专利摘要:
Shield propulsion apparatus (100) for producing a tunnel (5) in an open construction in an excavation (20), comprising: - a shield (101), the shield (101) a lower part (110) facing a bottom of the excavation (20), two side parts (111) facing the two side walls of the excavation (20) and a front part (112) facing a working face (22) of the excavation (20), - a propulsion device (102) with a drive for advancing the shield propulsion device (100), wherein the propulsion device (102) is supported by a supporting device (120) on a tunnel segment (50) installed in the excavation (20) on the end face (52) thereof, wherein a further supporting device (1) is provided which supports the shield propulsion device (100) on the installed tunnel segment (50) outside of its end face (52) is supported.
公开号:AT511199A4
申请号:T1354/2011
申请日:2011-09-20
公开日:2012-10-15
发明作者:
申请人:Ilf Beratende Ingenieure Zt Gmbh;
IPC主号:
专利说明:

1 · · · · · · · · · · 4 444 ♦ ** ϊ i 63960 23 / cr
The invention relates to a Schildvortriebsvorrichtung for producing a tunnel in open construction in an excavation, with - a shield, the shield has a bottom of the pit facing lower part, two side walls of the pit facing side panels and a working face of the excavation facing front part, - A propulsion device with a - in particular hydraulic - drive for propelling the shield tunneling device, wherein the propulsion device is supported with a AbstOtzvorrichtung on a built-in excavation Tunnetsegment on the end face.
Furthermore, the invention relates to a method for producing a tunnel in an open construction, wherein at a working face is gradually excavated and the soil material is discharged upwards, and in the corresponding excavation prefabricated tunnel segments are strung together, each tunnel segment is lowered from above wherein at tunnel level a Schildvortriebsvorrichtung is provided which is supported in each case against the last tunnel segment, wherein in one step, a feed of the Schildvortriebsvorrichtung over at least one tunnel segment length is effected by a supporting device between the Schildvortriebsvorrichtung and an end face of the tunnel segment.
Shield propulsion devices for producing an open tunnel in an excavation are already known from the prior art. For example, JP 2006-169909 A of 29 June 2006 shows such a shield propulsion device. With the help of bucket-type excavators, the soil material is excavated at the open working face of the excavation pit. Subsequently, the shield advancing device is displaced via a propulsion device, wherein the propulsion device of the propulsion device is supported on the already installed tunnel segments. After the advancement of the shield propulsion device, the supporting device of the propulsion device is retracted, which makes it possible for another tunnel segment to be lowered into the excavation and connected to an already installed tunnel segment. From this introduced tunnel segment then the support device of the propulsion device can then again support again and thus cause a further advance of Schifdvortrrebsvorrichtung.
Also, according to the state of the art, excavation pits are excavated for the production of open-type tunnel tubes, and their walls and the sole are temporarily secured depending on the geological and hydrogeological conditions. The soil within the excavation pit is dug up, water is disposed of, the tunnel tube is erected and then backfilled and showered. Parts of excavation fuses are removed - especially in the space directly below the edge of the terrain - depending on their interference.
Disadvantages of this construction method according to the prior art are: The expenses for the construction pit fuses The disturbance effect of the excavation fuses remaining in the soil based on the groundwater flow The disturbance effect of the excavation fuses remaining in the soil related to future underground structures Long construction period and thus Long-lasting adverse effects on the environment such as noise, dust, shocks, appearance - long-lasting presence of building risks
The object of the invention is to provide a comparison with the prior art improved shield tunneling apparatus for producing a tunnel in an open design in a pit.
This is solved by the features of claim 1.
Characterized in that a further supporting device is provided which the Schildvortriebsvorrichtung on the built tunnel segment outside of the
Supported end face, a support of the shield driving device at the last tunnel segment can also take place when the support device of the propulsion device is no longer supported on the last tunnel segment.
Because the further supporting device is supported outside the end face of the tunnel segment, a further tunnel segment can be arranged on an already installed tunnel segment, without the further supporting device having to be completely detached from the already installed tunnel segment.
Further advantageous embodiments of the invention are defined in the dependent claims.
It has proven to be particularly advantageous if the further supporting device has a preferably hydraulic drive device for supporting the shield driving device on the installed tunnel segment.
According to a preferred embodiment, provision can be made for supporting elements to be provided on which the further supporting device is supported on the installed tunnel segment, wherein the supporting elements can be detachably fastened to an inner side of the tunnel segment. Due to the design of the support elements on an inner side of the tunnel segment, these can be installed or fastened in a simple manner in the already existing tunnel and also removed again.
Furthermore, it can preferably be provided that the support elements on a tunnel segment bottom and / or tunnel segment side walls and / or on a tunnel segment ceiling on the inside of the tunnel segment are releasably fastened.
It has proved to be particularly advantageous if the drive device of the support device has at least two or more support cylinders, preferably hydraulically actuated, wherein the support cylinders correspond to the support elements in the installed tunnel segment.
4 · · · Φ Φ t «Μ · * ♦» M • · · · «« «* Φ Φ · > · · T · Φ · * Φ φ
Particularly preferably, it can be provided that the further support device has a sequence control, which retracts and extends at least two or more support cylinders in succession. By using such a sequence control, which successively moves in and out the support cylinders, another tunnel segment, which is lowered into the excavation, can be moved past the support cylinders without interrupting the support of the already installed tunnel segment.
It has proven to be particularly advantageous in this case if the shield of the shield tunneling device is embodied substantially completely watertight. The design of a substantially watertight trough the penetration of groundwater can be prevented in the Schildvortriebsvorrichtung.
According to a preferred embodiment, it can be provided that the shield driving device has a sealing device, wherein the sealing device seals the shield and the installed tunnel segment to the excavation substantially completely waterproof. By a sealing device between the shield and the installed tunnel segment can be prevented that water penetrates into the Schildvortriebsvorrichtung and also into the tunnel.
