![]() Afford Mounting Kit
专利摘要:
The invention relates to a new kit (100) for mounting a baseboard (35), which is aligned with the surface (85) of the wall (8) of a room of a building and which is characterized in that it is suitable for setting the height (he). of the floor screed (7) to be applied to the floor of the shell - one with its at least one upwardly open hooking projection (21; 22) of the profile of the base strip (2) is invariably and positionally stable, preferably under positive locking (12 ), einhängbaren, downwardly open - against-Einhängvorsprung (11) einzuhängende, with its upper end surface of the upper end projection (25) of the base bar (2), preferably under positive engagement (12) od. Like., Fully applied, and with a screed height indicating foot (15) equipped on its underside, equipped with a screed height fixing gauge (1) to be removed after application and setting of the screed mass (7), and - those with its own est a counter-Einhängvorsprung (31; 32) in the at least one Einhängvorsprung (21; 22) of the profile of the base strip (2) mounting height-flexible, attachable and either itself or with the bound to it actual baseboard (35) on the underside of the laid on the screed (7) flooring ( 6) fitting auflegbare base support bar (3), as well as the mounting of the skirting board using said kit (100). 公开号:AT516533A1 申请号:T50863/2014 申请日:2014-11-28 公开日:2016-06-15 发明作者:A Martin Dolkowski 申请人:Stia - Holzindustrie Ges M B H; IPC主号:
专利说明:
Afford Mounting Kit The present invention relates to a new kit for the assembly of a with the surface of the wall, for example Massivrohwand, first layer of a drywall od. Like., A room of a building flush or flush and the bottom of the same adjacent fitting chair or skirting board , comprising - a in one close to the ground and ground parallel in the wall or in their plaster or drywall mounted longitudinal recess to be installed and to be fixed base bar with a profile cross-section with at least one of her protruding, upwardly open Einhängvorsprung and one of her wagging top skirt, and a skirting support strip having a profile cross-section with at least one downwardly-facing counter-hanger projection which is suspendable in the at least one Einhängvorsprung the baseboard and further a method for laying baseboards in rooms of buildings under Einsat z of the new baseboard installation kit. For the state of the art in this field reference is made to DE 202007003942 U1. It is there a submerged arranged in the wall base bar provided, projecting from which two approximately balcony-like projections to the room, in which the baseboard itself with their ultimately projecting towards the bottom bar, also mounted approximately inverted balcony-like counter-projections, with the baseboard supported on the underside of the floor of the room. Mention is still the DE 1929736, which describes a baseboard, which is hung with only one approximately balcony-like counter-projection in only one counter-trained projection of a fixed in a near-bottom longitudinal recess of the plaster on the shell wall of a building base bar. The invention has set itself the goal of creating a baseboard skirting board system that places high aesthetic demands on the arrangement of the baseboard with respect to their adjacent seat on the floor of a room and by their flush with the surface - usually plastered - Room wall distinguishes. Quite essential for the achievement of this goal has been found that the biggest difficulty is that in the application of the screed mass on the floor of the shell on which ultimately a floor covering is applied, this is now a Wooden floor, a floor covering based on a polymer or linoleum, a textile floor covering or a floor tiling, in most cases no adjustment of the height of the screed as accurate as possible takes place or can take place. The invention relates to a new kit, which allows for a foot or skirting system, which is basically similar to the two above-mentioned two-component system, a precise adjustment of the respective intended height of the surface of a screed to be applied. The kit according to the invention now comprises, in addition to the base strip and the baseboard to be suspended in the same, a third essential, albeit temporary component, namely a doctrine, which is as accurate as possible to indicate the respective desired or required height of the screed the applicator of the screed mass. The new kit for wall flush mounting of baseboards is characterized in that it for a precise determination of the height of the, optionally with insulation boards od. Like. Occupied, bottom of a shell screed to be applied - one with its at least one - in the at least one upwardly open Einhängvorsprung the profile of the base strip position-invariable and stable position, preferably under positive locking, attachable, downwardly open - gegen-Einhängvorsprung einzuhängende, od with its upper end surface to the upper end projection of the base bar, preferably under positive locking. The like., at least fully settable, and equipped with a screed height indicating foot projecting from underneath, after the application and setting of the screed mass to be removed screed height fixing gauge, and - finally with its