专利摘要:
The invention relates to a method for starting up a finishing train (7) in a casting-rolling compound (1) and a casting-rolling compound (1) for carrying out the method. The object of the invention is to be able to put the finish rolling train (7) of the cast-rolled composite installation (1) into operation as quickly as possible and without lengthy rolling simulations. This object is achieved by a method according to claim 1, characterized by - cutting off the pre-strip (4) into a pre-strip section by a first pair of shears (6) before the head of the pre-strip (4) enters the finishing train (7); the finish rolling of the pre-strip portion in the finishing train (7) to a finished strip portion; and - the coiling of the finished strip section in a coiler (10).
公开号:AT511657A1
申请号:T9262011
申请日:2011-06-24
公开日:2013-01-15
发明作者:Gerald Hohenbichler
申请人:Siemens Vai Metals Tech Gmbh;
IPC主号:
专利说明:

June 24th, 2011 7:31
Siemens CIC P
No. 4179 p. 4 * · 201112990 1
description
Commissioning of a finishing train in a cast-rolling compound 5.
The present invention relates to a method for starting up a finishing train in a cast-rolling composite plant and a cast-rolling composite plant for carrying out the method, 10
Field of engineering
On the one hand, the invention relates to a method for starting up a finishing train in a casting-rolling compound, comprising the following process steps: continuous casting of liquid metal, preferably steel, into a cast product in a casting plant, and rough rolling of the cast product into a pre-strip in a roughing train , 20 ......................................... ........ ..........
On the other hand, the invention relates to a cast-rolling composite plant for carrying out the method, comprising - a casting plant for casting molten steel into a cast product, preferably a thin slab; 25 - a pre-rolling line for pre-rolling the cast product into a pre-strip, the pre-rolling line being downstream of the casting plant; a first pair of scissors for trimming the pre-strip to a Var strip portion, the first pair being downstream of the pre-rolling line; the finish rolling line for finish rolling the pre-strip section into a finished strip section, the finishing train being downstream of the first pair of shears; and - a reeling device for reeling the finishing line section, the reeling device being downstream of the finishing train.
State of the art 24/06/2011 07:33
No .: R442 P.004 / 019 24. Junι 2011 2:31 Siemens CIC P 201112990 ir. 4179 p. 5 i * · · »4 · I · * * * *» · • * * «1 • * ·» • 14t «
When commissioning a cast-rolled composite plant, which is a plant (for example, a CSP, ISP or ESP plant) in which at least one casting unit with at least one rolling unit connected (more precisely coupled), is first the casting plant, then a roughing mill with typically several rolling stands and only then put the finishing train in operation. When commissioning the Pertigwalzstraße a 10 liquid metal (typically a molten steel) in the casting plant (typically a continuous casting or a two-roll caster) is continuously cast according to the prior art to a solidified cast product (eg. With slab or Dilnnbrammen cross section) before the cast product uncut 15 and with the casting heat of the continuous casting process in the
Roughing mill (e.g., a multi-stand "High Reduction Mill") is formed into a pre-strip. Subsequently, the pre-stiffening continuously emerging from the rough rolling mill is fed uncut to the per-rolling line and there converted to -20-egg-finished strip, wherein the roughing mill is coupled to the finishing train via the rolling stock. This coupling of two rolling mills - the so-called rolling composite - requires highly precise and lengthy advance planning with many 25 rolling simulations (so-called "ghost rolling sessions", which does not take place when commissioning the cast-rolled composite plant)
Walzgut be carried out), so that commissioning takes a long time and thereby incur high costs.
Summary of the invention 30
The object of the invention is to overcome the disadvantages of the prior art and to provide a method for commissioning a finishing train in a cast-rolling compound plant and a cast-rolling composite plant for performing the method by which the
The finishing train of the cast-rolling composite plant can be put into operation as quickly as possible and without lengthy rolling simulations. 24/06/2011 07:33
No .: R442 P.005 / 019
No, 4179 p. 6
June 24, 2011 7:31 Siemens C1C P 201112990
This object is achieved by a method according to claim 1, characterized by - cutting the pre-strip into a pre-strip section by a first pair of shears before the head of the pre-strip enters the finish-rolling line; the finish rolling of the pre-strip portion in the finishing train to a finished strip portion; and - coiling the finished strip section in a coiler.