It has also proven to be advantageous if the shield propulsion device has a lifting device for lowering tunnel segments into the shield propulsion device. Due to the design of a lifting device, the lowering of the tunnel segment by the shield driving device can be done quickly.
It has proven to be advantageous if the shield driving device has a lifting device for lifting the soil material at the working face, wherein the lifting device is mounted on the front part of the shield. By forming an excavating device, which is mounted on the front part of the shield, the soil material can be excavated at the working face without the need for other machines such as excavators. • «• · · · · · · · · · · · · · · · · · · · · · · · · · · · ·
In concrete terms, protection is also sought for a method of producing an open-plan tunnel, which is gradually excavated at a working face and the material is carried upwards, and tunnel sections are assembled in line with the excavation, each tunnel segment being lowered from above wherein at tunnel level a Schildvortriebsvorrichtung is provided, which is supported in each case against the last tunnel segment, wherein in one step, a feed of the Schildvortriebsvorrichtung over at least one tunnel segment length by a supporting device between the Schildvortriebsvorrichtung and an end face of the tunnel segment is effected, wherein - in another Step the Schildvortriebsvorrichtung is supported by support cylinder another support device from the last tunnel segment outside the end face, and - in a further step - after completion of the support of the one Ab support device - the top support cylinders of the further support device are retracted when lowering a next tunnel segment to allow the passage of a tunnel segment bottom, and - in a further step, the top support cylinders are extended through the next tunnel segment back into its support position, and - in another Step the next lower support cylinders are retracted when lowering the tunnel segment to allow the passage of the tunnel segment floor, and - in a further step, the next lower support cylinder through the next tunnel segment through are extended back into its support position, and - if necessary, the repetition of the two preceding Steps until the next tunnel segment has almost completely lowered, and - be retracted in a further step, the lowermost support cylinders of the other support device to e passage of the tunnel segment bottom in a further step, a supporting device is attached to the newly lowered tunnel segment in order to first line this tunnel segment on the previously lowered tunnel segment and subsequently
Shield propulsion device for the next feed on at least one tunnel segment length to apply.
Further details and advantages of the invention will be more apparent from the
Figure description with reference to the, shown in the drawings
Embodiments explained in more detail below.
It shows:
Fig. 1 is a perspective view of a Schildvortriebsvorrichtung
Fig. 2a is a sectional front view of a shield tunneling device with a tunnel segment disposed thereon
2b shows a section through a side view of a Schildvortriebsvorrichtung with an excavating device and a supporting device
3a shows a representation as in Fig. 2b
Fig. 3b shows a representation as in Fig. 2b with excavated excavating device
Fig. 4 is a top view of a Schildvortriebsvorrichtung with a support device, a werteren support device and a lifting device
5a shows a section through a front view of a shield driving device with a tunnel segment partially lowered into the propulsion device
Fig. 5b is a section through a side view of a Schildvortriebsvorrichtung with partially lowered tunnel segment
Fig. 6a is a sectional view as in Fig. 5a with a further lowered tunnel segment
Fig. 6b is a representation as in Fig. 5b with a further lowered tunnel segment
Fig. 7a is a representation as in Fig. 6a with a further lowered tunnel segment
FIG. 7b shows a representation as in FIG. 6b with a further tunnel segment 7 7 •.
Fig. 8a Fig. 8b Fig. 9a Fig. 9b Fig. 10a Fig. 10b Fig. 11a Fig. 11b Fig. 11c is a representation as in Fig. 7a with an almost completely lowered tunnel segment a representation as in Fig. 7b with a nearly 8a with a fully lowered tunnel segment, a representation as in FIG. 8b with a completely lowered tunnel segment, a representation as in FIG. 9a with a tunnel segment completely lowered and arranged at the tunnel a representation as in FIG. 9b with a fully lowered and arranged on the tunnel tunnel segment a section through a side view of a Schildvortriebsvorrichtung with an alternative excavating and supporting a further section through a side view of a Schildvortriebsvorrichtung as in Fig. 11a is a front view of a Schildvortriebsvorrichtung with an alternative excavating device
FIG. 1 shows a perspective view of a shield tunneling device 100 and a tunnel 5 arranged thereon.
The Schildvortriebsvorrichtung 100 in this case has a shield 101, which in turn a lower part 110, two side parts 111 and a front part 112 aulweist. The front part 112 in turn has an outer side 113. On this outer side 113, the excavating device 2 is mounted. In this preferred embodiment, this excavating device 2 extends essentially over the full width and essentially over the full height of the front part 112 of the shield 101. This makes it possible for the excavating device 2, which serves as a conveyor 3, in this preferred embodiment, to be a screw conveyor 30 - is formed, not shown here soil material 21 (see Figure 2b) at the working face 22 of the excavation 20 to solve and promote.
«» · * * ··· · I 8 * · * · · · ··· ··· φφφ · · · · · · · · · φ · φ φ φ φ *
The shield 101 of the Schiidvortriebsvorrichtung 100 is formed in this preferred embodiment substantially completely waterproof, whereby the penetration of groundwater can be prevented. The tunnel 5, which is built by the Schiidvortriebsvorrichtung 100 consists of individual tunnel segments 50, which are lined up by the Schiidvortriebsvorrichtung 100 together. In this case, a tunnel segment 50 in each case has a tunnel segment ceiling 55 and, opposite to it, a tunnel segment floor 51. These are connected via the two tunnel segmental walls 54. Furthermore, the tunnel segment 50 has two end faces 52 and 52 '.