at least one counter-Einhängvorsprung in at least one Einhängvorsprung the profile of the Base rail mounting height-flexible, and has either on itself or with the actual baseboard bound to it on the underside of the laid on the screed floor covering fitting layable base support bar. The advantage of the new wall-flush, actually precisely laid skirting board compared to conventional systems is in particular that it is arranged in a plane with the wall surface, which in addition to a contemporary design, the very important functional advantage that the furniture of a facility directly on the wall , so you can be placed without a distance from the same. The basic profile strip is already mounted in the shell phase or the same in the concrete, while the baseboard support bar, which carries the actual, visible baseboard with, for example, sensitive wooden surface, is mounted by the floor only after completion of the interior work. As regards the screed to be applied during the interior finishing work on the building floor or on an insulation board covering laid thereon and its height, there is a very high susceptibility to failure here, in particular due to different tolerances of the different systems. Due to the additional the third and essential components performing screed height-setting gauges, which are clipped into the to be mounted or mounted in the shell construction baseboard, the screed for adjusting the height of the screed gets very precise fixed clues. This offers not only an increase in laying comfort, but also the significant reduction of the risk of error today. It is given by the new screed height-fixing theory, the advantage of a sustainable remaining adjustment in the installed state. By using the new kit, tolerances up to a maximum of ± 5mm can be compensated for the top edge of the finished floor. A preferred flexibility in terms of combination of the two materials of baseboard and baseboard support bar is particularly when used for both aluminum profiles which, due to their material properties a non-positive, but always releasable connection of the base and the pedestal support bar with the to her allow bound actual baseboard. The base support bar has the bound to it, room-side visible actual baseboard, which structurally any customization of the respective floor covering, to the taste of the room user u.dgl. allows. Possible structure-borne sound transmissions from the floor to the wall, e.g. by an integrated Entkoppelungsband be prevented. An advantageous embodiment of the new Sohlenleisten mounting kit is that the individual, preferably made of a dimensionally stable, optionally transparent plastic formed Estrichhöhen-Festlegungslehre in addition to the at least one downwardly open counter-Einhängvorsprung has a protruding in the same direction spacer projection, which when positioning the said teaching is to be supported on the base bar and to abut the same. By means of the mentioned spacing projection, ie foot, the height of the screed application can ultimately be exactly ensured. It is also favorable if the individual screed height-setting gauge has an angle at its upper end, which is positively cooperable with one of the upper end projection of the profile of the base strip like a karniesenartig downwardly projecting end projection extension. With regard to more precise determination of the layer height of the screed application, it is also advantageous if the counter-Einhängvorsprung the screed height-setting gauge is formed with two - the respective parapet at least one upwardly open Einhängvorsprungs the profile of the base strip on both sides form-fitting circumferential - short jaws, or if the counter-Einhängvorsprung extended to the base strip and can be applied to the same and only one, namely the baseline closer, the original two short jaws present and can be suspended in the parapet of Einhängvorsprungs. In order to achieve a secure connection of the base strip to the plaster projecting from its upper end projection to a plasterboard, the wall concrete. Like., It has proved to be advantageous if the profile of the base bar at least one of the upper end projection away upwards protruding anchorage for connection to the plaster od. Like. The wall has. Another form of training, which in particular increases the usefulness of the new baseboard system, is that - not visible from the outside - the profile of the Base strip in addition to the at least one upwardly open Einhängvorsprung has at least one further projection for the support of an energy or data cable. A substantial increase in the attractiveness of the new baseboard can be achieved if below the upper end projection of the profile of the base strip, a lighting band, preferably with LED lights, is provided or attached. As a result, it is possible in a simple manner to achieve an attractive, narrow light band extending longitudinally above the skirting board. If, as further possible, the at least one downwardly open counter-Einhängvorsprung of the profile of the baseboard carrier strip at its end has an edge thickening for a position-secured seat of the above-mentioned bar in position, so a shift of the baseboard from the baseboard, which could occur, for example, in