB or PRB adjustment factor(s) ARB may be used, for 25 example, if the user equipment 121 is configured to use eCCH for at least one of the following downlink assignment, uplink grants, or power control. In some embodiments, the user equipment 121 may apply default PRB offset values OPRB, or adjustment factors APRB, that do not require explicit signalling from the network node 110, but are determined by the user equipment 121 based on e.g. the 30 configured transmit mode, rank, CFI, number of CRS ports, number of configured PRB pairs for eCCH, etc. If the PRB offset(s) Osor adjustments factors APRB are signalled to WO 2013/119158 PCT/SE2012/050627 18 the user equipment 121 by the network node 110, the default PRB offset values OpRB or adjustment factors APRB may be overridden through RRC signalling. In some embodiments, the user equipment 121 may give a higher priority to the PRB offset valuesOPRB, or the PRB adjustment factors APRB, that are received in a 5 communication request from the network node 110, than to the PRB offset values ORB, or the PRB adjustment factors ARB , retrieved by the user equipment 121. In some embodiments, more than one user equipment 121 may be configured with an identical PRB offset value OR or identical PRB adjustment factor via control signals addressing the more than one user equipment 121. 10 In summary, this action means that the user equipment 121 may retrieve the PRB offset value OPRBor the PRB adjustment factor APRB used in calculating the indicator NR described in Action 1703. Action 1703 15 In this action, the user equipment 121 calculates an indicator N,, based on the total number of PRBs allocated to the downlink data transmission Np , and based on an PRB offset value ORB or a PRB adjustment factor ARB. This is performed in order to achieve a more suitable indicator than total number of PRBs allocated to the downlink data transmission NP in the actual TBS determination. It should be noted that the 20 calculation of the indicator NPRB may be considered as determining or obtaining the indicator NPRB. In other words, the user equipment 121 may dynamically calculate a modulated transport block size. This means that the user equipment 121 uses at least one PRB offset value OP, or at least one PRB adjustment factor ARB, in the actual TBS 25 determination. The PRB offset value(s) ORB may, for example, be a positive or a negative number(s). The adjustment factor APRB may, for example, be larger or smaller than 1. In the embodiments below, the user equipment 121 first calculates the total number of allocated PRBs, N'RB, based on the PRB resource allocation comprised in the 30 downlink control and the procedure provided in the specification.
WO 2013/119158 PCT/SE2012/050627 19 In some embodiments, the user equipment 121 applies a PRB offset value OPRB in the determination of the transport block size in all subframes. In this case, if the transport block is transmitted in DwPTS of the special subframe 5 in the frame structure, then the indicator NPRB may be calculated using the equation (Eq. 1) below: N = min(max(LN,, x 0.75]+ 0,,., 1,1 10} (Eq. 1) 10 Otherwise, in this case, the indicator Np may be calculated using the equation (Eq. 2) below: NRB= min max(N;,, + O,,,,110) (Eq. 2) 15 In some embodiments, the user equipment 121 applies a PRB offset value O PRBin the determination of TBS only in non-special subframes. In this case, if the transport block is transmitted in DwPTS of the special subframe in the frame structure, then the indicator N,, is calculated using the equation (Eq. 3) below: 20 NjR = max N RB0.75], 1) (Eq. 3) Otherwise, in this case, the indicator N,. may be calculated using the equation (Eq. 4) below: 25 NpB =minfmax{N', +OpR,, I , 110 (Eq. 4) Here, in some embodiments, the user equipment 121 may apply different PRB offset values OPRB in the determination of TBS in different subframes based on the 30 subframe number. This means that the user equipment 121 may comprise more than one WO 2013/119158 PCT/SE2012/050627 20 PRB offset value PRB and also may apply different PRB offset values OPRB in different subframes based on the subframe number of the subframes in the different subframes. In some embodiments, the user equipment 121 may apply different PRB offset values ORB in different subframes based on if there are additional reference signals 5 present. Examples of such additional reference signals may be CSI reference signals or positioning reference signals. Other examples of such additional reference signals may be that the subframe comprises PDCCH, PHICH, PCFICH, PSS, SSS or PBCH. This means that the user equipment 121 may comprise more than one PRB offset valueOPRBand further may apply different PRB offset valuesOPRB in different subframes based on the 10 presence of additional signals. It should also be noted that this calculation may be applied when the NPRB value is greater than the PRB threshold value, TPRB This means that, in some embodiments, the calculating which applies a PRB offset value ORB in the determination of the transport block size is performed if NP is larger than a physical resource block threshold TPRB. 15 This may advantageously be used in order to reach certain peak rates. For instance, the PRB offset value OPRB applies only when NpRB is equal to the total number of DL RBs in the system bandwidth minus one and the PRB offset value OPRB is then plus one. This ensures that the peak rate can be achieved when scheduled from eCCH. 20 In some embodiments, the user equipment 121 applies a PRB adjustment factor APRB in the determination of the transport block size in all subframes. In this case, if the transport block is transmitted in DwPTS of the special subframe in the frame structure, then the indicator NPRH may be calculated using the equation (Eq. 5) below: 25 NPRB = min{ maxLN,,, x O.75x AJ 1}, 1 10 (Eq. 5) Otherwise, in this case, the indicator Npna may be calculated using the equation (Eq. 6) below: 30 NpR, = min{ max JV,,,, x APRB l},110 (Eq. 6) WO 2013/119158 PCT/SE2012/050627 21 In some embodiments, the user equipment 121 applies a PRB adjustment factor AP. in the determination of TBS only in non-special subframes. In this case, if the transport block is transmitted in DwPTS of the special subframe 5 in the frame structure, then the indicator NR may be calculated using the equation (Eq. 7) below: N =max {N'RB x0.75J, 1} (Eq. 7) 10 Otherwise, in this case, the indicator NR may be calculated using the equation (Eq. 8) below: NPRB = min{ maxtNp x A, 1}, 110} (Eq. 8) 15 Here, in some embodiments, the user equipment 121 may apply different PRB offset values O. in the determination of TBS in different subframes based on the subframe number. This means that the user equipment 121 may comprise more than one PRB adjustment factor ApRB, and also may apply different PRB adjustment factors ApRB in different subframes based on the subframe number of the subframes in the different 20 subframes. In some embodiments, the user equipment 121 may apply different PRB offset values OPRB in different subframes based on if there are additional reference signals present. Examples of such additional reference signals may be CSI reference signals or positioning reference signals. Other examples of such additional reference signals may be 25 that the subframe comprises PDCCH, PHICH, PCFICH, PSS, SSS