Cutting the trimmed pre-strip into a pre-strip portion, wherein the cut-off portion of the pre-strip is referred to as a pre-strip portion, through 15 the first pair of scissors before the head of the pre-strip into the pre-strip portion
Finish rolling mill (i.e., in the first intermeshing mill stand of the finish rolling mill), results in decoupling of the roughing mill from the finish rolling mill. Here, the first pair of scissors in the transport direction of the pre-strip 20 between the "Vorwalzstraße uncUex_.Fjeirt.igwalzstraße". arranged. As a result, the finishing train can also be put into operation quickly and easily by commissioning personnel who have little or no specific knowledge in the field of cast-rolled composite systems. By the finish rolling of the
Vorstreifenabschnitts a Fertigstreifenabschnitt is produced, which is typically reeled after cooling in a coiler to a reel. By coiling, on the one hand, the overall length of the cast-roll composite can be kept compact (i.e., much more compact than a horizontal run-out area for the finished strip or finish strip section) and, on the other hand, the reel thus produced can already be sold. For the decoupling of the roughing from the finishing train, it is advantageous if the Vorstreifenabschnitt is accelerated on a roller table in the direction of the finishing train. 24/06/2011 07:34
No .: R442 P.006 / 019 35 24. June 2011 7:32
S i emens CIO P
No, 4179 p. 7 * # 201112990:: «· 4
Preferably, the foot of the Vorstreiferiabschnitts already has a distance of at least 1 to 5 m to the head of the uncut pre-strip when entering the finishing train. For the stability of the finish rolling process, the strip running and the winding process, it is advantageous if the length of the finished strip section is greater, preferably at least 1.1 times greater than the length of the strip path between the finishing train and the coiler. By the length of the tape path is meant the unwound length which is the finished strip or strip portion, i. the finished rolled Vorstreifenabschnitt - travels between the finishing train and the reel. As a result, the head of the finished strip section runs into the reeling device before the foot of the pre-strip section is rolled in the finishing train. This allows the strip tension required for stability to be easily maintained. 2.0 ..... _ ............... , , For the coiling of the finished strip section, it is advantageous if the finished strip section is cooled in a cooling device to winding temperature. In order to ensure a desired structure in the reeled finished strip section, it is advantageous if the pre-strip section is heated to rolling temperature in an oven before the finish rolling, preferably it is heated inductively. By inductive heating, the heating of the pre-strip section can be adapted quickly to different transport speeds.
In order to prevent scale defects in the finished strip section, it is advantageous for the pre-strip section to be heated in one after heating
Descaling device is descaled. Alternatively, it would also be possible, the Vorstreifenabschnitt before 24/06/2011 07:34
No .: R442 P.007 / 019 24. June 2011 7:32 201112990
Siemens CIC P
No. 4179 p. 8
5
Desalt heating and perform the heating in an inert inert gas atmosphere. For the use of commercially available reeling devices, it is advantageous if the width-specific weight is
Vorstreifenabschnitts greater than 3.5 t / m, preferably greater than 4.5 t / m. With a pre-stripe width of 1.4 m, this results in a weight of 5 t, preferably approximately 6.5 t, for the pre-strip section and for the reel, 10
The object of the invention is also achieved by a cast-rolling composite system according to claim 8, wherein the first pair of scissors 2 for cutting a pre-strip having a thickness of 18 mm, preferably 20 mm, formed at a transport speed of 15 Vorstreifens of 0.5 m / s is.
In order to keep the total number of shears in the cast-rolling composite as low as possible, it is favorable if the first shears also 2um cutting a 2.0 cast product with a thickness of 90 mm, preferably 110 mm, at a transport speed of 0.1 m / s is formed. This makes it possible to dispense with a so-called emergency shear before the finishing train. It is advantageous if the first pair of scissors, preferably a pendulum scissors, is arranged immediately after the roughing line.
It is advantageous if the first pair of scissors is followed by an oven, preferably an induction oven.
It is advantageous if a second pair of scissors, preferably a drum pair, is arranged between the first pair of scissors and the oven. Thereby, the continuous casting operation can be maintained even in the case of a disturbance in the area of the furnace, the finishing train, the cooling device or the reeling device. 24/06/2011 07:34
No .: 8442 P.008 / 019 24. Jum 2011 7:32
Siemens CIC P
No. 4179 p. 9 201112990 ·································································································································································································································· It is advantageous if the finishing train is preceded by a descaling device immediately.