the case of violent vibrations prevented. At this point should - in addition to the kit described so far for the determination of the height of the screed - a supplementary kit with a slightly different base bar and also slightly modified screed height-fixing theory are mentioned, which is a particularly simplified installation of the baseboard on the wall in the case of today in certain cases quite desirable fair-faced concrete construction allows. In this supplementary variant, the base strip to be fastened in the near-bottom solution recess is designed to be extended downwards and the baseboard mounting auxiliary strip provided as a kit supplement in addition to the above-described height gauge is otherwise designed just like the screed height gauge for substantially positive hook-in cooperation with the base strip. only the latter does not show the foot standing away from it. Subject of the relevant variant of the invention is therefore a baseboard mounting supplement kit with the resulting from claim 9 - a total of 4 - components. As far as the overall assembly of the baseboard using the new, three basic components kit is concerned, the relevant method is essentially that 1. od within a near-bottom longitudinal recess in the plaster od. Like. The wall of a room of a building or before application od the plaster or the like. The base strip is attached to the wall, that after 2.) in at least one upwardly open Einhängvorsprung the Estrichhöhen-Festlegungslehre - under simultaneous support with its Abstützvorsprung on the base bar and under positive engagement with the upper end projection of the base bar - Is mounted with its at least one downwardly open counter-Einhängvorsprung position variable or stable position that 3.) according to the position of their Estrichhöhenanzeige foot the screed mass is applied to the height of the upper surface of this foot on the floor of the shell, that 4 .) after the screed has set the screed height-fixing gauge is removed, that after 5.) the floor covering is applied or placed on the screed floor, and that finally 6.) in the at least one upwardly open Einhängvorsprung the profile of the base strip, the baseboard support bar with their at least a downwardly open counter-Einhängvorsprung höhenlage-variable is suspended, so that the bound to the baseboard support bar, actual skirting rests with its underside on the surface of the floor covering. Concerning the implementation of the assembly of the base strip for the baseboard support bar and connected to it actual baseboard using the above-mentioned baseboard mounting supplement kit, so the method according to claim 11 gives more information. Based on the drawing of the new, three-component, baseboard mounting kit and the assembly process using the same is explained in more detail. 1 is a sectional view of a mounted on a shell wall base bar and the position in their profile-invariably positioned precisely hinged new screed height fixing gauge, Fig. 2 the same fixed base bar and the same - in itself position-variable - hinged baseboard support bar with the actual baseboard bound to it in the case of a mean "normal" height of the Screed, Fig. 3, the same constellation, but in the case of a comparatively low screed height, Fig. 4 also the same constellation, but for the case that the surface of the applied screed is a small piece above the normal height defined above and Fig. 5 in section the principle of the location of the base bar in the case of exposed concrete construction of a wall. Fig. 1 shows how two components of the new baseboard mounting kit or sets 100, namely the already attached to the shell wall 8 basic profile strip 2 and - in one of the two here upwardly open Einhängvorsprüngen 21 and 22 mitmit their downwardly open counter-projection 11 with relatively short form-fitting jaws 110 while quite solvable, but in terms of their position very clear and defined position-invariably "hinged", for the present invention essential new screed height-fixing theory 1 "play together". The two Einhängvorsprünge 21, 22 of the base bar 2 have approximately balcony-like shape with relatively high, upstanding balcony parapets 210, 220th The screed height-setting gauge 1 suspended in the base strip 2 has in its upper part a spacer projection 13 which is horizontally aligned with the base strip 2 and which is to be fitted snugly against the base strip 2, as well as the upper end surface 12, to which a kind of angle adjoins, which for a positive fit 120 with the approximately karniesenartig downwardly projecting extension 251 of the upper end projection 25 with anchoring elevation 252 of the base strip 2 provides. At its lower end, the screed height indicator foot 15 protrudes from the screed height-setting gauge 1 to the room, the upper surface 151 of which here indicates the height eh of the screed 7 which is as accurate as possible when applying the screed mass. If the screed compound has set, so the screed 7 has become sustainable, then the - for example, every 1 to 2 m spaced apart - in the bottom bar 2 precisely suspended Screed Heights Festlegungslehren 1 all removed. As a precaution, then for submitting a "floating" screed 7 previously applied to the shell wall 8 foam