Between the ski propulsion apparatus 100 and the tunnel 5, a sealing device 6 is provided, which can prevent penetration of groundwater between the tunnel 5 and the Schiidvortriebsvorrichtung 100. Thus, in this preferred embodiment it can be achieved that the construction of a tunnel 5 with a slide propulsion device 100 can also take place in a construction pit which has a groundwater level 23 (not shown, see FIG. 2b) which is higher than the lower part 110 of the shield 101 of FIG Ski propulsion device 100 is located.
Figure 2a and Figure 2b show a Schiidvortriebsvorrichtung 100 in an excavation 20 and a tunnel 5 which is constructed by the Schiidvortriebsvorrichtung 100.
In the front part 112 of the shield 101 of the Schiidvortriebsvorrichtung 100 - taken exactly on the outside 113 - the excavating device 2 is mounted -which is formed in this preferred embodiment as a conveying device 3. In this embodiment, the conveying device 3 is designed as a screw conveyor 30. Likewise, it would of course also be conceivable that the conveyor device 3 would be designed as a chain conveyor or the like. It should be noted that under "lifting" the release and conveying the soil material 21 is to be understood. 9 9 Φ • • · · · · · · · · · · · • • • • • • · ·
The conveyor 3 triggers the soil material 21 at the working face 22 of the excavation 20 and conveys it upwards. The conveying device 3 is driven by the drive unit 4, which is formed above the conveying device 3 in this preferred embodiment.
In order to achieve propulsion, the shield tunneling device 100 has a propulsion device 102, with the propulsion device 102 with its supporting device 120 being supported on a tunnel segment 50 installed in the excavation pit 20 on its end face 52. The support device 120 has for this purpose a plurality of hydraulic cylinders which can be extended by the propulsion device 102 and thus move the shield 101 or the shield propulsion device 100.
The shield 101 of the shield tunneling apparatus 100 has a lower part 110, a front part 112, two side parts 111 and a rear side 114 with an opening for tunnel segments 50, which in this preferred embodiment are made watertight and are fastened to one another in a watertight manner. This is particularly advantageous if the groundwater level 23 is higher than the lower part 110 of the shield 101. Outside of the shield 101 is that of the conveyor device 3 and the drive unit 4 is formed.
Furthermore, in this preferred embodiment, the shield tunneling device 100 has a lifting device 7 for lowering tunnel elements 50 into the excavation 20 or into the shield tunneling device 100 and for lining and securing these tunnel segments 50 to the tunnel 5.
The support device 120 is braced with its hydraulic cylinders on the end face 52 of the tunnel segment 50.
As can be seen in FIG. 2 b, the shield driving apparatus 100 furthermore has a further supporting device 1, which is not active in this FIG. 2 b. The support device 1 has a in this preferred 10 ♦ · + + · $ · Φ »··· ··· ♦ · ♦ · * · ♦ * ♦ ♦ ♦ ♦ · · · · · · ·
Embodiment hydraulic drive device 8, to more in the figure description of Figure 5b. For the figure 3a and 3b is essentially the one mentioned for the figure 2b. In the figure 3b it can be seen how it is provided for maintenance and repair purposes that the excavating device 20 - which in this preferred embodiment as conveying device 3 is actually designed as a screw conveyor 30 - can be extended from the soil material 21 upwards. In this position, individual elements of the excavating device 2 can be exchanged or repaired, in order subsequently to sink the excavating device 2 back into the ground.
FIG. 4 shows a top view of a shield tunneling device 100 and a tunnel segment 50 arranged therein, on which the shield tunneling device 100 is supported via a support device 120 of the propulsion device 102.
On the outer side 113 of the front part 112 of the shield 101 of the shield driving device 100, the excavating device 2 is attached. The excavating device 2 is designed as a conveying device 3 in this embodiment. The conveying device 3 in this case has a plurality of conveying screws 30, which are preferably arranged substantially vertically.
The conveying device 3 is substantially completely formed over the entire width of the front part 112 of the shield 101 of the shield driving device 100, whereby it can be ensured that an excavation over the entire width of the shield driving device 100 can take place.
Furthermore, the shield driving device 100 has a further supporting device 1, which has a drive device 8, so that the shield driving device 100 can also be supported on the further supporting device 1 on a built-tunnel section 50 (see figure description of Figure 5a and 5b). 11
·································································.
In this illustration of FIG. 4, the individual parts of the shield 101 of the shield driving apparatus 100 are readily discernible: the lower part 110, the two side parts 111, the front part 112,
The individual parts 110, 111, 112 are substantially completely watertight, both individually and with respect to one another, so that no groundwater can penetrate into the shield propulsion device 100 through the shield 101.
In the following figure descriptions of Figure 5a to 10b, a process for producing a tunnel 5 is now described in an open design, is digged at a working face 22 gradually and the soil material 21 is discharged upward, and in the corresponding precast to the excavation tunnels segments 50 are strung together, wherein each tunnel segment 50 is lowered from above, wherein at tunnel level a Schildvortriebsvorrichtung 100 is provided, which is supported against the last tunnel segment 50, wherein in one step advancing the Schildvortriebsvorrichtung 100 over at least one tunnel segment length by a support device 120 between the Schildvortriebsvorrichtung 100 and an end face 52 of the tunnel segment 50 is effected, wherein - in a further step, the Schildvortriebsvorrichtung 100 by support cylinder 11,12,13 another support device 1 from the last tunnel segment 50 outside the end face. 5 2 is supported, and - in a further step - after completion of the support of a support device 120 - the top support cylinders 11 of the further support device 1 are retracted when lowering a next tunnel segment 50 to allow the passage of a tunnel segment bottom 51, and - a further step, the top support cylinders 11 are extended through the next tunnel segment 50 back into its supporting position, and in a further step, the next lower support cylinder 12 when lowering the tunnel segment 50th be retracted to allow the passage of the tunnel segment bottom 51, and - in a further step, the next lower support cylinders 12 are extended through the next tunnel segment 50 back into its support position, and - if necessary, the repetition of the two previous steps until the next tunnel segment 50 fa st has lowered completely, and - in a further step, the lowermost support cylinders 13 of the further support device 1 are retracted to allow the passage of the tunnel segment bottom 51, and - in a further step, a support device 120 is attached to the newly lowered tunnel segment 50 to first to line up this tunneling segment 50 on the previously lowered tunneling segment 50, and then to urge the shielding advancing device 100 for the next advance over at least one tunneling segment length.