or PBCH. This means that the user equipment 121 comprises more than one PRB adjustment factor APRB , and further may apply different PRB adjustment factors APRB , in different subframes based on the presence of additional signals. It should also be noted that this calculation may be applied when the N' value 30 is greater than the PRB threshold value, TR. This means that, in some embodiments, the calculating which applies a PRB adjustment factor APRB in the determination of the WO 2013/119158 PCT/SE2012/050627 22 transport block size is performed if NR is larger than a physical resource block threshold TFR. This may advantageously be used in order to reach certain peak rates. For instance, the PRB adjustment factor APRB applies only when NpB is equal to the total number of DL RBs in the system bandwidth minus one and the PRB adjustment factor 5 AR is then plus one. This ensures that the peak rate can be achieved when scheduled from eCCH. Action 1704 In this action, the user equipment 121 determines the transport block size from the 10 table of predetermined transport block sizes based on at least the calculated indicator N, . In some embodiments, the user equipment 121 applies a PRB offset value 0,R in the determination of the transport block size in all subframes. In this case, if the transport block is transmitted in DwPTS of the special subframe 15 in the frame structure, then the transport block size is determined by using the indicator NR is calculated using the equation Eq. 1 in Action 1703 as the column indicator in the table of predetermined transport block sizes, e.g. the transport block size table 7.1.7.2.1-1 in the in the standard specification 3GPP TS 36.213 "Physical Layer Procedures". Otherwise, in this case, the transport block size is determined by using the 20 indicator NR that is calculated using the equation Eq. 2 in Action 1703 as the column indicator in the table of predetermined transport block sizes, e.g. the transport block size table 7.1.7.2.1-1 in the in the standard specification 3GPP TS 36.213 "Physical Layer Procedures". In some embodiments, the user equipment 121 applies a PRB offset value OB in 25 the determination of TBS only in non-special subframes. In this case, if the transport block is transmitted in DwPTS of the special subframe in the frame structure, then the transport block size is determined by using the indicator NPRB is calculated using the equation Eq. 3 in Action 1703 as the column indicator in the table of predetermined transport block sizes, e.g. the transport block size table 7.1.7.2.1-1 in the in the standard specification 30 3GPP TS 36.213 "Physical Layer Procedures". Otherwise, in this case, the transport block size is determined by using the indicator NPRB is calculated using the equation Eq. 4 in Action 1703 as the column WO 2013/119158 PCT/SE2012/050627 23 indicator in the table of predetermined transport block sizes, e.g. the transport block size table 7.1.7.2.1-1 in the in the standard specification 3GPP TS 36.213 "Physical Layer Procedures". 5 In some embodiments, the user equipment 121 applies a PRB adjustment factor A,. in the determination of the transport block size in all subframes. In this case, if the transport block is transmitted in DwPTS of the special subframe in the frame structure, then the transport block size is determined by using the indicator NpR is calculated using the equation Eq. 5 in Action 1703 as the column indicator in the 10 table of predetermined transport block sizes, e.g. the transport block size table 7.1.7.2.1-1 in the in the standard specification 3GPP TS 36.213 "Physical Layer Procedures". Otherwise, in this case, the transport block size is determined by using the indicator Npg is calculated using the equation Eq. 6 in Action 1703 as the column indicator in the table of predetermined transport block sizes, e.g. the transport block size 15 table 7.1.7.2.1-1 in the in the standard specification 3GPP TS 36.213 "Physical Layer Procedures". In some embodiments, the user equipment 121 applies a PRB adjustment factor AR in the determination of TBS only in non-special subframes. In this case, if the transport block is transmitted in DwPTS of the special subframe 20 in the frame structure, then the transport block size is determined by using the indicator NpR is calculated using the equation Eq. 7 in Action 1703 as the column indicator in the table of predetermined transport block sizes, e.g. the transport block size table 7.1.7.2.1-1 in the in the standard specification 3GPP TS 36.213 "Physical Layer Procedures". Otherwise, in this case, the transport block size is determined by using the 25 indicator NpB is calculated using the equation Eq. 8 in Action 1703 as the column indicator in the table of predetermined transport block sizes, e.g. the transport block size table 7.1.7.2.1-1 in the in the standard specification 3GPP TS 36.213 "Physical Layer Procedures". 30 It should also be noted that according to some embodiments, if a user equipment 121 is configured to use eCCH for e.g. downlink assignments, uplink grants and power control, the user equipment 121 may determine its allocated transport block size NPR, at WO 2013/119158 PCT/SE2012/050627 24 least for some assignments or grants by using at least one PRB offset value, OR or at least one PRB adjustment factor, A, . Action 1705 5 In this optional action, the user equipment 121 may receive downlink data transmissions using the determined transport block size. In other words, the user equipment 121 may receive the downlink data using the modulated transport block size. 10 Embodiments of a method in the network node 110 will now be described with reference to the flowchart depicted in Figures 18. The flowchart in Figure 18 describes a method in the network node 110 for determining a transport block size. The transport block size is used by the network node 110 in transmitting downlink data transmissions to the user equipment 121 on an enhanced control channel, eCCH. The network node 110 15 and the user equipment 121 are comprised in a telecommunications system. The network node 110 has access to a table of predetermined transport block sizes. The table of predetermined transport block sizes may, for example, be the TBS table 7.1.7.2.1-1 in the standard specification 3GPP TS 36.213 "Physical Layer Procedures". Figure 18 is an illustrating example of detailed exemplary actions or operations 20 which may be taken by the network node 110. It should be appreciated that the flowchart diagram is provided merely as an example and that the network node 110 may be configured to perform any of the exemplary actions or operations provided herein. It should be appreciated that the actions or operations illustrated below are merely examples, thus it is not necessary for all the actions or operations to be performed. It 25 should also be appreciated that the actions or operations may be performed in any combination. Hence, the flowchart in Figure 18 comprises the following actions, and may also be implemented for any of the above and below mentioned embodiments or in any combination with those. 30 Action 1801 In this optional action, the network node 110 may transmit a communication request to the user equipment 121, which communication request comprises the PRB offset valueOR, or the PRB adjustment factorA, .