insulation board 81 in height eh of the screed 7 is separated, so that, see Fig. 2, there is a free space. In addition, it should be mentioned that the base strip 2 here also has a further projection 23, which, e.g. can be used to guide a cable. Fig. 1 clearly shows the inventive idea: The new screed height-fixing gauge 1 is positioned exactly defined in height and it is this Fig. 1 of the vertical main ledge to space horizontally projecting foot 15 can be seen. This foot 15 of the teaching 1 dives to its upper surface in the screed 7, which is already applied here, and are in this way the height of the screed 7 to be reached. The assembly process basically looks like this: To the rough wall 8 of a building, e.g. to an unpainted brick wall, the basic profile strip 2 is mounted or it is in the case of exposed concrete wall from the outset there already positioned. In place of a brick wall, there may also be stanchions or squadrons of a drywall, but it may also be an exposed concrete wall. The principle is always the same. Then the height gauge 1 is mounted by means of the hooking projections 21, 22 of the base strip 2. Now, so before the screed begins its work, the walls are plastered 8 or the drywall brings the last "level drywall, whereby the base bar 2 reaches its flush with the wall surface 8. This is the same even better connected to the wall 8 and If appropriate, it can absorb those higher forces which could act on the base strip 2 during or through the application of the screed over the screed height gauge Conventionally, the walls 8 are plastered before the screed 7 is introduced This teaching 1, so in particular at the foot 15, can orient. It remains the screed height-fixing gauge 1 so long bound to the base bar 2 until the screed 7 is applied to the top of her foot 15 reaching and it is this doctrine removed only when the screed 7 is at least reasonably stable and, so to speak dried, so has tied off. Then, with the installation of the flooring, e.g. a parquet floor are started. Any permanently remaining height gauges would cause structure-borne sound transmission from the screed to the wall. The new teaching 1 is not a profiled strip which extends in the manner of the base strip 2, but is considerably shorter, e.g. for example, only as long as, for example, a sign ruler or the like is wide. In the current version, this is e.g. about 6 inches wide. In principle, the new teaching could also be a continuous profile strip. Preferably, and in particular for reasons of material savings, it is "narrow" and therefore easier to assemble and in particular to disassemble again. Normally, in a space to be provided with screed 7, along its e.g. four already fixed baseboards used several such narrow gauges. Depending on the geometry of the room and the space required for the scraper removal tools, e.g. minimally one lesson per room side and / or corner are used, but usually every 1 to 2 m. So if the screed 7 would be introduced with absolutely +/- 1cm, which is usually quite true in the construction industry and usually sufficient for a normal construction process, this would not be a problem in a usual baseboard installation, in the case of a flush skirting this would be rather devastating , With the new gauge 15, the tolerances can be brought into the 1 mm range. These never entirely avoidable low altitude inequalities of the screed floor 7 can then be compensated later by the present invention possible height-variable hooking the baseboard support bar 3. This is one of the main advantages of the new, three-component Kit 100. For the floor, which finally attaches the final cover - so baseboard support bar, but which is faced with the required tolerances in the 1 / 10mm range - would be a gap between skirting board and finished floor of ± 0.5 mm in the raised object area unacceptable. However, this fine adjustment can now take place in the area between the screed heights eh1 and eh2, see FIGS. 3 and 4. Fig. 2 shows - with otherwise constant reference numerals - as in the Einhängvorsprünge 21 and 22 of the base bar 2 - after the removal of screed height-fixing gauge 1 - with their downwardly open Einhängvorsprüngen 31, 32 with Endverdickungen 311, 321 of their "parapets" the baseboard support bar 3 is mounted with the bound to them actual skirting 35, which in turn with its lower narrow surface 351 directly on the surface 61 of here on the screed 7 with "normal height "applied flooring 6 is present. The base strip 2 is here, as well as in Figs. 3 and 4, within a longitudinal recess 80, which is defined in width by the upper end projection 25 and the same rich subsequent plaster 82 with fine plaster 85. From Fig. 2 it can be clearly seen how the fine plaster 85 is pulled over the karniesen-like projection 251 of the base strip 2 and how the actual baseboard 35 with the fine plaster 85 is flush. In Fig. 2 is still shown how a cable 5 is stored on the projection 23 of the base bar 2 and as in the head slot behind the extension 251 a, preferably band-like, for example, equipped with LEDs, light source 51 is installed. Fig. 2 shows how - according to Fig. 1 above the height of the screed 7 upstanding wall-insulating board 81 in screed height is "cut off", and the