In addition, it is favorable that a cooling device for cooling the finished strip section downstream of the finishing train 10 is located downstream.
Brief description of the drawings
Further advantages and features of the present invention will become apparent from the following description of non-limiting embodiments, reference being made to the following figures, which show:
1 shows a schematic representation of a casting-rolling-20 composite plant for carrying out the method according to the invention.
FIG. 2 shows a simplified casting / rolling composite installation compared to FIG. 1 for carrying out the method according to the invention.
Description of the embodiments
1 shows a schematic representation of a casting-30 rolling composite system 1 which is designed as a so-called ESP system {Endless Strip Production) for the production of strip steel. In continuous continuous operation 2 liquid steel is cast into thin slabs on a continuous casting machine, wherein the thickness of the cast strand immediately after 35 of the mold is 90 mm. In the strand support device following the mold, the partially solidified casting strand is reduced to a thickness of 70 mm by a so-called liquid core reduction. Following the Caster 2, the 24/06/2011 goes through 07:35
No.; R442 P.009 / 019 24, June 2011 7:33
Siemens CIC P
No. 4179 S, 10 201112990 7 solidified cast product in Transporttriehtung 5 a dreigerüstige Vorwalzstraße 3, where a reduction of the cast strand to a so-called pre-strip 4 and a pre-strip with a thickness of 19 mm. After pre-rolling 5, the pre-strip 4 passes through uncut a first pair of scissors 6, which is designed as pendulum scissors, an input and output device 15 and a second pair of scissors 13, which is designed as a drum shears. Thereafter, the pre-strip 4 is heated in an induction furnace 12 to rolling temperature 10, so that the heated pre-strip 4 after descaling in the descaling device 14 in the austenitic microstructure in the stands 7a ... 7d the finishing train 7 to a finished strip 8 and a finished strip is rolled. After the finish rolling, the finished strip 8 having a thickness of 4 mm is cooled in a cooling device 9 to the winding temperature and then wound up into a reel in one of the reeling devices 10a, 10b. A quick pair of scissors, which is arranged between the cooling device 9 and the reeling devices 10a... 10b 20, for cutting the finished strip 8 to the desired bundle weight, has not been shown for reasons of clarity.
The commissioning of the cast-rolling composite plant 1 is also difficult due to the lack of experience of the commissioning personnel, especially since commissioning of the plant in coupled operation, i. when coupling the roughing mill 3 with the finishing train 7 via a pre-strip 4, represents a major challenge to the 30 automation.
During commissioning, the procedure according to the invention is as follows: After commissioning the continuous casting machine 2, it is suitable for casting thin slabs. By 35 subsequent commissioning of the roughing mill 3, this is made suitable for rough rolling a thin slab to a pre-strip 4; It is advantageous if the roughing mill 3 at least partially with a thin slab from 24/06/2011 07:35
No .: R442 P.010 / 019 24. June 2011 7:33
S iemens CIC P • ♦
No. 4179 p. 11 201112990 8 of the continuous casting machine 2. By commissioning the first pair of scissors 6, this 2um is made suitable for cutting off a pre-strip 4. Although, as stated above, in continuous continuous operation, the cast 5, the pre-strip 4 and the finished strip 8 pass through the cast-rolled composite unit 1 uncut (except for cutting the finished strip 8 to the desired reel weight), the first scissors 6 are put into operation certain that on the one hand the discontinuous (eg the so-called batch operation) is made possible and can respond appropriately to incidents in the casting-rolling compound 1. When commissioning the finishing line 7, the uncut, continuously produced pre-strip 4, i. the pre-rolled in the pre-rolling 3 molded product 15 cut off by means of the first scissors 6 to a Vorstreifenabschnitt before the head of Vorvorreifens 4 enters the first frame 7a of Fertigwal2Straße 7. Subsequently, the Vorstreifenabschnitt on the roller table 11, the all parts of the plant between the -20-continuous casting machine 2 and the Haspeleinri.chtungen. 10a, 10b interconnects, accelerated by non-illustrated drive rollers in the direction of the finishing train 7, so that the foot of the Vorstreifenabschnitts after acceleration has a distance of 1 to 5 m to 25 uncut pre-strip 4. The pre-strip portion is then rolled in the finishing train 7 by a plurality of rolling passes (for example, three rolling passes in the four-stand finishing train 7) to a finishing strip section. By cooling the 30 Fertigstreifenabschnitts in the cooling device 9 of the