WO 2013/119158 PCT/SE2012/050627 25 Alternatively, in some embodiments, the network node 110 may transmit the PRB offset value OPRB, or the PRB adjustment factor APRB, in an RRC message comprised in a downlink transmission scheduled in a PDCCH. This means that the PRB offset value(s) OPRB or the PRB adjustment factor(s) ARB may be configured by the network node 110 5 with RRC signalling. In some embodiments, the network node 110 may configure different user equipments with different PRB offset values OPRB or different the PRB adjustment factors A, via dedicated control signalling. Also, in some embodiments, the network node 110 may configure more than one user equipment 121 with an identical PRB offset value OPRB 10 or identical PRB adjustment factor via control signals addressing the more than one user equipment 121. In some embodiments, the network node 110 may transmit the PRB offset value OpR, or the PRB adjustment factor APR , to the user equipment 121 before the user equipment 121 starts to receive downlink data transmissions on the eCCH from the 15 network node 110. In some embodiments, the network node 110 may transmit the communication request and/or the communication on an eCCH. The eCCH may here be located in a user equipment-specific search space. In some embodiments, the network node 110 may transmit a request to the user equipment 121 to calculate the modulated transport block size. 20 Action 1802 In this action, the network node 110 calculates an indicator N,, based on the total number of PRBs allocated to the downlink data transmission N,,, and based on an PRB offset valueOPRB, or a PRB adjustment factor ApRB. It should be noted that the 25 calculation of the indicator NP., may be considered as determining or obtaining the indicator N, . These calculations may be performed by the network node 110 in the same way as described for the user equipment 121 in Action 1703. This means that the network node 110 may calculate the indicator NR, according to any one of the equations Eq. 1-8 30 as described above in Action 1703. In some embodiments, this also means that the WO 2013/119158 PCT/SE2012/050627 26 network node 110 may perform the calculations if NPRU is larger than a physical resource block threshold T.. Action 1803 5 In this action, the network node 110 determines the transport block size from the table of predetermined transport block sizes based on at least the calculated indicator N.. The determination may be performed by the network node 110 in the same way as described for the user equipment 121 in Action 1704. 10 Action 1804 In this action, the network node 110 transmit, to the user equipment 121, downlink data transmissions using the determined transport block size. In other words, the user equipment 121 may transmit downlink data using the modulated transport block size. 15 The example embodiments presented herein may be utilized in a radio network, which may further comprise network nodes, such as, a base station 110, as illustrated in Figure 19. The radio network may also comprise a user equipment 121, as illustrated in 20. It should be appreciated that the examples provided in Figures 19 and 20 are shown merely as non-limiting examples. According to the example embodiments, the network 20 node 110 and user equipment 121 may be any other node as described in the examples provided in the above sections. As shown in Figure 19, the example network node 110 may comprise processing circuitry 1903, a memory 1902, radio circuitry 1901, and at least one antenna. The processing circuitry 1903 may comprise RF circuitry and baseband processing circuitry 25 (not shown). In particular embodiments, some or all of the functionality described above as being provided by a mobile base station, a base station controller, a relay node, a NodeB, an enhanced NodeB, positioning node, and/or any other type of mobile communications node may be provided by the processing circuitry 1903 executing instructions stored on a computer-readable medium, such as the memory 1902 shown in 30 Figure 19. Alternative embodiments of the network node 110 may comprise additional components responsible for providing additional functionality, comprising any of the functionality identified above and/or any functionality necessary to support the solution described above. In other example embodiments, a network node may be not equipped with a radio interface or radio circuitry 1901.
WO 2013/119158 PCT/SE2012/050627 27 It should also be appreciated that the processing circuitry, or any other hardware and/or software unit configured to execute operations and/or commands, of the network node 110 illustrated in Figure 19 may be configured to configure to calculate a modified transport block size and/or provide computational parameters to be used in the calculation 5 of a modified block size as described in the exemplary embodiments provided above. An example of a user equipment 121 is provided in Figure 14. The example user equipment 121 may comprise processing circuitry 2002, a memory 2003, radio circuitry 2001, and at least one antenna. The radio circuitry 2001 may comprise RF circuitry and 10 baseband processing circuitry (not shown). In particular embodiments, some or all of the functionality described above as being provided by mobile communication devices or other forms of wireless device may be provided by the processing circuitry 2002 executing instructions stored on a computer-readable medium, such as the memory 2003 shown in Figure 20. Alternative embodiments of the user equipment 121 may comprise additional 15 components responsible for providing additional functionality, comprising any of the functionality identified above and/or any functionality necessary to support the solution described above. It should be appreciated that the processing circuitry (or any other hardware and/or software unit configured to execute operations and/or commands) of the user 20 equipment 121 may be configured to calculate a modified transport block size. The user equipment may be further configured to perform any of the exemplary operations described above. To perform the method actions for determining a transport block size, the network 25 node 110 comprises the following arrangement depicted in Figure 19. Figure 19 shows a schematic block diagram of embodiments of the network node 110. The transport block size is used by the network node 110 in transmitting downlink data transmissions to the user equipment 121 on an eCCH. The network node 110 and the user equipment 121 are comprised in a telecommunications system 100. The network 30 node 110 has access to a table of predetermined transport block sizes. The network node 110 may comprise a radio circuitry 1901. The radio circuitry 1901 may be configured to transmit, to the user equipment 121, downlink data transmissions using the determined transport block size. The radio circuitry 1901 may also be configured to transmit a communication request to the user equipment 121. The WO 2013/119158 PCT/SE2012/050627 28 communication request may comprise