flooring 6 extends into the resulting wall recess into it. A possible Dämmstreifen usually allows the thermal freedom of movement of the screed against the rigid wall to "floating screed" and on the other hand, he ensures a footfall sound decoupling. For its part, a wooden floor requires freedom of movement (summer / winter humidity adjustment) so that even in its smallest extent no horizontal gap becomes visible, in particular a wooden floor must, as it were, project into the wall at the time of installation. In addition, it should be noted that, of course, there are different screed height fixing gauges 1 for different finished covering thicknesses, so that the same fine adjustment area of the baseboard supporting strip 3 is ensured in each case with the actual baseboard 35 bound to it flatly. Figs. 3 and 4 illustrate - with otherwise constant reference numerals - the high adaptability of the system of baseboard 2, the height positioning remains constant, and in the same at different heights to be suspended baseboard support bar 3, which the sequence of in relation to "Normal "-Estrichhöhe he, too low screed height h1, Fig. 3 and once too large screed height he2, Fig. 4 is. It should be mentioned here in passing that using the new kit 100 with the screed height-fixing gauges 1 may also different, not exactly, mounting heights of the base 2 can be compensated. Fig. 5 explains - the present invention in addition - with otherwise the same reference numerals meaning - the "assembly" of an only by an extension V-free with the explained to Figs. 1 to 4 base 2 perfectly -complemented-baseboard 2 ' on a wall made of exposed concrete of a building. On the inside of a formwork 88 for a fair-faced concrete wall 8 in the respectively provided height (in relation to the raw floor surface) the screed height-fixing gauge 1 to the omitted foot 15 completely identical baseboard mounting aid 1 'attached and to this is by positive engagement entanglement the baseboard projections 21 and 22 with the auxiliary gauges projection 11 created an ensemble E - which is practically the position position invariable state of the strips 2 and 1 of FIG. 1. The formwork 88 is ultimately offset in the formwork construct that the ensemble of base bar 2 'and auxiliary gauge 1' just described is thus arranged on the inside of the formwork on the side of the concrete 89. After completion of the shuttering, the filling of the same is done with flowable exposed concrete to form a fair-faced concrete wall 8, in which said ensemble E is finally poured position after setting of the concrete 89. Then, the removal of the formwork 88 takes place together with the auxiliary gauge 1 'and it is in the longitudinal niche 80 of the wall 8 fixed base 2' for the further steps of baseboard assembly, as described in detail above available.
权利要求:
Claims (11) [1] claims: 1. kit (100) for mounting one with the surface (85) of the wall (8), such as solid bulkhead, first layer of drywall or the like, a room of a building flush or flush and bottom of the floor covering (6) the same fitting arranged skirting or skirting board (35), comprising - in a bottom and bottom parallel in the wall (8) or in their plaster or drywall (82) sunk arranged longitudinal recess (80) to be installed and there to be fastened base strip (2 ) with a profile cross-section with at least one projecting from her, upwardly open Einhängvorsprung (21; 22) and a projecting from her upper end strip (25), and - a baseboard support bar (3) with a profile cross-section with at least one downwardly open counter-Einhängvorsprung (31; 32), which in the at least one Einhängvorsprung (21; 22) of the base strip (2) can be suspended, characterized in that the kit (100) for a Precise definition of the height (he) of the od, possibly with insulation boards od. Like. Occupied, bottom of a shell to be applied screed (7) - one with its at least one - in the at least one upwardly open Einhängvorsprung (21; 22) of the profile of the base strip (2) position-invariable and stable position, preferably under positive engagement (12), attachable, downwardly open - Gegen-Einhängvorsprung (11) einzuhängende, with its upper end surface of the upper end projection (25) of the base bar (2), preferably under positive engagement (12) od. Like., At least fully settable, and equipped with a screed on the bottom of her Estrichhöhenanzeige foot (15), after the application and setting of the screed mass (7) to be removed screed height-fixing theory ( 1), and - finally with its at least one counter-Einhängvorsprung (31; 32) in the at least one Einhängvorsprung (21; 22) of the profile of the base strip (2) mounting height-flexibly, suspended and either itself or with the bound to it having actual baseboard (35) on the underside of the laid on the screed (7) flooring (6) fitting auflagbare base support bar (3). [2] 2. Kit according to claim 1, characterized in that the individual, preferably made of a dimensionally stable, optionally transparent plastic formed screed height-fixing gauge (1) in addition to the at least one downwardly open counter-Einhängvorsprung (11) in the same direction projecting spacer projection (13) which, when positioning the said gage (1), is to be supported on