In Figures 5a and 5b, a Schildvortriebsvorrichtung 100 for producing a tunnel 5 in an open design in a pit 20 is shown with a shield 101, wherein the shield 101 a bottom of the pit 20 facing lower part 110, two the two side walls of the excavation 20th facing side parts 111 and a face 22 of the pit 20 facing front part 112 aulweist and a preferred device 102 with a - especially hydraulic - drive for propelling the shield driving device 100, wherein the propulsion device 102 with a supporting device 120 on a built-in pit 20 tunnel segment 50th supported on the end face 52 - as described in Figures 2a and 2b.
In the figures 5a and 5b now, however, the Schiidvortriebsvorrichtung 100 is supported on a Wettere jack 1 on the built tunnel segment 50 and that outside of the end face 52 of the tunnel segment 50. This can be achieved that another tunnel segment 50 arranged on the already built tunnel segments 50 and can be fastened without causing any damage to the system.
Support the Schildvortriebsvorrichtung 100 on the built tunnel segment 50 would have to be completely canceled.
The support by the further support device 1 takes place via on the one hand hydraulically actuated support cylinders 11,12 and 13 and on the other hand via support members 53 which are arranged releasably fastened in the installed tunnel segment 50.
In this preferred embodiment, the support members 53 are secured to the tunnel segment sidewalls 54. Likewise, it would of course also be conceivable to fasten the support elements 53 to the tunnel segment ceiling 55 and / or to the tunnel segment floor 51. Furthermore, in this preferred embodiment, all support members 53 on the inner sides of the tunnel segment 50 releasably fastened.
As shown in this figure 5b, the conveyor 3 is not needed for the next steps. In the next steps, only a new tunnel segment 50 is added to the already existing tunnel segments 50 or tunnel 5.
In order to allow another tunnel segment 50 to pass on the supporting device 1 of the shield driving device 100, the supporting device 1 has a flow control system which sequentially extends or retracts the supporting cylinders 11, 12 and 13.
In Figure 6a and Figure 6b is shown how the upper support cylinder 11 of the further support device 1 have been retracted, whereby the tunnel segment bottom 51 of the tunnel segment 50, which is just lowered by the lifting device 7, can pass the support cylinder 11. The remaining support cylinders 12 and 13 correspond at this time still with the support members 53 in the already installed tunnel segment 50 and support the Schildvortriebsvorrichtung 100 at the tunnel 5, wherein the
Support device 120 is retracted, the support is thus only on the support cylinders 12 and 13,
After the tunnel segment base 51 has dropped past the upper support cylinder 11 from the tunnel segment 50, the upper support cylinders 11 -as shown in FIGS. 7a and 7b-can again be extended again, and it is again possible to fully support the further support apparatus 1 against the Supporting elements 53 can be achieved in the already installed tunnel segment 50.
It is clearly evident from FIG. 7a that the further supporting device 1 with its supporting cylinders 11, 12 and 13 is not supported on the end face 52 of the tunnel segment 50, but that this support takes place outside the end face 52 of the tunnel segment 50.
Subsequently, the two upper middle of the support cylinder 12 are now retracted to allow passage of the tunnel segment bottom 51 of the tunnel segment 50. After the tunnel segment bottom 51 has passed the upper of the middle support cylinders 12, these support cylinders 12 are extended again and in turn are supported on the support elements 53 in the tunnel segment 50.
Subsequently, the two lower of the middle support cylinder 12 retracted, the tunnel segment 50 can be lowered and lowered past the retracted support cylinders 12 with their tunnel segment bottom 51 and then the lower of the middle support cylinder 12 extended again and a support with the corresponding support members 53 in the already installed Tunnel segment 50 can be achieved.
In the figures 8a and 8b is now shown how the two lowest support cylinder 13 of the further support device 1 are retracted and the tunnel segment bottom 51 of the tunnel segment 50, which is just lowered by the lifting device 7, at these lower support cylinders 13 passes. Meanwhile, a support on the upper support cylinder 11 and the middle support cylinder 12 is given. After the tunnel segment 50 merges with its 15 • ·· «· · ·· * • *
Tunnel segment bottom 51 has moved past the lower support cylinders 13, these support cylinders 13 can be extended again and thus again supported on the support members 53 in the installed tunnel segment 50, as can be seen in Figure 9b.
The propulsion device 102 or its supporting device 120 can now be extended again and the tunnel segment 50 - which has just been lowered by the lifting device 7 into the shield propulsion device 100 - can be arranged on the already installed tunnel segment 50 of the tunnel 5 and be supported on this tunnel segment 50 ,
After this has taken place (see FIGS. 10a and 10b), the support can be released by the further supporting device 1, which happens because the supporting cylinders 11, 12 and 13 of the further supporting device 1 are retracted - as in FIGS. 10a and 10b is shown
The support now again takes place exclusively via the supporting device 120 of the advancing device 102, wherein the supporting device 120 is supported on the end face 52 of the last tunnel segment 50 of the tunnel 5. With this support, further propulsion of the shield propulsion device 101 can now take place, that is to say the excavation device 2 can in turn excavate soil material 21 and the propulsion device 102 can displace the shield propulsion device 100. During the entire process of lowering another tunnel segment 50 and placing the further tunnel segment 50 on the tunnel 5, a support of the shield tunneling apparatus 100 at the tunnel 5 was maintained at all times. Thus, the earth and water pressure, which is applied by the soil material 21 to the shield 101 of the shield tunneling device 100, during the entire lowering of a new tunnel segment 50 by the lifting device 7 can be maintained. 16 •
Especially in soils that have a high groundwater level 23, this is an advantage. For this purpose, it is further advantageous if the Schildvortriebsvorrichtung 100 or its shield 101 is substantially completely waterproof and further provided a sealing device 6 (see Figure 1), which seals the already existing tunnel 5 against the shield 101 of the shield driving device 100 and thus prevents penetration of groundwater.