the PRB offset value O,, or the PRB adjustment factor A, . The network node 110 comprises a processing circuitry 1903 configured to calculate an indicator N,, based on the total number of PRBs allocated to the downlink 5 data transmission NPRB, and on an PRB offset value 0,R, or a PRB adjustment factor A,.. It should be noted that the calculation of the indicator NR may be considered as determining or obtaining the indicator NR .. The processing circuitry 1903 is further configured to determine the transport block size from the table of predetermined transport block sizes based on at least the calculated indicator NPR. 10 The processing circuitry 1903 may further be configured to calculate the indicator NR according to any one of the equations Eq. 1-8 as described above. Also, the processing circuitry 1903 may further be configured to perform the calculations if NpR is larger than a physical resource block threshold TPRB' 15 To perform the method actions for determining a transport block size, the user equipment 121 comprises the following arrangement depicted in Figure 20. Figure 20 shows a schematic block diagram of embodiments of the user equipment 121. The transport block size is used by the user equipment 121 in receiving downlink data transmissions from a network node 110 on an enhanced Control CHannel, eCCH. 20 The user equipment 121 and the network node 110 are comprised in a telecommunications system 100. The user equipment 121 has access to a table of predetermined transport block sizes. The user equipment 121 may further comprise a radio circuitry 2001. The radio circuitry 2101 may be configured to receive downlink data transmissions using the 25 determined transport block size. The user equipment 121 comprises a processing circuitry 2002 configured to calculate an indicator NpRB based on the total number of PRBs allocated to the downlink data transmission NPR , and based on an PRB offset value OB or a PRB adjustment factor APR. It should be noted that the calculation of the indicator NR may be 30 considered as determining or obtaining the indicator NpRB. The processing circuitry 2002 WO 2013/119158 PCT/SE2012/050627 29 is further configured to determine the transport block size from the table of predetermined transport block sizes based on at least the calculated indicator NR . The processing circuitry 2002 may further be configured to determine a condition, a presence of said condition triggering the calculating of the indicator N.. The condition 5 may be receiving communications and/or a communication request on the eCCH. The eCCH may be located in a user equipment-specific search space. The condition may also be receiving a communication request from the network node 110 to calculate the transport block size. The communication request may comprise the PRB offset value OB, or the PRB adjustment factor A, . 10 The processing circuitry 2002 may further be configured to retrieve the PRB offset value OR, or the PRB adjustment factor APRB ,to be used in the calculation. The processing circuitry 2102 may further be configured to receive the PRB offset value OPRB, or the PRB adjustment factor AP, before the user equipment 121 starts to receive downlink data transmissions on the eCCH from the network node 110, or receive the PRB 15 offset valueOpRB, or the PRB adjustment factor APR, in an RRC message comprised in a downlink transmission from the network node 110 scheduled in a Physical Downlink Control CHannel, PDCCH. The processing circuitry 2002 may further be configured to calculate the indicator NP according to any one of the equations Eq. 1-8 as described above. 20 The processing circuitry 2002 may further be configured to apply different PRB offset values OPRB, or PRB adjustment factors APRB, in different subframes based on the subframe number, when the user equipment 121 comprises more than one PRB offset value OpR, or PRB adjustment factor ARB. Also, when the user equipment 121 comprises more than one PRB offset value 0 PRR, or PRB adjustment factor APR, the processing 25 circuitry 2002 may further be configured to apply different PRB offset valuesOPRB, or PRB adjustment factors APRB in different subframes based on the presence of additional reference signals. The processing circuitry 2002 may also be configured to perform the calculations if N. is larger than a physical resource block threshold TRB. Furthermore, the processing 30 circuitry 2002 may be configured to give PRB offset valuesOPRB, or the PRB adjustment factors ARB , received in a communication request from the network node 110 a higher WO 2013/119158 PCT/SE2012/050627 30 priority over PRB offset values OP, or the PRB adjustment factors A,,,, retrieved by the user equipment 121. The description of the example embodiments provided herein have been 5 presented for purposes of illustration. The description is not intended to be exhaustive or to limit example embodiments to the precise form disclosed, and modifications and variations are possible in light of the above teachings or may be acquired from practice of various alternatives to the provided embodiments. The examples discussed herein were chosen and described in order to explain the principles and the nature of various example 10 embodiments and its practical application to enable one skilled in the art to utilize the example embodiments in various manners and with various modifications as are suited to the particular use contemplated. The features of the embodiments described herein may be combined in all possible combinations of methods, apparatus, modules, systems, and computer program products. It should be appreciated that the example embodiments 15 presented herein may be practiced in any combination with each other. It should be noted that the word "comprising" does not necessarily exclude the presence of other elements or steps than those listed and the words "a" or "an" preceding an element do not exclude the presence of a plurality of such elements. It should further be noted that any reference signs do not limit the scope of the claims, that the example 20 embodiments may be implemented at least in part by means of both hardware and software, and that several "means", "units' or "devices" may be represented by the same item of hardware. A "device" as the term is used herein, is to be broadly interpreted to include a radiotelephone having ability for Internet/intranet access, web browser, organizer, 25 calendar, a camera (e.g., video and/or still image camera), a sound recorder (e.g., a microphone), and/or global positioning system (GPS) receiver; a personal communications system (PCS) terminal that may combine a cellular radiotelephone with data processing; a personal digital assistant (PDA) that can include a radiotelephone or wireless communication system; a laptop; a camera (e.g., video and/or still image 30 camera) having communication ability; and any other computation or communication device capable of transceiving, such as a personal computer, a home entertainment system, a television, etc. Although the description