Finished strip section cooled to winding temperature before the finished strip portion is wound in one of the reels 10a, 10b to a so-called micro-coil ("micro-coil"). Conveniently, the pre-strip section has at least a weight of 5 t, so that the finished strip section can be wound up on commercially available reeling devices 10a, 10b. According to the Vorstreifenabschnitt in the 24/06/2011 07:35
No.: R442 P.011 / 019 24. June 2011 7:33 201112990
Siemens C1C P • ♦
No, 4179 S, 12
Finishing mill 7 such reduced to a finished strip section that the length of the rolled
Finished strip section > is the tape path of the finished strip or, the finished strip section between the finishing train 7 and 5 of the reel device 10a, 10b. This ensures that a sufficient strip tension can be applied, so that a good guidance of the
Fertigstrei'fenabschnitts in the following parts of the system given and the quality of the reel is increased. In the first 10 passes through the commissioning of the finishing train 7, it may be convenient to use the preheating section only with the casting heat, i. without additional heating in the induction furnace 12 and thus typically in the ferritic microstructure, to roll through a maximum of 15 three reduction steps in the finishing train 7. In the subsequent rolling passes in the course of commissioning, the induction furnace 12 can be used for heating the pre-strip section to rolling temperature, so that the finish rolling in the austenitic structure region 20 can take place. The first scissor 6 is advantageously designed as a pendulum scissors, the pendulum scissors both for cutting a cast product with a thickness of 90 mm and for cutting a pre-strip having a thickness of 18 mm at a transport speed of the pre-strip of 25 0.5 m / s is formed.
FIG. 2 shows a representation which is simplified relative to FIG. 1 and which is likewise suitable for carrying out the method according to the invention. 30
Concretely, the method according to the invention has the following advantages over the prior art: reduction of complexity in the commissioning of the finishing train, whereby a smaller number of Fehlwalzungen 35 (English, cobbles) is achieved, - reduction of commissioning time and costs, and - already during commissioning, a sale of the reels produced is possible. 24/06/2011 07:36
No .: R442 P.012 / 019 24. June 2011 7:34
Siemens CIO P
No. 4179 p. 13 1 201112990 10
LIST OF REFERENCES 1 2 3 4 5 6 7,7a .., 7d 8 9 10,10a ... 10b 11 12 13 14 15
Casting and rolling plant
casting plant
roughing
Preliminary strip or prerelease section Transport direction first scissors finishing mill
Finished strip or finishing strip section Cooling device
coiler
roller table
Oven second pair of scissors
descaling
Entrance and removal device 24/06/2011 07:36
No .: R442 P.013 / 019
权利要求:
Claims (14)
[1]
24. June 2011 1:34 Siemens CIC P e, 4179 p. 14 201112990 11 Claims 1, A method for starting up a finishing train (7) in a cast-rolled composite plant (1), comprising the following 5 process steps: - continuous casting of liquid metal, preferably steel, to a cast product in a casting plant (2); - pre-rolling the cast product to a pre-strip (4) in a roughing mill (3); 10 characterized by, - cutting off the pre-strip (4) into a pre-strip section by an first pair of scissors (6) before the head of the pre-strip (4) enters a finishing train (7); 15 - the finish rolling of the pre-strip portion in the finishing train (7) to a finished strip portion; and - the coiling of the finished strip section in a coiler (10).
[2]
2. The method according to claim 1, characterized des9 desvorstreifenabschnitt on a roller table (11) in the direction of the finishing train (7) is accelerated.
[3]
3. The method according to claim 1, characterized in that the length of the finished strip section is greater than the length of the strip path between the finishing train (7) and the reeling device (10).
[4]
4. The method according to claim 1, characterized in that the finished strip section is cooled in a cooling device (9) to the winding temperature.
[5]
5. The method according to claim 1, characterized in that the Vorstreifenabschnitt heated before the finish rolling in an oven 35 (12) to rolling temperature, preferably heated inductively, is. 24/06/2011 07:36 No .: R442 P.014 / 019
24 June 201 1 7:34 Si emens CIC p 201112990 ir. 4179 p. 15 • e t »* t · ··« · e * * e «« a * e · «m ** * * 12
[6]
6. The method according to claim 5, characterized in that the Vorstreifenabschnitt is descaled after heating in a descaling device (12).