FIGS. 11a, 11b and 11c show side views in a sectional view and a front view of a shield driving device 100 with a variant of an excavating device 2 or conveying device 3.
The only difference to the previous shield tunneling devices 100 is here that another excavating device 2 is used. This excavating device 2 is again designed as a conveyor 3 - in this case not as a screw conveyor 30, (see Figure 1 and Figure 2b) but as a chain conveyor 31. This chain conveyor 31 has a plurality of conveyor chains 32 (see Figure 11c). These conveyor chains 32 in turn on the one hand on several conveyor pockets 41, with which the dissolved soil material 21 can be transported upwards. The bottom material 21 is loosened in this embodiment by fangs 42. To transport the conveyor chains 32 of the chain conveyor 31 toothed and support wheels 33 are provided (see Figure 11b). The chain conveyor 31 is in turn driven by the drive unit 4. For the rest of the shield driving apparatus 100, what is mentioned with respect to FIG. 1 to FIG. 10b applies mutatis mutandis.
Further details and comments on the construction of a tunnel 5 in open construction with prefabricated tunnel segments 50 in an excavation 20 in relation to the figures:
The use of shield propulsion device 100 is provided in loose material or loose rock, at different Gmndwasserständen or water levels above ground level and overlays on tunnel turrets up to 1.5 times the clear tunnel height. 17 «* * * ·· ··· ···
The clear dimensions of the shield propulsion device 100 result from the following aspects: The width results from the tunnel segment width at the widest point and the required manipulation space for the lowering and mounting of the tunnel segments 50. The length results from the tunnel segment length, the situation of the last staggered tunnel segment 50 in relation to the trailing edge of the shield driving apparatus 100, the length of the presses for advancing the shield driving apparatus 100 and the length of any presses for advancing shoring panels depending on the method of loosening and conveying the soil material 21 in front of the shield driving apparatus 100 and the required manipulation spaces for the individual working steps - The height results from the height of the floor under the gradient of the tunnel tube 5 and the height of the terrain line or the water level above the gradient of the tunnel tube 5. To reduce the height of the Sc In the case of an advancing device 100, the floor can be removed beforehand above a defined parallel to the gradient of the tunnel tube
The thickness of the walls and sole of the shield propulsion apparatus 100 will be understood from the dimensions associated with the applied forces of earth and water pressure and the loads of equipment mounted on the shield propulsion apparatus 100 or acting on the shield propulsion apparatus 100.
To reduce the thickness of the sole, it may be expedient to perform this arched. For static considerations, it may be appropriate to perform the front of the shield tunneling device 100 with a stitch or curved.
In order to enable advancement of the shield tunneling device 100-also referred to below as a mobile excavation pit-the ground 21 is loosened and removed in front of that of the shield tunneling device 100. The excavation of the soil 21 is carried out depending on the loosening method in sections immediately before feeding or simultaneously with the advancement of the mobile excavation pit. 18 18 • Φ Φ * • · · · · · φ • ♦ · ··· · ΦΦ ·· «• · * · φ« «# • * · · · ·»
Depending on the prevailing soil conditions and the presence of water, the following excavation methods are used: - Loosen and excavate the soil 21 using the technology of conventional diaphragm wall grabbers or cutters with fluid support as required. The slot width is to be tuned to the length of the tunnel segments, e.g. equal length or half length of the tunnel segments. Depending on the prevailing soil and water conditions, it may be necessary not to make the slot across the entire construction pit width, but to excavate partial slots, which are mechanically supported with extendable - retractable during advancement - Verbauplatten.
A work cycle contains the processes:
Step 1: Digging the slot in front of the mobile excavation pit, at the same time the lowering of a tunnel segment 50 into the mobile excavation pit and installation of the tunneling segment 50 takes place
Step 2: Advance the mobile excavation, if necessary catch the displaced support liquid. - Loosening and conveying the bottom 21 with a number of auger 30, mounted side by side over the entire width in front of the mobile excavation.
The screws 30 are held in a front open housing at the ends and are connected to the housing vertically slidably connected to the front side 113 of the mobile excavation. For reasons of dimensioning, it may be necessary to provide intermediate supports of the screws 30 in addition to the end holders. The screw edges are equipped with wear steel, which can grind hardeners as required. In the screw housing, water pipes and nozzles are installed as required to release adhesions to the screw 30 / housing at high pressure and to facilitate the vertical conveyance. Depending on the soil and groundwater level, an upward increasing pitch of the screws 30 may be appropriate.
The screws 30 are driven at the top end individually or in groups of electric motors with noise encapsulation. For maintenance purposes, the 19 ♦ · #
Screw 30 with the housing along the guide rails on the front side 113 of the mobile excavation raised from the ground - if necessary, with the introduction of support liquid from below - and a renewed device lowered back into the ground.
The continuously conveyed with the screws 30 bottom 21 is transversely pushed away with mobile device or with stationary Kettenscrapern, loaded and transported away.