is mainly given for a user equipment, as measuring or recording unit, it should be understood by the skilled in the art that "user equipment" is a 35 non-limiting term which means any wireless device or node capable of receiving in DL and WO 2013/119158 PCT/SE2012/050627 31 transmitting in UL (e.g. PDA, laptop, mobile, sensor, fixed relay, mobile relay or even a radio base station, e.g. femto base station). A cell is associated with a radio node, where a radio node or radio network node or eNodeB used interchangeably in the example embodiment description, comprises in a 5 general sense any node transmitting radio signals used for measurements, e.g., eNodeB, macro/micro/pico base station, home eNodeB, relay, beacon device, or repeater. A radio node herein may comprise a radio node operating in one or more frequencies or frequency bands. It may be a radio node capable of CA. It may also be a single- or muti RAT node. A multi-RAT node may comprise a node with co-located RATs or supporting 10 multi-standard radio (MSR) or a mixed radio node. The various example embodiments described herein are described in the general context of method steps or processes, which may be implemented in one aspect by a computer program product, embodied in a computer-readable medium, including computer-executable instructions, such as program code, executed by computers in 15 networked environments. A computer-readable medium may include removable and non removable storage devices including, but not limited to, Read Only Memory (ROM), Random Access Memory (RAM), compact discs (CDs), digital versatile discs (DVD), etc. Generally, program modules may include routines, programs, objects, components, data structures, etc. that perform particular tasks or implement particular abstract data types. 20 Computer-executable instructions, associated data structures, and program modules represent examples of program code for executing steps of the methods disclosed herein. The particular sequence of such executable instructions or associated data structures represents examples of corresponding acts for implementing the functions described in such steps or processes. 25 The embodiments herein are not limited to the above described preferred embodiments. Various alternatives, modifications and equivalents may be used. Therefore, the above embodiments should not be construed as limiting. 30 Abbreviations ACK Acknowledgement ARQ Automatic Repeat Request CA Carrier Aggregation 35 CAZAC Constant Amplitude Zero Auto Correlation WO 2013/119158 PCT/SE2012/050627 32 CC Component Carrier CCE Control Channel Element CFI Control Format Indicator CIF Carrier Indicator Field 5 C-RNTI Cell radio-network temporary identifier CRS Common Reference Symbols CSI Channel State Information DCI Downlink Control Information DL Downlink 10 DMRS Demodulation Reference Symbols eCCH enhanced Control CHannel ePDCCH enhanced PDCCH HARQ Hybrid Automatic Repeat Request LTE Long term evolution 15 MAC Medium Access Control MIMO Multiple-Input Multiple-Output NACK Non Acknowledgement OFDM Orthogonal Frequency Division Multiple Access PCC Primary Component Carrier 20 PDCCH Physical Downlink Control Channel PDSCH Physical Downlink Shared Channel PUCCH Physical Uplink Control Channel RB or PRB Resource block RE Resource Element 25 RNTI Radio-network temporary identifier RS Reference Signal SCC Secondary Component Carrier SINR Signal-to-Noise Ratio TPC Transmit Power Control 30 UE User equipment UL Uplink
权利要求:
Claims (50)
[1] 1. A method in a user equipment (121) for determining a transport block size, which transport block size is used by the user equipment (121) in receiving downlink data transmissions from a network node (110) on an enhanced Control CHannel, 5 eCCH, the user equipment (121) and the network node (110) being comprised in a telecommunications system (100), which user equipment (121) has access to a table of predetermined transport block sizes, the method comprising - calculating (1703) an indicator NR based on the total number of PRBs allocated to the downlink data transmission N , and based on an PRB offset 10 value 0,R or a PRB adjustment factor A, ; - determining (1704) the transport block size from the table of predetermined transport block sizes based on at least the calculated indicator NPRB.
[2] 2. The method according to claim 1, further comprising: 15 - receiving (1705) downlink data transmissions using the determined transport block size.
[3] 3. The method according to claim 1 or 2, further comprising: - determining (1701) a condition, a presence of said condition triggering the 20 calculating (1703) of the indicator N,..
[4] 4. The method according to claim 3, wherein the condition is receiving communications and/or a communication request on the eCCH. 25
[5] 5. The method according to claim 4, wherein the eCCH is located in a user equipment specific search space.
[6] 6. The method according to any of claims 3-5, wherein the condition is receiving a communication request from the network node (110) to calculate the transport 30 block size.
[7] 7.The method according to claim 6, wherein the communication request comprises the PRB offset value O,, or the PRB adjustment factor A, . WO 2013/119158 PCT/SE2012/050627 34
[8] 8. The method according to any of claims 1-7, wherein the calculating (1703) further comprises - retrieving the PRB offset valueOpR, or the PRB adjustment factor APRB used 5 in calculating (1703) the indicator N, .
[9] 9. The method according to any of claims 1-8, further comprises - receiving (1702) the PRB offset value O, , or the PRB adjustment factor AB, before the user equipment (121) starts to receive downlink data transmissions 10 on the eCCH from the network node (110); or receiving (1702) the PRB offset valueO or the PRB adjustment factor APRR in an RRC message comprised in a downlink transmission from the network node (110) scheduled in a Physical Downlink Control CHannel, PDCCH. 15
[10] 10. The method according to any of claims 1-9, wherein the calculating (1703) further comprises calculating the indicator Np, according to ,= min maxN' + Op, 11, 10}. 20
[11] 11. The method according to any of claims 1-9, wherein the calculating (1703) further comprises calculating the indicator NR according to NPRB = MinfmaxL pR, x 0.75J+ 0,, 1 I I 10). 25
[12] 12. The method according to any of claims 1-9, wherein the calculating (1703) further comprises calculating the indicator N,, according to NB = mini maxNpR x A,,J 1,110). 30
[13] 13. The method according to any of claims 1-9, wherein the calculating (1703) further comprises calculating the indicator NR according to WO 2013/119158 PCT/SE2012/050627 35 NpR = min(max [NRBxO.75x A,,, 1, 1101
[14] 14. The method according to any of claims 1-13, wherein the user equipment (121) comprises more than one PRB offset value OPRB, or PRB adjustment factor APRB , 5 and further comprises applying different PRB offset values O,, or PRB adjustment factors APRB in different subframes based on the subframe number of the subframes in the different subframes.