and resting against the base strip (2). [3] 3. Kit according to claim 1 or 2, characterized in that the individual Estrichhöhen-Festlegeungslehre at its upper end an angling (120) which with one of the upper end projection (25) of the profile of the base bar (2) like a karniesenartig downwardly projecting End projection extension (251) is positively cooperable. [4] 4. Kit according to one of claims 1 to 3, characterized in that the counter-Einhängvorsprung (11) the screed height-fixing gauge with two - the respective parapet (210) at least one upwardly open Einhängvorsprungs (21) of the profile of the base strip ( 2) on both sides form-fitting circumferentially - short jaws (110) is formed, or that the counter-Einhängvorsprung (11) extended to the base bar (2) and can be applied to the same and only one, namely the baseboard (2) closer, the originally two short jaws (110) available and in the parapet (210) of the Einhängvorsprungs (21) can be suspended. [5] 5. Kit according to one of claims 1 to 4, characterized in that the profile of the base strip (2) od at least one of the upper end projection (25) away upwardly projecting anchoring elevation (252) for connection to the plaster (82) od. Like. The wall (8). [6] 6. Kit according to one of claims 1 to 5, characterized in that the profile of the base strip (2) in addition to the at least one upwardly open Einhängvorsprung (21; 22) at least one further projection (23) for the support of an energy or data cable (5). [7] 7. Kit according to one of claims 1 to 6, characterized in that below the upper end projection (25) of the profile of the base strip (2), an illumination band (51), preferably with LED lights, provided or mounted. [8] 8. Kit according to one of claims 1 to 7, characterized in that the at least one downwardly open counter-Einhängvorsprung (31; 32) of the profile of the baseboard carrier strip (3) at its end an edge thickening (311, 321) for a position-secured seat of the aforementioned strip (3) in its position. [9] 9. supplementary kit 100, characterized in that it comprises all - ie a total of three components included in the kit according to one of claims 1 to 8, wherein the base strip (2) as a base strip (2 ') only an extension (V) according to downwards and that it additionally or additionally with a - to the inside of a concrete formwork (88) bound or bindable baseboards (2 ') - auxiliary assembly (T) is equipped, which one with the embodiment of screed height-setting gauge (1) according to has the above embodiment claims 1 to 8 identical embodiment, with the only difference that it has no foot 15 projecting from her. [10] 10. A method for laying baseboards (35) using the kit (100) according to one of claims 1 to 9, characterized in that in successive steps 1) within a near-bottom longitudinal recess (80) in the plaster (82) od. Like. The wall (8) of a room of a building or before application of the plaster (82) od. The like. The base bar (2) on the wall (8) is attached, that after 2.) in at least one upwardly open Einhängvorsprung (21; 22) the screed height-fixing jig (1) - with simultaneous support with its Abstützvorsprung (13) on the base bar (2) and under positive engagement (12) with the upper end projection (25) of the base bar (2) - with their at least a downwardly open counter-Einhängvorsprung (11) position-invariable or fixed in position is hooked that 3.) according to the position of their Estrichhöhenanzeige foot (15) the screed mass (7) to the height (he) of the upper surface (151 ) of this foot (15 ) is applied to the floor of the building shell that 4.) after the setting of the screed covering (7) the screed height-fixing gauge (1) is removed, that after 5.) the floor covering (6) on the screed covering (7) applied or Finally, 6.) in the at least one upwardly open Einhängvorsprung (21; 22) of the profile of the base strip (2) the skirting board carrier strip (3) with its at least one downwardly open counter-Einhängvorsprung (31; 32) height-variable is hung variable, so that the sockets to the skirting board (3) bound, actual baseboard (35) rests with its underside (351) on the surface (61) of the floor covering (6). [11] 11. Method of assembling the base strip (2 ') provided for mounting the skirting board according to one of claims 1 to 9 in a longitudinal recess (80) of a wall (8) made of exposed concrete (89), using the supplementary construction set according to claim 9 characterized in that a) on the inside of a formwork part (88) the base strips (2 ') - mounting auxiliary teaching (T) with protruding from said formwork part (88) projections (11) and (13) is fixed in the final intended height, that b) the base strip (2 ') with the auxiliary jig (T) by means of its hook-in projections (21) and (11) is hooked into an ensemble (E) that c) the scarf part (88) with the inside on it is installed in the shell structure of the building or room to be manufactured, that d) with the exposed concrete (89), the wall (8) is cast under the casting and inclusion of the ensemble (E) and that c) after Setting the Sichtb etons (89) of the formwork part (88) is removed with the mounting aid (T) attached to it, after which the method according to the items 2 to 6 of claim 9 is continued.