[7]
7. The method according to claim 1, characterized in that the width-specific weight of pre-strip section is greater than 3.5 t / m, preferably greater than 4.5 t / m.
[8]
8. cast-rolling composite plant for carrying out the method 10 according to any one of claims 1 to 7, comprising - a casting plant {2) for pouring liquid steel into a cast product, preferably a thin slab; - A roughing mill (3) for pre-rolling the cast product to a pre-strip (4), wherein the roughing train (3) of the casting plant (2) is downstream; - a first pair of scissors {6) for cutting the pre-strip (4) to a pre-strip portion, the first pair of shears (6) being downstream of the pre-rolling line (3); a finish rolling line (7) for finish rolling the pre-strip section to a finished strip section, the finishing train ( ) being downstream of the first shears (6); and - a reeling device (10) for coiling the finished strip section, the reeling device (10) being located downstream of the finishing train (7); characterized in that the first scissors (6) for cutting a pre-strip (4) having a thickness of 18 mm, preferably 20 mm, at a transport speed of 0.5 m / s is formed. 30
[9]
9. The device according to claim 8, characterized in that the first scissors (6) is also designed for cutting a cast product having a thickness of 90 mm, preferably 110 mm, at a transport speed of 0.1 m / s 35 is formed. 24/06/2011 07:37 No .: R442 P.015 / 019
January 24, 2011 7:35 AM Siemens CIC P No. 4179 p. 16 • »* * M« 4 # * • * 4 »4 4 4 · · · • 44 4 * 14 44 *« 201H2990::; ;; ; ·:. ; ; 44 44 * 4 4 «4 444 13
[10]
10. The device according to claim 8, characterized in that the first scissors (6), preferably a pendulum scissors, immediately after the rough rolling mill (3) is arranged.
[11]
11. The device according to claim 8, characterized in that the first scissors (6) is a furnace (12), preferably an induction furnace downstream,
[12]
12. The device according to claim 11, characterized in that between the first scissors (6) and the furnace (12), a second scissors (13), preferably a drum shears, is arranged.
[13]
13. The apparatus according to claim 8, characterized in that 15 of the finishing train (7) is a descaling device (14) immediately upstream.
[14]
14. The device according to claim 8, characterized in that a cooling device (9) for cooling the finished section 20 of the finishing train (7). is downstream. 24/06/2011 07:37 No .: R442 P.016 / 019
类似技术:
公开号 | 公开日 | 专利标题
EP0889762B1|1999-10-27|Method for producing hot-rolled steel strip
EP1951451B1|2010-03-24|Method for producing a hot-rolled steel strip and combined casting and rolling installation for carrying out the method
DE3241745C2|1985-08-08|Process for the production of hot-rolled steel strip from continuously cast raw material in directly successive work steps
EP0415987B2|1999-11-24|Process for continuous production of steel strip or steel sheet from flat products made by the circular-arc type continuous casting process
DE202011110779U1|2016-05-10|Plant for the production of flat rolled products
EP0666122A1|1995-08-09|Method and installation for manufacturing hot-rolled steel strip from a continuously cast material
EP0761326A1|1997-03-12|Installation for producing hot rolled thin strip
AT511657B1|2013-04-15|COMMISSIONING OF A FINISHED ROLLING CABLE IN A GIESS-WALZ-VERBUNDANLAGE
EP2209573B1|2013-08-14|Method for continuous austenitic rolling of a preliminary strip, which is produced in a continuous casting process
EP0734793A1|1996-10-02|Method and apparatus for the production of hot-rolled steel strip
AT519277A1|2018-05-15|Casting and rolling plant
EP0823294A1|1998-02-11|Method and installation for manufacturing strips of low-carbon and ultra-low-carbon steel
AT511674B1|2013-04-15|COMMISSIONING OF A FINISHED ROLLING CABLE IN A GIESS-WALZ-VERBUNDANLAGE