[15] 15. The method according to any of claims 1-13, wherein the user equipment (121) 10 comprises more than one PRB offset value ORB, or PRB adjustment factor Ap, and further comprises applying different PRB offset values O,, or PRB adjustment factors APRB ,in different subframes based on the presence of additional signals. 15
[16] 16. The method according to any of claims 1-15, wherein the calculating (1703) is performed if N R is larger than a physical resource block threshold TPRB
[17] 17. The method according to any of claims 2-16, wherein PRB offset values OPR, or the PRB adjustment factors APRB, received in a communication request from the 20 network node (110) are given a higher priority over PRB offset values OPRB, or the PRB adjustment factors AR, retrieved by the user equipment (121).
[18] 18. A user equipment (121) for determining a transport block size, which transport block size is used by the user equipment (121) in receiving downlink data 25 transmissions from a network node (110) on an enhanced Control CHannel, eCCH, the user equipment (121) and the network node (110) being comprised in a telecommunications system (100), which user equipment (121) has access to a table of predetermined transport block sizes, the user equipment (121) comprising processing circuitry (2002) configured to calculate an indicator N,, based on 30 the total number of PRBs allocated to the downlink data transmission N,,, and based on an PRB offset value 0,RB or a PRB adjustment factor APRB , and WO 2013/119158 PCT/SE2012/050627 36 determine the transport block size from the table of predetermined transport block sizes based on at least the calculated indicator NP,1
[19] 19. The user equipment (121) according to claim 18, further comprising a radio 5 circuitry (2001), wherein the radio circuitry (2001) is configured to receive downlink data transmissions using the determined transport block size.
[20] 20. The user equipment (121) according to claim 18 or 19, wherein the processing circuitry (2002) is further configured to determine a condition, a presence of said 10 condition triggering the calculating of the indicator N,,,,.
[21] 21. The user equipment (121) according to claim 20, wherein the condition is receiving communications and/or a communication request on the eCCH. 15
[22] 22. The user equipment (121) according to claim 21, wherein the eCCH is located in a user equipment-specific search space.
[23] 23. The user equipment (121) according to any of claims 19-22, wherein the condition is receiving a communication request from the network node (110) to calculate the 20 transport block size.
[24] 24. The user equipment (121) according to claim 23, wherein the communication request comprises the PRB offset value 0.,. or the PRB adjustment factor APRB.
[25] 25 25. The user equipment (121) according to any of claims 18-24, wherein the processing circuitry (2002) is further configured to retrieve the PRB offset value OPRB,or the PRB adjustment factor APR ,to be used in the calculation.
[26] 26. The user equipment (121) according to any of claims 18-25, wherein the 30 processing circuitry (2002) is further configured to receive the PRB offset value OPRB, or the PRB adjustment factor APRB , before the user equipment (121) starts to receive downlink data transmissions on the eCCH from the network node (110), or receive the PRB offset valueOpRB, or the PRB adjustment factor APRR in WO 2013/119158 PCT/SE2012/050627 37 an RRC message comprised in a downlink transmission from the network node (110) scheduled in a Physical Downlink Control CHannel, PDCCH.
[27] 27. The user equipment (121) according to any of claims 18-26, wherein the 5 processing circuitry (2002) is further configured to calculate the indicator N, according to NPR = min{ maxN' +0,,,1},110}. 10
[28] 28. The user equipment (121) according to any of claims 18-26, wherein the processing circuitry (2002) is further configured to calculate the indicator N, according to N,,H = min maxim LN,,, x0.75]+0,,,,11,110). 15
[29] 29. The user equipment (121) according to any of claims 18-26, wherein the processing circuitry (2002) is further configured to calculate the indicator NPH according to 20 NRa = min(maxtNp,, x Ap,,J 1), 110.
[30] 30. The user equipment (121) according to any of claims 18-26, wherein the processing circuitry (2002) is further configured to calculate the indicator N, according to 25 NR = min maxILNI,, x 0.75 x APRBJ1,110
[31] 31. The user equipment (121) according to any of claims 18-30, further comprising more than one PRB offset value O,, or PRB adjustment factor AR, and the 30 processing circuitry (2002) is further configured to apply different PRB offset values OB, or PRB adjustment factors A,, in different subframes based on the subframe number. WO 2013/119158 PCT/SE2012/050627 38
[32] 32. The user equipment (121) according to any of claims 18-30, further comprising more than one PRB offset value 0 PRB, or PRB adjustment factor A.,, and the processing circuitry (2002) is further configured to apply different PRB offset 5 values OPRB, or PRB adjustment factors ApRB, in different subframes based on the presence of additional reference signals.
[33] 33. The user equipment (121) according to any of claims 18-32, wherein the processing circuitry (2002) is configured to perform the calculations if NPRn is 10 larger than a physical resource block threshold TPRB.
[34] 34. The user equipment (121) according to any of claims 18-33, wherein the processing circuitry (2002) is configured to give PRB offset valuesO, , or the PRB adjustment factors AP, received in a communication request from the 15 network node (110) a higher priority over PRB offset valuesOPRB, or the PRB adjustment factors APRB, retrieved by the user equipment (121).
[35] 35. A method in a network node (110) for determining a transport block size, which transport block size is used by the network node (110) in transmitting downlink 20 data transmissions to the user equipment (121) on an enhanced control channel, eCCH, the network node (110) and the user equipment (121) being comprised in a telecommunications system (100), which network node (110) has access to a table of predetermined transport block sizes, the method comprising - calculating (1802) an indicator NPRB based on the total number of PRBs 25 allocated to the downlink data transmission N , and based on an PRB offset value OPRB, or a PRB adjustment factor APRB ; - determining (1803) the transport block size from the table of predetermined transport block sizes based on at least the calculated indicator N,,,, 30
[36] 36. The method according to claim 35, further comprising - transmitting (1804), to the user equipment (121), downlink data transmissions using the determined transport block size. WO 2013/119158 PCT/SE2012/050627 39
[37] 37. The method according to claim 35 or 36, further comprising - transmitting (1801) a communication request to the user equipment (121), which communication request comprises the PRB offset valueOPRB, or the 5 PRB adjustment factor APRB.