A work cycle contains the processes:
Step 1: Loosening and conveying of the floor 21 in front of the mobile excavation corresponding to the length of a tunnel segment 50, at the same time the mobile excavation is advanced
Step 2: Lowering a tunnel segment 50 into the mobile excavation and assembly of the tunnel segment 50
Depending on the soil and the groundwater level, a forwardly inclined position of the screws 30 may be advantageous. Loosening and conveying the floor 21 with a chain conveyor 31 - comparable to the chassis of construction equipment or snow vehicles - side by side mounted over the entire width in front of the mobile excavation. The conveyor chains 32 are made of hinged plates, in which, depending on the upcoming soil chisel, fangs 42, discs for loosening the soil and pockets 41 for conveying the soil are integrated into a cross conveyor belt. In the area of the cross conveyor water lines and nozzles are installed as required to solve adhesive bonds to the pockets 41 and scrapers with high pressure. The conveyor chains 32 are held in place with toothed and support wheels 43 embedded in a frame and individually driven by internal or external electric motors with noise encapsulation. The frame is vertically slidably connected to the front of the mobile excavation. The wear tools can be renewed continuously during delivery breaks. In the event of a chain break or in the case of a general renewal of conveyor chains, they are lifted out of the ground with the frame along the guide rails on the front side of the mobile excavation - if necessary with the introduction of support liquid from below - and a renewed device lowered back into the ground.
Depending on the soil and the groundwater level, a forwardly inclined position of the chain conveyors may be advantageous.
A work cycle contains the processes:
Step 1: Loosening and conveying of the floor 21 in front of the mobile excavation corresponding to the length of a tunnel segment 50, at the same time the mobile excavation is advanced
Step 2: Lowering a tunnel segment 50 in the mobile excavation and installation of the tunnel segment 50 - Dissolve the bottom 21 with water jet and suction of the soil / water mixture
The tunnel segments 50 are protected from the weather in a hall made of reinforced concrete, post-treated and delivered after reaching the transport strength and applying the sealing ring to the installation point. To increase the buoyancy safety lateral spurs can be provided in the tunnel segments 50 at the bottom level. If the tunnel tube 5 is to be produced in a concrete-aggressive medium, special protective layers can be applied. As far as the tunnel tube 5 has curvatures in axis or gradient conical tunnel segments 50 are required in the plan or side elevation, unless the curvature adjustment can be performed by shims. The length of the tunnel segments 50 results from an optimization of the factors such as length of the mobile excavation pit, weight of the tunnel segments 50, pressing dimensions, excavation method, construction time, etc.
The tunnel segments 50 are sealed with circumferential sealing rings on the end faces 52. The sealing effect is achieved by bonding on both sides and the frontal contact pressure by the excavating device 2. In addition, a longitudinal tension of the tunnel segments 50 may be required. As far as troughs are provided in the tunnel entrance sections, the ceiling 55 and corresponding parts of the side walls 54 are omitted in the tunnel segment 50. 21 * * ♦ * * t • · ♦ ·· * # ·· «« ff * * * * * · · ff ♦ · · * · »#
The rear opening of the shield for the exit of the tunnel segments 50 from the mobile excavation is tuned to the geometry of the tunnel segments 50 and takes into account the space for the seal between the tunnel segment 50 and the mobile excavation. The seal is preferably made of a circumferential tube with a lip for attachment to the outlet opening in the Luftdrude or water pressure of the required sealing pressure is produced. To replace wear, a lubricant is provided between the hose and the mobile excavation, loosening the hose and pushing the mobile excavation. The space for the assembly of the new seal is free, the old seal moves with the tunnel segment 50.
The space occupied by the bottom of the mobile excavation under the tunnel-grade floor is continuously grouted during the advancement of the mobile construction pit with mortar via pumping lines embedded in the bottom of the mobile excavation pit.
The tunnel segments 50 are laterally backfilled at the same time with the advance of the mobile excavation pit in the arrangement of spurs and showered with suitable material, with the use of appropriate compaction equipment.
As far as no spurs are provided for the buoyancy protection, the backfilling takes place of the space occupied by the sidewall of the mobile excavation and the sealing hose while moving the mobile excavation with mortar via pumping lines, which are embedded in the side wall of the mobile excavation.
In the arrangement of lateral spurs the backfilling of the space between the side wall of the mobile excavation pit and the side wall of the tunneling segment 50 takes place from above, for example with pearl gravel. For special compaction requirements, for example, vibrating bottles can be mounted parallel to the direction of advance on the rear excavation wall above the spurs. The installation and the compression of the backfill over the spurs can also be done by a worm 60 (see FIG. 1) with the pitch decreasing downwards, directly behind the rear side 114 (see FIGS. 2a and 2b) of the mobile excavation pit.
Depending on the groundwater level, there is a deficit in buoyancy safety in the area between the back wall of the excavation and the complete cover. This deficit can be compensated by a mobile ballast in the tunnel tube 5 following the propulsion.
The lateral earth and water pressures are absorbed by the mobile excavation pit. The frontal earth and water pressure, which is not absorbed by friction in the sole and the sidewalls of the mobile excavation, is to be transferred to the sidewalls of the last installed tunnel segments 50 during the lowering and assembly of the tunnel segments 50.
The feed of the mobile excavation is carried out by means of pressing, which act on the front surfaces of the tunnel segments 50, wherein in addition to the frontal earth and water pressure and the friction in the sole and the side walls of the mobile excavation is overcome.