EP3338914A1|2018-06-27|Method for the endless manufacture of a coiled hot rolled sheet in a combined casting and rolling installation, method for starting up a combined casting and rolling installation, and a combined casting and rolling installation
EP3027331B1|2017-03-01|Casting and rolling plant and method for producing slabs
EP2376240B1|2014-02-12|Method for producing strips of metal, and production line for performing the method
DE10008693A1|2001-09-06|Concrete reinforcing steel method/machine for concrete steel rolling mill produces round strips containing smooth/ribbed connected bars, straightened, slit, and cut-to-length
DE102019207459A1|2019-11-28|Casting mill for batch and continuous operation
WO1999058263A1|1999-11-18|System and method for producing steel strip
DE10025080A1|2001-05-17|Method of making metal tape
DE102008061206A1|2009-07-16|Method for continuous or discontinuous production of hot-rolled strips made of steel, comprises subjecting a cast strip as a pre-strip to a first thermal treatment process, and subsequently winding and stacking as a hot strip
同族专利:
公开号 | 公开日
AT511657B1|2013-04-15|
CN102836876B|2016-07-06|
RU2518821C2|2014-06-10|
RU2012124897A|2013-12-20|
CN102836876A|2012-12-26|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题
EP0611610A1|1993-02-16|1994-08-24|Voest-Alpine Industrieanlagenbau Gmbh|Process for the production of a strip, a pre-strip or a slab|
EP0804300B1|1994-10-20|1999-05-06|MANNESMANN Aktiengesellschaft|Process and device for producing a steel strip with the properties of a cold-rolled product|
US6832432B2|1996-11-28|2004-12-21|Sms Schloemann-Siemag Aktiengesellschaft|Hot-rolling mill|
WO1998026882A1|1996-12-19|1998-06-25|Hoogovens Staal B.V.|Process and device for producing a steel strip or sheet|
WO2008113848A1|2007-03-21|2008-09-25|Danieli & C. Officine Meccaniche S.P.A.|A process and a plant for the production of metal strip|
DE102008020412A1|2007-08-24|2009-02-26|Sms Demag Ag|Method and device for producing a metal strip by casting rolls|
DE102008003222A1|2007-09-13|2009-03-19|Sms Demag Ag|Compact flexible CSP system for continuous, semi-continuous and batch operation|DE102013220657A1|2013-07-26|2015-01-29|Sms Siemag Ag|Method and device for producing a metallic strip in a continuous casting-rolling process|JP2000126803A|1998-10-27|2000-05-09|Ishikawajima Harima Heavy Ind Co Ltd|Hot rolling method and facility|
DE10109055A1|2001-02-24|2002-09-05|Sms Demag Ag|Continuous caster with downstream furnaces, roughing stands and a finishing train|
AT504782B1|2005-11-09|2008-08-15|Siemens Vai Metals Tech Gmbh|METHOD FOR PRODUCING A HOT-ROLLED STEEL STRIP AND COMBINED CASTING AND ROLLING MACHINE TO PERFORM THE METHOD|
AT506065B1|2007-11-22|2009-06-15|Siemens Vai Metals Tech Gmbh|METHOD FOR THE CONTINUOUS AUSTENITIC ROLLING OF A PRECONDUCT MADE IN A CONTINUOUS PLANTING PROCESS, AND A COMBINED CASTING AND ROLLING MACHINE TO PERFORM THE METHOD|
AT506603B8|2008-04-04|2010-03-15|Siemens Vai Metals Tech Gmbh|METHOD AND DEVICE FOR A CAST IRONING COMPOSITE|CN104624989A|2013-11-11|2015-05-20|谢兆宗|Continuous casting formation machining device and method used for metal|
RU2646514C2|2013-12-26|2018-03-05|Поско|Installation and method of continuous casting and rolling|
法律状态:
2016-06-15| PC| Change of the owner|Owner name: PRIMETALS TECHNOLOGIES AUSTRIA GMBH, AT Effective date: 20160415 |
2018-02-15| MM01| Lapse because of not paying annual fees|Effective date: 20170624 |
优先权:
申请号 | 申请日 | 专利标题
AT9262011A|AT511657B1|2011-06-24|2011-06-24|COMMISSIONING OF A FINISHED ROLLING CABLE IN A GIESS-WALZ-VERBUNDANLAGE|AT9262011A| AT511657B1|2011-06-24|2011-06-24|COMMISSIONING OF A FINISHED ROLLING CABLE IN A GIESS-WALZ-VERBUNDANLAGE|
RU2012124897/02A| RU2518821C2|2011-06-24|2012-06-14|Putting into operation of finishing mill stands at combined foundry-rolling plant|
CN201210206991.XA| CN102836876B|2011-06-24|2012-06-21|The operation of the finishing mill line in rolling casting bonding equipment|