[38] 38. The method according to any of claims 35-37, wherein the calculating (1802) further comprises calculating the indicator NpR according to 10 N,, = min[ maxNin + O,,,}, 1 10}.
[39] 39. The method according to any of claims 35-37, wherein the calculating (1802) further comprises calculating the indicator N,,,, according to 15 N,,, = minimax{LV,,,. x 0.75J+ OPRB,1101.
[40] 40. The method according to any of claims 35-37, wherein the calculating (1802) further comprises calculating the indicator N,,RB according to 20 N,, = min(maxLNE, x A,,,J) 1 Io.
[41] 41. The method according to any of claims 35-37, wherein the calculating (1802) further comprises calculating the indicator NP, according to N,, =mindmaxLNPx 0.75 x A,.. J1, 110}. 25
[42] 42. The method according to any of claims 35-41, wherein the calculating (1802) is performed if NPnB is larger than a physical resource block threshold TPRB.
[43] 43. A network node (110) for determining a transport block size, which transport block 30 size is used by the network node (110) in transmitting downlink data transmissions to the user equipment (121) on an enhanced control channel, eCCH, the network node (110) and the user equipment (121) being comprised in a WO 2013/119158 PCT/SE2012/050627 40 telecommunications system (100), which network node (110) has access to a table of predetermined transport block sizes, the network node (110) comprising processing circuitry (1903) configured to calculate an indicator NPR based on the total number of PRBs allocated to the downlink data transmission NPR, and 5 on an PRB offset value Opr, or a PRB adjustment factor ApRB, and to determine the transport block size from the table of predetermined transport block sizes based on at least the calculated indicator NPRB .
[44] 44. The network node (110) according to claim 43, further comprising a radio circuitry 10 (1901), wherein the radio circuitry (1901) configured to transmit, to the user equipment (121), downlink data transmissions using the determined transport block size.
[45] 45. The network node (110) according to claim 43 or 44, wherein the radio circuitry 15 (1901) is further configured to transmit a communication request to the user equipment (121), which communication request comprises the PRB offset value 0 PR,, or the PRB adjustment factor ApRB.
[46] 46. The network node (110) according to any of claims 43-45, wherein the processing 20 circuitry (1903) is further configured to calculate the indicator NPR according to NPRB = min{ maxNpRB +OPI,1), 110}.
[47] 47. The network node (110) according to any of claims 43-45, wherein the processing 25 circuitry (1903) is further configured to calculate the indicator N,, according to NI = min{max{LV,,, x 0.75J+O,, 1 I10}.
[48] 48. The network node (110) according to any of claims 43-45, wherein the processing 30 circuitry (1903) is further configured to calculate the indicator N,,. according to N,,, = mini maxjN.,B x A,,B I I ,I10}. WO 2013/119158 PCT/SE2012/050627 41
[49] 49. The network node (110) according to any of claims 43-45, wherein the processing circuitry (1903) is further configured to calculate the indicator NR according to 5 N,,,~ =minlmaxLNPa xO.75xA,, 1I,10}
[50] 50. The network node (110) according to any of claims 43-49, wherein the processing circuitry (1903) is further configured to perform calculations if Np, is larger than a physical resource block threshold TPRB.
类似技术:
公开号 | 公开日 | 专利标题
US10652874B2|2020-05-12|User equipment, network node and methods therein for determining transport block size in downlink transmissions in a telecommunications system
JP2020022197A|2020-02-06|Method for performing power control and user device
JP2020080564A|2020-05-28|Transmission control execution method and user device
US9654274B2|2017-05-16|Systems and methods for mitigating self-interference
US20200205151A1|2020-06-25|Uplink channel design for slot-based transmission time interval |
US9699668B2|2017-07-04|Methods for measuring and transmitting downlink signals and apparatuses therefor
US10616018B2|2020-04-07|Data receiving method and apparatus supporting expansion modulation scheme
WO2014068891A1|2014-05-08|Systems and methods for carrier aggregation
US9923753B2|2018-03-20|Method for receiving downlink data in a wireless communication system supporting 256 QAM, and terminal therefor
US9565679B2|2017-02-07|Method for transmitting control signal for device-to-device communication and device therefor
US9461779B2|2016-10-04|Method for transmitting uplink data information in a wireless communication system and apparatus therefor
US20140126512A1|2014-05-08|Method and apparatus for transceiving a downlink harq in a wireless communication system
WO2013058571A1|2013-04-25|Method for mitigating inter-cell interference in wireless communication system and device therefor
WO2013119052A1|2013-08-15|Method for providing transmission power in wireless communication system and apparatus for same
US9979520B2|2018-05-22|Method and apparatus for receiving or transmitting downlink control signal in wireless communication system
US9554391B2|2017-01-24|Method for mitigating interference when changing use of dynamic resource in wireless communication system, and device therefor
同族专利:
公开号 | 公开日
US20180317211A1|2018-11-01|
US10652874B2|2020-05-12|
JP6013515B2|2016-10-25|
CN104106231B|2017-10-20|
EP3043498A1|2016-07-13|
PL2813018T3|2018-10-31|
US10524240B2|2019-12-31|
US10021681B2|2018-07-10|
AU2012369247C1|2019-04-18|
AU2012369247B2|2017-06-15|
WO2013119158A1|2013-08-15|
AR089897A1|2014-09-24|
CN104106231A|2014-10-15|
EP2813018B1|2018-05-02|
EP2813018A1|2014-12-17|
JP2015509673A|2015-03-30|
TR201807272T4|2018-06-21|
CN107659383A|2018-02-02|
CN107659383B|2020-11-03|
US20150009927A1|2015-01-08|