A working cycle for the construction of the tunnel tube 5 includes the operations:
Step 1: Attaching the side inner revealing presses (supporting cylinders 11, 12, 13)
Step 2: Pulling in the end presses (120)
Step 3: Lowering of the tunnel segment 50 with alternating draw-in and extension of the affected inner soffit presses (support cylinders 11, 12, 13) during the passage of the tunnel segment sole (tunnel segment bottom 51)
Step 4: Adjust the tunnel segment 50 and, if necessary, clamp it with the last installed tunnel segment 50
Step 5: Extend the forehead presses and advance the mobile excavation pit
To control the mobile excavation pit in the direction of advance, the following measures are required, individually or in combination: - Conicality of the mobile excavation walls - Adjustable bottom and side cutting edges - Pressures that are variable in cross section - Different soil conveying rates across the working face / tunnel tube 5 - Grouting of mortar under the excavation bottom - Application of ballast - rope tensioning with anchoring in the built tunnel tube 5
The starting process with the mobile excavation pit depends on the situation of the intended use and the preparatory measures. For example, two situations are shown below: - Broken incision without support measures in the inclined starting wall:
The mobile excavation pit and the take-off stand to absorb the reaction forces for propulsion are mounted in the recess and the tunneling started - Excavation pit with support measures:
The support measures in the Anfahrwand must be span- or detachable with the proposed release devices, alternatively, a removal of the support measures in the Anfahrwand under taking over the earth pressure forces provided by the mobile excavation. The mobile excavation and the launching trestle for receiving the reaction forces for propulsion are mounted in the excavation pit and the excavation started
List of Reference Signs: 1 Further supporting device 2 Excavating device 3 Conveying device 4 Drive unit 5 Tunnel 6 Sealing device
7 Lifting device 8 Drive device 11 Upper support cylinders 12 Middle support cylinders 13 Lower Support cylinder 20 excavation pit 21 soil material 22 working face 23 groundwater level 30 screw conveyor 31 chain conveyor 32 conveyor chains 41 conveyor pockets 42 fangs 43 tooth and support wheels 50 tunnel segments 51 tunnel segment floor 52 front end tunnel segment 53 support elements 54 tunnel segment sidewalls 55 tunnel segment ceiling 60 auger 100 shield propulsion device 101 shield 102 propulsion device 110 bottom plate shield 111 side panels Shield 112 Front Shield 113 Outside Shield 114 Rear Shield 120 Stabilizer
Innsbruck, September 15, 2011
权利要求:
Claims (10)
[1]
1 1. 69960 23 / cr Μ «- • • • • • • • • • • • • • • • • • • • II II II II II II II II II II II II II II II II II II II II II II II A shield propulsion apparatus (100) for producing a tunnel (5) in an open construction in an excavation (20), comprising: - a shield (101), wherein the shield (101) a bottom part (110) facing a bottom of the excavation (20), two side parts (111) facing the two side walls of the excavation (20) and a front part (112) facing a working face (22) of the excavation (20), - A propulsion device (102) with a - in particular hydraulic drive for propelling the Schildvortriebsvorrichtung (100), wherein the propulsion device (102) with a supporting device (120) on a in the excavation (20) installed tunnel segment (50) at the end face (52) is supported, characterized in that a further supporting device (1) is provided, the Schildvortriebsvorrichtung (100) on the installed tunnel segment (50) outside of its end face (52) is supported.
[2]
2. Schildvortriebsvorrichtung according to claim 1, characterized in that the further supporting device (1) has a - preferably hydraulic -Antriebsvorrichtung (8) for supporting the Schildvortriebsvorrichtung (100) on the installed tunnel segment (50).
[3]
3. shield propulsion device according to claim 1 or 2, characterized in that support elements (53) are provided on which the further supporting device (1) on the built tunnel segment (50) is supported, wherein the support elements (53) on an inner side of the tunnel segment (50) are releasably fastened.
[4]
4. shield propulsion device according to claim 3, characterized in that the support elements (53) at a tunnel segment bottom (51) and / or at 9 2 • · ** • * * * * * «9 9 • · 9 9» · 9 ** 9 * 9 Μ · 9 * * * * 9 9 9 9 9 9 9 9 9 9 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 ) are releasably attachable to the inside of the tunnel segment (50).
[5]
5. shield driving apparatus according to claim 3 or 4, characterized in that the drive device (8) of the further support device (1) at least two or more - preferably hydraulically actuated -Abstützzylinder (11,12, 13), wherein the support cylinders (11, 12 , 13) with the support elements (53) in the installed tunnel segment (50) correspond.
[6]
6. Schildvortriebsvorrichtung according to claim 5, characterized in that the further supporting device (1) has a flow control, which retracts the at least two or more support cylinders (11,12,13) successively in time and extends.
[7]
7. Schildvortriebsvorrichtung according to one of claims 1 to 6, characterized in that the shield (101) of the Schildvortriebsvorrichtung (100) is substantially completely waterproof.
[8]
8. Schildvortriebsvorrichtung according to one of claims 1 to 7, characterized in that the Schildvortriebsvorrichtung (100) has a sealing device (6), wherein the Abdichtvomchtung (6) the shield (101) and the built tunnel segment (50) to the pit (20) essentially completely watertight.
[9]
9. shield propulsion apparatus according to one of claims 1 to 8, characterized in that the shield propulsion device (1) has a lifting device (7) for lowering tunnel segments (50) in the shield propulsion device (100). 11. The apparatus according to claim 1, wherein the shield driving apparatus (100) has an excavating device (2) for excavating the soil material (21) on the 3 * * 1 ··· * * ·· ·· · # · * Orts · Orts Orts 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112.