类似技术:
公开号 | 公开日 | 专利标题 DE202015106457U1|2015-12-09|Afford Mounting Kit DE3440545C2|1993-01-21| DE102015001891B4|2016-09-15|Edging for balcony and terrace floors EP0201768B1|1990-08-01|Installation unit for sanitary apparatuses AT517536B1|2017-09-15|Installation box with lighting for installation in a wall recess or recess EP0495238B1|1994-06-08|Building elements set for circular showers DE19822353A1|1999-03-04|Rain water gutter mounting DE102012105555B4|2017-06-22|Receiving unit for receiving a weighing unit and arrangement for determining a mass EP3293323A1|2018-03-14|Mounting system for floor pedestal or skirting board DE102009057016A1|2011-06-09|Skirting board for lower end of walls, has profile element for mounting on wall and another profile element serving as visible surface, where latter profile element is detachably connected with former profile element CH501805A|1971-01-15|Permanently fixed flexible seal for demou- - ntable joints EP2177689B1|2016-11-30|Frame with cover DE7602215U1|1976-05-20|INSTALLATION BOX DE102014013135A1|2016-03-10|Wall drainage channel for a shower DE10001517C1|2001-07-19|False wall for bathroom has metal profile carrier frame fitted with replacable pre-finished cladding panels DE202010004650U1|2011-11-30|Mounting fixture for a gutter DE102017103642B4|2018-10-25|An element AT410114B|2003-02-25|REVISION COVER FOR FLOORS, ESPECIALLY FOR HOMELAND FLOORS OR DOUBLE FLOORS EP3070215B1|2019-07-31|Wall covering module DE102018133224A1|2019-07-04|partition element EP0340810A2|1989-11-08|Section permitting the securing to walls DE102012106419A1|2014-01-23|MODULE FOR RECEIVING A SLIDING DOOR, FLOATING COMPONENT FOR A MODULE FOR RECEIVING A SLIDING DOOR AND METHOD FOR MOUNTING A MODULE FOR A SLIDING DOOR EP0154913A2|1985-09-18|Section permitting the securing to walls DE10249124A1|2003-10-30|Under floor installation box especially for electro engineering installations consisting of baseplate and installation frame which is held by leveling screws at baseplate and additional DE4039424C1|1992-02-06|
同族专利:
公开号 | 公开日 AT516533B1|2019-07-15| DE202015106457U1|2015-12-09|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题 DE202007003942U1|2006-03-31|2007-06-06|Profili Italia S.P.A., Torri Di Quartesolo|Baseboard for wall, has projecting wing covered by wall covering, where thickness of baseboard is same as thickness of covering such that upper surface of baseboard with wall upper surface lies on line| EP2445069A1|2010-10-21|2012-04-25|Karl Pedross AG|Corner profile system|CZ308779B6|2020-03-24|2021-05-12|Vojtěch B. Arch. Vogltanz|Hidden plinth| AT523074B1|2020-01-02|2021-05-15|Franz Neuhofer|Wall closure on the bottom|FR1587607A|1968-06-12|1970-03-27|CN108301528B|2017-10-13|2021-01-19|杭州建格科技有限公司|Wall system and decoration method| DE102018119768A1|2018-08-14|2020-02-20|Barthel Gmbh|Skirting board holder and skirting board system|
法律状态:
优先权:
[返回顶部]
申请号 | 申请日 | 专利标题 ATA50863/2014A|AT516533B1|2014-11-28|2014-11-28|Afford Mounting Kit|ATA50863/2014A| AT516533B1|2014-11-28|2014-11-28|Afford Mounting Kit| DE202015106457.8U| DE202015106457U1|2014-11-28|2015-11-27|Afford Mounting Kit| 相关专利
Sulfonates, polymers, resist compositions and patterning process
Washing machine
Washing machine
Device for fixture finishing and tension adjusting of membrane
Structure for Equipping Band in a Plane Cathode Ray Tube
Process for preparation of 7 alpha-carboxyl 9, 11-epoxy steroids and intermediates useful therein an
国家/地区
|