ES2681243T3|2018-09-12|
US20170105200A1|2017-04-13|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题
CN101291514B|2007-04-20|2012-01-11|中兴通讯股份有限公司|Method and device for resource distribution in wireless communication system|
KR101808671B1|2007-12-20|2017-12-13|옵티스 와이어리스 테크놀로지, 엘엘씨|Method and arrangement in a telecommunication system|
CN101651515B|2008-08-15|2012-12-12|电信科学技术研究院|Method, system and device for adaptive modulation and coding|
US8537750B2|2009-06-02|2013-09-17|Futurewei Technologies, Inc.|System and method for transport block size design for multiple-input, multiple-output in a wireless communications system|
US9030977B2|2009-10-15|2015-05-12|Qualcomm Incorporated|Methods and apparatus for transport block size determination|
JP5584357B2|2010-05-04|2014-09-03|ジョンソンコントロールズテクノロジーカンパニー|Variable speed drive|
CN101964697A|2010-09-29|2011-02-02|中兴通讯股份有限公司|Method and system for determining size of transmission block|
CN102448122B|2011-12-30|2017-07-14|中兴通讯股份有限公司|The method of transport block size and base station in a kind of determination subframe|
TR201807272T4|2012-02-06|2018-06-21|Ericsson Telefon Ab L M|The user equipment, network node, and methods therein for determining transport block size in uplink transmissions in a telecommunications system.|TR201807272T4|2012-02-06|2018-06-21|Ericsson Telefon Ab L M|The user equipment, network node, and methods therein for determining transport block size in uplink transmissions in a telecommunications system.|
GB2499786A|2012-02-23|2013-09-04|Renesas Mobile Corp|Indication of a preferred duplex operating mode|
CN113364556A|2012-03-02|2021-09-07|华为技术有限公司|Information transmission method and equipment|
US9055578B2|2012-03-15|2015-06-09|Futurewei Technologies, Inc.|Systems and methods for UE-specific search space and ePDCCH scrambling|
CN104205981B|2012-06-25|2018-01-09|Lg 电子株式会社|The method and apparatus and its equipment of the resource for downlink control channel are distributed in a wireless communication system|
CN107959562B|2012-09-07|2020-12-25|三星电子株式会社|Multiplexing resource element groups for control channel elements of a control channel|
US10033601B2|2012-12-28|2018-07-24|Industrial Technology Research Institute|Method of reporting CQI and related communication device|
US9838960B2|2012-12-28|2017-12-05|Industrial Technology Research Institute|Method of handling cell selection and related communication device|
US10285167B2|2013-09-20|2019-05-07|Qualcomm Incorporated|Uplink resource allocation and transport block size determination over unlicensed spectrum|
KR102150073B1|2013-11-29|2020-08-31|삼성전자주식회사|Multi-solution based radio system|
US10575205B2|2014-10-20|2020-02-25|Qualcomm Incorporated|Transport block size determination|
CN105992343B|2015-01-30|2020-05-26|电信科学技术研究院|Signal sending method, receiving method and device|
CN107251468B|2015-02-16|2020-04-28|华为技术有限公司|Method and equipment for transmitting data|
EP3264662B1|2015-03-18|2019-11-13|Huawei Technologies Co., Ltd.|Method and device for data transmission|
EP3764584A1|2015-07-22|2021-01-13|Samsung Electronics Co., Ltd.|Techniques for operating iot in a cellular communication system|
CN108353285B|2015-10-16|2021-02-05|华为技术有限公司|Method for determining size of transmission block, user equipment and base station|
EP3430761B1|2016-03-16|2019-11-27|Telefonaktiebolaget LM Ericsson |Wireless device, network node and methods in a wireless communication system|
US10912077B2|2016-03-23|2021-02-02|Ntt Docomo, Inc.|Base station and transmission method|
KR20180013660A|2016-07-29|2018-02-07|삼성전자주식회사|Method and apparatus for csi reporting in wireless communication system|
WO2018048282A1|2016-09-12|2018-03-15|엘지전자 주식회사|Method for transmitting or receiving channel state information between terminal and base station in wireless communication system and device for supporting same|
US10200967B2|2017-01-06|2019-02-05|Qualcomm Incorporated|Systems and methods for limiting a message size for a positioning protocol|
US10277357B2|2017-01-19|2019-04-30|Qualcomm Incorporated|Selection of modulation and coding scheme|
CN110192416A|2017-01-25|2019-08-30|华为技术有限公司|A kind of resource allocation method and device for coverage enhancement|
KR102252227B1|2017-03-23|2021-05-14|엘지전자 주식회사|Method for determining transport block size and wireless device|
WO2018230992A1|2017-06-15|2018-12-20|삼성전자 주식회사|Method and apparatus for performing channel coding and decoding in communication or broadcasting system|
US10742349B2|2017-07-21|2020-08-11|Samsung Electronics Co., Ltd|Apparatus and method for encoding and decoding channel in communication or broadcasting system|
JP2021512517A|2017-11-17|2021-05-13|中▲興▼通▲訊▼股▲ふぇん▼有限公司Zte Corporation|Methods, devices, and systems for determining transport block size in wireless communications|
KR102109412B1|2018-02-14|2020-05-12|엘지전자 주식회사|Method and apparatus for transmitting and receving wireless signals in a wireless communicaiton system|
US10873939B2|2018-04-18|2020-12-22|Commscope Technologies Llc|Selecting a modulation and coding scheme and a transmit block size in long term evolution|
法律状态:
2017-10-12| FGA| Letters patent sealed or granted (standard patent)|
2019-01-17| DA2| Applications for amendment section 104|Free format text: THE NATURE OF THE AMENDMENT IS AS SHOWN IN THE STATEMENT(S) FILED 18 DEC 2018 |
2019-04-18| DA3| Amendments made section 104|Free format text: THE NATURE OF THE AMENDMENT IS AS SHOWN IN THE STATEMENT(S) FILED 18 DEC 2018 |
优先权:
申请号 | 申请日 | 专利标题
US201261595226P| true| 2012-02-06|2012-02-06||
US61/595,226||2012-02-06||
PCT/SE2012/050627|WO2013119158A1|2012-02-06|2012-06-11|User equipment, network node and methods therein for determining a transport block size in downlink transmissions in a telecommunications system|
[返回顶部]