[10]
11. A method for producing a tunnel (5) in open construction, wherein at a working face (22) is gradually dug and the soil material (21) is discharged upward, and in the corresponding precast to the excavation tunnel segments (50) are strung together wherein each tunnel segment (50) is lowered from above, wherein at tunnel level a shield propulsion device (100) is provided - in particular a shield propulsion device (100) according to any one of claims 1 to 10, which bears against the last tunnel segment (50) in one step, an advance of the Schildvortriebsvorrichtung (100) over at least one tunnel segment length by a supporting device (120) between the Schildvortriebsvorrichtung (100) and an end face (52) of the tunnel segment (50) is effected, characterized in that - in a further step the shield advancing device (100) by supporting cylinders (11, 12, 13) of a further supporting device (1) from the last tunnel segment (50) is supported outside the end face (52), and - in a further step - after completion of the support of a support device (120) - the top support cylinder (11) of the further support device (1) when lowering a next Tunnel segments (50) are retracted to allow the passage of a Tunnelsegmentbodens (51), and - in a further step, the uppermost support cylinder (11) are extended through the next tunnel segment (50) back into its supporting position, and - in another Step the next lower support cylinders (12) are drawn when lowering the tunnel segment (50) to allow the passage of the tunnel segment bottom (51), and - in a further step, the next lower support cylinder (12) through the next tunnel segment (50) therethrough be returned to its support position, and - if necessary, the repetition of the two previous ones Steps until the next tunnel segment (50) has almost completely lowered, and - in a further step, the lowermost support cylinders (13) of the further support device (1) are retracted to allow passage of the tunnel segment tray (51), and - in one further step, a support device (120) on the newly lowered tunnel segment (50) is set to first line this tunnel segment (50) on the previously lowered tunnel segment (50) and then the Schildvortriebsvorrichtung (100) for the next feed over at least one tunnel segment length to act on. Innsbruck, September 15, 2011
类似技术:
公开号 | 公开日 | 专利标题
DE2615395A1|1976-10-21|PROCESS AND DEVICE FOR THE SUCCESSIVE INDEPENDENT DRIVING OF SEVERAL UNITS
EP1862637A1|2007-12-05|Device and method for a shield driving start-up and extension
EP2758633B1|2014-12-17|Shield driving device
DE1658751A1|1970-11-05|Method and device for creating tunnels, tunnels or the like in mountains with changing stability in zones
EP0257652B1|1992-04-01|Method of and device for driving a coal winning gallery partly in the footwall of a seam
DE102011108093A1|2013-01-24|Prefabricated carriageway for inclined conveyor system for mining pressure
DE202012008809U1|2012-10-16|Shielding apparatus
WO1995015418A1|1995-06-08|Process and device used to renovate railroad track installations
AT13223U1|2013-08-15|Shielding apparatus
DE202017000916U1|2017-03-03|Device for expanding a tunnel, in particular a railway tunnel
DE620764C|1935-11-04|Driving shield for the creation of tunnels or galleries in soft or water-bearing soil
EP0230667B1|1991-07-24|Method for the stripe-wise removal of subsoil layers, especially non-rigid ones
DE3627270A1|1988-02-18|Driving shield, in particular for driving with a heading face supported by earth pressure, with a screw conveyor for the earth moving
DE2704222C3|1981-11-19|Procedure and multi-purpose platform for the expansion of sections of mining and tunneling that were excavated by blasting
DE2544834B2|1978-01-12|PROCEDURE FOR BOLTING DAMPS IN UNSTILL MOUNTAINS AND SHIELD DRIVING DEVICE FOR CARRYING OUT THE PROCEDURE
DE3009923A1|1981-10-01|METHOD AND DEVICE FOR DISASSEMBLING THE PILLARS IN CHAMBER PILLAR CONSTRUCTION
DE3739680A1|1989-06-15|MACHINE AND METHOD FOR CONTINUOUSLY RELEASING STONE OD. DGL. AND RECOVERY OF THE SOLVED, CRUSHED PLANT IN THE MINING, EARTH AND TUNNEL CONSTRUCTION
DE2508407A1|1976-09-16|PROCEDURE AND EQUIPMENT FOR DRIVING TUNNELS ETC.
DE3442871C2|1987-11-26|
DE3232906C2|1993-08-19|
DE3531183A1|1987-03-12|Nocturnal landfill sealing
DE102007004425A1|2008-07-24|Slot cutter is attached on winding rope of hoist of support device and is connected over energy strip with energy supply station of support device and is vertically guided on guide post
EP0233979B1|1990-06-20|Sealing of dumps
WO2000039434A1|2000-07-06|Method and device for constructing tunnels
DE2161291A1|1972-08-03|Movable ceiling support, especially for mining
同族专利:
公开号 | 公开日
EP2758633A2|2014-07-30|
WO2013040613A3|2013-07-25|
AT511199B1|2012-10-15|
WO2013040613A2|2013-03-28|
EP2758633B1|2014-12-17|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题

DE2826580C2|1978-06-16|1986-06-26|Gewerkschaft Eisenhütte Westfalia, 4670 Lünen|Device for erecting a tubular structure or the like in an open trench sheeting|
DE2913091C2|1979-04-02|1987-10-08|Gewerkschaft Eisenhuette Westfalia Gmbh, 4670 Luenen, De|
DE3134071A1|1981-08-28|1983-03-10|Gewerkschaft Eisenhütte Westfalia, 4670 Lünen|Sliding cutter sheeting for trench driving for carrying out pipe-laying work in the ground|
JP3996597B2|2004-12-20|2007-10-24|誠 植村|Open shield machine and open shield method using it|
EP1904716B1|2005-07-12|2008-12-31|Stefan Trümpi|Underground construction of a pipeline|CN106593455B|2017-02-27|2018-02-09|中铁工程装备集团有限公司|A kind of full advance self-travel type U-shaped shield machine|
CN112854238A|2021-01-11|2021-05-28|上海市政工程设计研究总院(集团)有限公司|Open trench tunnel staged construction joint foundation pit supporting system and construction method thereof|
法律状态:
2018-05-15| MM01| Lapse because of not paying annual fees|Effective date: 20170920 |
优先权:
申请号 | 申请日 | 专利标题
ATA1354/2011A|AT511199B1|2011-09-20|2011-09-20|SHIELD TUNNELING DEVICE|ATA1354/2011A| AT511199B1|2011-09-20|2011-09-20|SHIELD TUNNELING DEVICE|
PCT/AT2012/000230| WO2013040613A2|2011-09-20|2012-09-07|Shield driving device|
EP12777841.3A| EP2758633B1|2011-09-20|2012-09-07|Shield driving device|